HomeMy WebLinkAboutFBC ENERGY CONSERVATIONPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: �' Permit #. _
Contractor.
Construction: -d,Post Construction Test
1706-6;2,33
Address: -
❑ Rough -in Test
Lot
Z f S �" ti
FL , 3AgTT
Test Conditions: v
Date: 1 ° 1 0 Floor Area (ft2): 26'
Time: Primary Location of Supply Ductwork e, L - _
Indoor Temperature (F): Primary Location of Return Ductwork -r-
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free pOroposed On
Test Pressure: Z (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Ass ❑ Fail
Installed
'91D 3 l `1 Y n 2 1 ey Total Leakage (cfm):
Total Leakage per 100 sgft: 3
CFM25 x 100 divided by the CFA = Duct Leakage CFMI100 sqft.
Testing Company C /
Company Name: S 7 `e-�Z� Address:
I hereby certify that the ab ve Duct Sealing Leakage results demonstrate compliance with 5'h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: � n Vv
Printed Name: c►� `'�— 1 °`` License/Certificate A V