HomeMy WebLinkAboutFIELD DENSITY TEST 7-27-17Phone 954-784 2941 ee r - ..-. ��� �' f �' 800-848-1919 Fax 954-784-7875 & TESTING INC. y www.fed-eng.com 250 SW 13th Ave Pompano Beach, Fl. =69 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot. 82, Creekside Date: July 26, 2017 Address: 8465 Cobblestone, Drive, Fort Pierce, FL 34945 Order #: 17-DR-768 Area Tested: Building Pad Permit #: D(k - 62-3 3 Material Type: Pale Brown Sand Tech:. BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture /o Compaction Pass 1 Center of Pad 12" FL 8.2 104.0 105.3 14.0 98.8% Yes 2 SE Corner of Pad 12" FL 8.0 1012, 105.3 14.0 98.0% Yes 3 NW Corner of Pad 12" FL 9.5 104.8 105.3 14.0 99.5% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil BAarino'Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL =Final Lift KeitO.'eBlzinb�;-P,E, 7,r� (, SG = Subgrade BG = Below Grade FILE Federal Erlgirieering & Testing, Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg"Igo. 59394 - CoPY _ TOP -Top of Pipe FG - Finished Grade Certificate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and,authorization for publication of statements, conclusions or extracts from or regarding our. reports is reserved pending our written approval. A density test determines th6;de6rse of compaction of the, tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying`soil`mate�iais below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify'that#f :e gdermng soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. W PAGE 1 of 2 Compacted;Soils Pursuant to your request, Federal Engineerirg`&'Te; project on the reverse side. The purpos' of our tes 11 material only. In no way shall a compaction test °replcl performed by the client prior to dbnstruction to'Verify s 12" of added fill material,., FET, was not,contracted tc the added fill material does .not..include-an.'analysis supporting the proposed structure without settlement. materials or conditions below the tested top 12 inches the proposed structure, we recommend performing verify the underlying soil conditions. Method D-6938 Disclaimer ing, Inc. (FET) has performed a compaction test at the referenced was to determine the degree of compaction of the tested layer of ;e a soil bearing capacity determination. A soil boring test must be bsoil conditions. Our scope of services only included testing the top perform supervision of the building pad preparation. This testing of if the underlying soil materials to determine if they are capable of This density compaction test does not warranty any underlying soil )f material. If no soil borings have been performed in the location of iil borings below all foundation areas of the proposed structure to Environmental analysis of the soil materials is not partM the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time t l� e work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. I As a mutual protection to clients, the public and ourselves,lall reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. I It has been a pleasure working with you and we look forward�to doing so in the near future.