Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST 12-1-17Phone 954-784-2941 ederaDEC 0 1 �017 800-848-1919 t, -.. : , , , ; Fax 954-784-7875 & TESTING INC. ; , www.fed-eng.com L4 250 SW 13th Ave Pompano Beach, FL 33059 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 82, Creekside Date: July 26, 2017 Address: 8465 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 17-DR-768 Area Tested: Building Pad Permit #: Material Type: Pale Brown Sand Tech:. BK Client: D.R.-Horton, Inc. Address: 1430 Culver Drive NE Compaction Re q.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Pad 12" FL 8.2 104.0 105.3 14.0 98.8% Yes 2 SE Corner of Pad 12" FL 8.0 1012 105.3 14.0 98.0% Yes 3 NW Corner of Pad 12"' FL 9.5 104.8 106.3 14.0 99.5% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil -Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: _ SL = Springline FL = Final Lift Keith; eBlanc, P.E. 7/2, SG = Subgrade BG =Below Grade r. ederal Engineering & Testing,' Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. No.59394 - TOP = Top of Pipe FG = Finished Grade Certificate df /authorization #5471, As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authortzation for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the dagme of 6ompdd6n'of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify theunderlying-soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required-" ceitify:.that ihe`ti ideiiying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recomme d-that'soil`boring"si be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy raWs64 retesting must be performed on this work. PAGE 1 of 2 Com Pursuant to your request, Federal Engineerh project on the. reverse. side. The purpose of material only. In no way shall a compaction performed by the client prior to construction tc 12" of added fill material. FET was not cont the added fill material does not include an supporting the proposed structure without se, materials or conditions below the tested top 1 the proposed structure, we recommend perf verify the underlying soil conditions. Solis Method D-6938 Disclaimer g & Testing, Inc. (FET) has performed a compaction test at the referenced our test was to determine the degree of compaction of the tested layer of :st replace a soil bearing capacity determination. A soil boring test must be verify subsoil conditions. Our scope of services only included testing the top acted to perform supervision of the building pad preparation. This testing of nalysis of the underlying soil materials to determine if they are capable of ement. This density compaction test does not warranty any underlying soil !I inches of material. If no soil borings have been performed in the location of ping soil borings below all foundation areas of the proposed structure to Environmental analysis of the soil materials is Inot part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for perform''ng an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at t e time the work was performed. Determination of the pass/fail compaction results are based on current common industry r quirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paled areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas Qf our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and of er disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual 'protection to clients, the public and urselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the.near future.