Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 82, Creekside Date: July 26, 2017
Address: 8465'C6bblest6ne'Drive, 1=6rt Pierce, FL 34945 Order #: 17-DR-768
Area Tested: Building Pad Permit #:
Material Type: Pale Brown Sand Tech: BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.:
Palm Bay, FL 32907 Proctor Method:
95% .
ASTM D-1557
Test
#
TEST LOCATION.
Probe
Depth
Elev.
Moist
%
Pry
Density
PCF
Proctor
Value
PCF
'Optimum
Moisture
Compaction
Pass
1
lCenter of Pad
12"
FL
1 8.2
104.0
105.3
14.0
98.8%
Yes
2
ISE Corner of Pad
12".
FL
8.0.
„103.2
105.3,
14.0
98.0%
Yes
3
NW Corner of Pad
12"
FL
9.5
104.8
105.3
14.0
99.5%
Yes
4
5
6
7
8
9
10
11
12
13
14
rxe r ratrc5: see Keverse 51cfe (Page 2 of 2) for Additional Information for Disclaimer
This Is a Compaction Test only on the top 12" of the pad and is not a verification of §oil Bearing Capacity.
Legend for Elevation: .: `X `,;�
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by,, .
SL = Springline FL = Final Lift Keith Le31anc, P.E:
SG = Subgrade BG = Below Grade - Federal Engineering o Testing, Inc.
BC = Basecourse BOF = Bottom of Footing Flohda Rig: No. 59'194 -
TOP = Top of Pipe FG = Finished Grade Certificate; of Authorization#5471
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property cf cli"sets; anil authorization'or publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A deirslty test determines the degree ofi compaction of the tested layer of
material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the- underlying soil. mat&iats below the proposed structure.
The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring. tesf Lg required to certify that the underlying soils will support the
proposed structure without settlement If no soil borings have been performed to verify the underlying soils; we-?ecornmend that,�s fp6nngs be performed to evaluate the
suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after i-E-i411rair/storms, retesting must be performed on this
work. , ( ,
PAGE 1. of 2
Compacted Soils Method ®-6938 Disclaimer
Pursuant to your request, Federal Enginee
project on the reverse side. The purpose
material only. In no way shall a compactior
performed by the client prior to construction
12" of added fill material. FET was not co
the added fill material does not include ar
supporting the proposed structure without
materials or conditions below the tested top
the proposed structure, we recommend pE
verify the underlying soil conditions.
ng & Testing, Inc. (FET) has performed a compaction test at the referenced
f our test was to determine the degree of compaction of the tested layer of
test replace a soil bearing capacity determination. A soil boring test must be
o verify subsoil conditions. Our scope of services only included testing the top
tracted to perform supervision of the building pad preparation. This testing of
analysis of the underlying soil materials to determine if they are capable of
;ttlement. This density compaction test does not warranty any underlying soil
12 inches of material. If no soil borings have been performed in the location of
forming soil borings below all foundation areas of the proposed structure to
Environmental analysis of the soil materials is not part of the scope of ,services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer -of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard or paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, I c. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities,
excavations, overgrown, vegetation, tratt and other disturbances will void this test and the site must be re -compacted and
re -tested prior to construction.
As a mutual, protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication if statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
AedeO&l
& TESTING INC.
250 SW 13th Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
www.fed-eng.com
Project: Proposed Residence Lot 82, Creekside Date: July 26, 2017
Address: 8465 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 17-DR-769
Area Tested: Building Pad Permit #:
Material Type: Pale Brown Sand Tech: BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req
95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
01,
Dry
Density
PCF
Proctor
Value
PCF
'Optimum
Moisture
%
Compaction
Pass
1
Center of Pad
12"
FL
8.2
104.0
105.3
14.0
98.8%
Yes
2
ISE Corner of Pad
12"
1 FL
8.0
103.2
105.3
14.0
98.0%
Yes
3
NW Corner of Pad
12"
FL
9.5
104.8
105.3
14.0
99.5%
Yes
4
5
6
7
8
9
10
11
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity.
Legend for Elevation: --
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted F,y: J •
SL = Springline FL = Final Lift _ Keiih LeBlanc;-F.E„
SG = Subgrade BG = Below Grade 21 Federal Engineering"& T-esting, Inc.
BC = Basecourse BOF = Bottom of Footing _ Florida Reg. No. 59394 e;
TOP = Top of Pipe FG = Finished Grade Certificate of atiun #5471
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential_ property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the -.degyee', c�ampaction of the tested layer of
material only. A density does not replace a soil bearing capacity determination. These density tests do 'not certify the 6ndarayirig soil 6,a6rials below the proposed structure.
The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring'tesIf i:, required`to eerrify' that the underlying soils will support the
proposed structure without settlement. If no soil borings have been performed to verify the underlying soils; 'we'�ecominehd t at.soil borings be performed to evaluate the
suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy jaiinlsiorms, retesting must be performed on this
work.
PAGE 1 of 2
0.
0
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction tolverify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of
the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of
supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil
materials or conditions below the tested top 12 Iinches of material. If no soil borings have been performed in the location of
the proposed structure, we recommend performing soil borings below all foundation. areas of the proposed structure to
verify the underlying soil conditions. I
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at thtime the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shal� be notified.
Our findirigs are relative to the date and areas of� our site work and shouldnot be relied upon to represent conditions on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities,
excavations, overgrown, vegetation, traffic and othler disturbances will void this test and the site must be re -compacted and
re -tested prior to construction. I
As a mutual protection to clients, the public and ou' selves, all reports are submitted are the confidential property of clients
and authorization for use, publication of stateme ts, conclusions or extracts from or regarding our reports is reserved
pending written, approval.
It has been a pleasure working with you and we Iook�forward to doing so in the near future.
2 of 2