HomeMy WebLinkAboutGFA INTERNATIONAL REPORTGFA INTERNATIONAL
FLORIDA'S LEADING ENGINEERING SOURCE
Report of Geotechni.dal Exploration
Proposed 3-Level. Residence
Sea Oats Lot 7, Anacostia Place
St, -Lucie County, Florida
OZGDODOD
faQppDDtln
CAVQtlp
.........
January'21 1 2016
GFA Project No..:16-0074.00
Fonil Masterpiece Builders.
.................. . . . . . . . . . . . .
...........
'99N , N!".
P %
He Copy
Florida's Leading Engineering Source
Environmental - Geotechnical -Construction Materials. Testing -Threshold and Special Inspections -Plan Review & Code Compliance
Masterpiece Builders
Attention: Jeff Bowers
408 Colorado Avenue
Stuart, Florida 34994
Site: Proposed 3-Level Residence
Sea Oats Lot 7, Anacostia Place
St. Lucie County, Florida
GFA Project# 16-0074.00
Dear Mr. Bowers:
January 21, 2016
GFA International, Inc. (GFA) has completed the, subsurface exploration and geotechnical
engineering evaluation for the above -referenced project in accordance with the geotechnical
and engineering service agreement for this project. The scope of services was completed 'in
accordance with our Geotechnical Engineering Proposal (16-0074.00) dated January 11, 2016,
planned in conjunction with and authorized by you.
EXECUTIVE SUMMARY
The purpose of our subsurface exploration was to classify the nature of'the subsurface soils and
general geomorphic conditions and evaluate their impact upon the proposed construction. This
report contains the results of our subsurface exploration .at the site and our engineering
interpretations of these, with respect to. the project characteristics described to us including
providing recommendations for site preparation and the design of the foundation system.
Based on conversations with the client, the project consists of constructing a three-story
residence. The residential structure (or portion thereof) will be located east of the Coastal
Construction Control Line (CCCL) and therefore a pile supported foundation is required. GFA
assumes that the residence will be three levels, or will be elevated above a lower level garage
that will have walls and ground floor slab of frangible breakaway design.
Based on a site visit and elevations from topographic data from GoogleEarth website, the
current grade at the location of the proposed residence was about +6 feet NGVD. Assuming the
proposed house will have a grade about equal to the nearby residences, the site is at, or near,
final grade.
The recommendations provided herein are based upon the above considerations. If the project
description has been revised, please inform GFA International so that we may review our
recommendations with respect to any modifications.
A total of two (2) standard penetration test (SPT) borings to depths of approximately thirty-five
(35) feet below ground surface (BGS) were completed for this study. .
521 NW Enterprise Drive • Port St. Lucie, Florida 34986 a (772) 924.3575
924.3580 (fax) a www.teamgfa.com
OFFICES THROUGHOUT FLORIDA
Proposed 3-Level Residence Geotechnicai Report -
Sea 06ts1ot 7, Anacostia. Place, St. Lucie County, FL January`21, 2016
GFA Project No: 16-0074.00 Page 2 of 13
The subsurface soil conditions encountered at this site generally consist of very loose to
.medium dense sand to silty/clayey sand (SP,SP-SM,SM,SC) to 15 feet, medium dense sand
with some shell (SP) from 15 to 28'h feet, and then .dense to very dense sand with some shell
(SP) to the boring. termination depths. Please refer to Appendix D - Record of Test Borings for a
detailed account of each boring and sounding.
GFA recommends: that the proposed residence be supported using a deep foundation system
consisting ;of augered cast=in-place (ACIP) ;piles. Based on our analysis, GFA has estimated
that a 14 ,or 16-inch-diameter, ACIP pile installed to a depth of 32 feet below grade existing
grade can provide a maximum allowable axial compressive capacity of 40 tons and a maximum
tension capacity of 7 tons.
The pile installation 'length is based on 'installing the piles at site grade (grade about 1 foot'
above the adjacent roadway) existing at time of drilling. If additional. fill will be required to raise
the site to achieve final grade, the piles will be longer; according to the depth of fill added. Very
dense/hard soils may be encountered with auger refusal. The piles may be installed prior to
achieving the required depth if there is auger refusal. Refusal is defined as a minimum of 3
minutes drilling for 3 inches or less auger penetration 'into rock.
For the ground supported frangible walls, an allowable bearing capacity of 2,50.0 psf may be
used for shallow footing foundation design.
The, subgrade soils should be improved with compaction from the stripped grade prior to
constructing the foundation pads and footing excavations. The top 2 feet below stripped grade
should be compacted to a minimum of 95% density, prior to placing fill to achieve final grade.
Fill (including stemwall backfill) shouldbe placed in 92-inch lifts and compacted, to achieve a
minimum :95% density. After excavation for footings, the subgrade to a depth of 2 feet below
bottom of footings should be compacted to achieve a rhinimum.95% density.
Scour elevations used in pile calculations are. those ;provided by the Florida DEP for coastal,
construction, but may not be adequate for actual scour elevations in hurricane(s) event(s)that
exceed the DEP assumptions and cause lower scour elevations: Therefore, GFA analysis is
limited to that provided by the DEP scour elevation, and scour analysis is not included in our.
scope of work.
6
fi�
Proposed 3-Level Residence
Sea Oats Lot. 7, Anacostia Place, St Lucie County,. FL
GFA.Project No. 16-0074.00
Geotechnica/ Report
January 21, 2016
Page 3of13
We "appreciate the opportunity to be of service to you on this project and look forward to a
continued association. Please do not hesitate to contact us if you have any questions or
comments, or if we may further assist you as your plans proceed.
�e���ssscs"s®e$
RespecNliyu�Pr`'�od�
GFA 10`t�,a��' Ih�,���
Flori,. ate of Authoriz*ion Number 4930
o I W. Moler, E. o r g an Collie, E.I.
Senor Geotechnical Enmr� P ct Manager
Florid4 ftjstration�No.,W00
�a
Copies:
GF�
Proposed 3-Level Residence
Geotechnical Report
Sea Oats Lot 7, Anacostia. Place, St. Lucie County, FL
January 21, 2016
GFA Project No. 16-0074.00
Page 4 of 13
TABLE OF CONTENTS
1.0 INTRODUCTION...................... ..........::....... ......................... :............:.......:....:.....:...............5
1.1 Scope of Services.............................................................................................................
5
1.2 Project Description.....................:.......................................................................................5
2:0 OBSERVATIONS............................._................................................_..............................:...6
2.1 Site Inspection ................. ....
.6
.
........
2.2 Field Exploration ......................................................................................................6
2.3 Laboratory Analysis...........................................................................................................6
..
2.4 Geomorphic Conditions.......:............................................................................................6
2.5 Hydrogeological Conditions................................................................................................7
3.0 ENGINEERING EVALUATION AND- RECOMMENDATIONS...............................................7
3.1 Foundation Recommendations - General ................... :... ..................................................
7
3.2 Pile Foundation.......:::...........:.........................:................................................................7
3.3 Pile Installation..............................................................................:._................................9
3.4 Vibration Monitoring..................:.....:....................:.....:...........:..........................................9
3.5 Design of Footings (Ground Level Frangible Walls).......................................................10
3.6 Ground Floor Slab (Frangible)........................................................................................10
3.7 Site Preparation.............................................................................................................10
3.8 Excavation Conditions.....................................................................................................12
4.0 REPORT LIMITATIONS......................................................................................................12
5.0 BASIS FOR RECOMMENDATIONS............................:................................._...................13
Appendix A - Vicinity .Map
Appendix B - Test Location Plan
Appendix C - Notes Related to Borings
Appendix D - Record of Test Borings
Appendix E - Discussion of Soil Groups
GF�
Proposed 3-Level Residence Geotechnical Report
Sea Oats Lot 7, Anacostia Place, St. Lucie County, FL January 21,_ 2016
GFA Project No. 16=0074.00: Page 5 of 13
1.0- INTRODUCTION
1.1 Scope of Services
The objective of our geotechnical services ,was to collect subsurface data for the subject project,
summarize the test results, and discuss any apparent site conditions that may have
geotechnical significance for building construction. The following scope of services are provided
within'this report:
1. Prepare records of'the soil boring logs depicting the subsurface. soil conditions encountered
during our field exploration.
2, Conduct a review of each soil sample obtained during our field exploration for classification
and additional testing if necessary., .
3. Analyze the existing soil. conditions found. during our :exploration with respect to foundation
support for the' proposed structure.
4. Provide recommendations with respect to foundation support of the structure, including
allowable soil -bearing capacity, bearing elevations,', and foundation design parameters.
5. Provide criteria and site preparation procedures to prepare 'the site for the proposed
construction.
1,2 Project Description
Based on conversations with the client, the project; consists of constructing a three-story
residence. The residential structure (or portion thereof) will. be located east of the Coastal
Construction Control Line (CCCL) and therefore a pile supported foundation is required. GFA
assumes that the residence will be three levels, -or will !be elevated above a lower level garage
that will have walls and ground floor slab of frangible breakaway design.
Based on a site visit and elevations from topographic data from GoogleEarth website, the
current gradeat the location of the proposed residence was about +6. feet NGVD. Assuming the
proposed house will have a grade about equal to the nearby. residences, the site is at,: or near;.
final .grade.
We assume the residence will have typical construction, and 'be supported on columns
terminating on pile caps slightly -
..below the ground level elevation and top of piles (bottom of pile
caps) would be at about existing grade..
We have not received any' information regarding structural loads. For the foundation
recommendations, presented in this report we assumed the maximum column, load will be 75
kips and the maximum wall loading will be 4 kips per linear foot.
The -recommendations provided herein are based upon the above considerations: If the project
description has been revised, please inform GFA International so that we may review our
recommendations with respect to. any modifications.
Proposed 3-Level Residence
Sea Oats Lot 7, Anacostia Place, St Lucie County, FL.
GFA Project No. 16-0074:00
2.0 OBSERVATIONS
24 Site Inspection
Geotechnical Report
January 21, 2016
Page 6 of 13
'The project site. was generally flat and had been cleared. The site was about 1 foot above the
adjacent roadway. The Atlantic Ocean bordered the east side -of the property.
2.1 Field Exploration
A total: of two (2) standard, penetration test (SPT) borings. to depths of approximately thirty-five
(35) 'feet below ground surface (BGS) were c0mpI6Q for this 'study. The locations of the:
borings performed are illustrated in Appendix B: "Test Location Plan". The Standard Penetration
Test (SPT) method was used as. the investigative: tools within the borings. SPT tests were
performed insubstantial accordance with ASTM Procedure D-1-586, "Penetration Test. and' Split
Barrel Sampling of Soils". The. SPT test procedure consists of driving a 1.4-inch I.D. split -tube
sampler into the soil "profile using a 140-pound hammer. falling 30 -inches. The number of blows
per foot, for the second and third 6-inch increment, is an, indication of:soil strength.
The soil samples recovered from :the soil borings were visually classified and their stratification
is illustrated in Appendix D:.`'Record of Test Borings".' It should be noted that soil conditions
might vary between the strata interfaces, which are , shown. The _soil boring data reflect
information from a specific test location only. Site specific survey staking for the test locations
was not provided for our field exploration.. The indicated depth and location of each test was
approximated based upon existing grade and estimated, distances and relationships to obvious
landmarks. The boring depths, were confined to the zone of soil likely to be stressed by the
proposed construction and knowledge of vicinity soils.
2.3 Laboratory Analysis
Soil. samples recovered from our field exploration were;_returned to our laboratory where they
were visually examined .in general accordance with ASTM D-2488. Samples were evaluated to
obtain an accurate understanding of the soil properties and site geomorphic conditions. After a.
thorough. visual examination of the recovered site soils, no laboratory testing was deemed
necessary. Bag samples of the soil encountered during "our field exploration will be held in our
laboratory for your inspection for 30 days and then -discarded unless we are notified otherwise in
writing.
The recovered samples were not examined, either visually or analytically, for chemical
composition or environmental hazards. GFA would be pleased to perform these services for an
additional fee, if required.
2.4 Geomorphic Conditions
The geology of the site as mapped on the USDA Soil Survey website consists of Kesson-Terra
Ceia complex, tidal (35) on the east side of the site and Canaveral fine sand, 0 to 5 percent
slopes (10) on the west side of the site. These are sandy soils and organic soils are not
indicated. It should be noted that the Soil Survey generally extends to a maximum depth.of 80
inches (approximately 63/ feet) below ground surface and is not indicative of deeper soil
conditions.
GF�
Proposed 3-Level'Residence
Sea`Oats Lot 7,-Anacostia Place, St. Lucie County, FL
GFA Project No. 16-0074.00
Geotechnical Report
January 21; 201.6
Page 7 of `13
Boring dogs derived from our field exploration are presented in Appendix D: "Record of Test
.Borings". The boring logs depict the observed soils in; graphic detail. The Standard Penetration
Test borings indicate the penetration resistance, or, N=values logged during the drilling 'and.
sampling activities. The classifications and descriptions shown on the logs are generally based
upon visual characterizations of the recovered soil: samples. All soil samples reviewed have
been depicted 'and classified,'in general accordance with the, Unified. Soil Classification System,
modified as necessary to describe typical Florida conditions. See Appendix E: "Discussion of
Soil Groups"., for a detailed description of various soil groups. .
The subsurface soil conditions encountered at this ,site ;generally consist of very loose to
medium dense sand to. silty/clayey sand (SP,SP-SM,SM,SC) to 15 feet, medium dense sand
With some shell (SP) from 1:5 to 28% feet, and then dense to -verydense sand with some shell
(SP) to the boring termination depths. Please refer to Appendix D -:Record of Test Borings for a
detailed account of each boring and sounding.
2.5 Hydrogeological Conditions.
On the dates of our field exploration, the groundwater/.table was encountered at depths ranging
from approximately 2% to 4 feet below the existing .ground surface. The groundwater table will,
fluctuate seasonally depending upon local rainfall and other site specific and/or local influences
including. the water level in the -nearby Atlantic Ocean'l,with tidal influences. .Brief ponding, of
stormwater may occur across'the site after heavy rains.
No additional investigation was included in our scope of work in relation to the wet seasonal
high groundwater table or any existing well fields, in the vicinity. Well fields may influence water
table levels and cause significant fluctuations. If a moron comprehensive water table analysis is
necessary, please contact our office for additional guidance,
3.0 ENGINEERING EVALUATION .AND RECOMMENDATIONS
3.1 Foundation Recommendations - General
The residential structure will be. located east of the Coastal Construction Control Line (CCCL)
and therefore a pile supported foundation is required. Frangible ground floor slabs and ground
level walls may be pile supported or supported. on footings in accordance with rules and
regulations (to be determined by others).
3.2 Pile Foundation
The following is design parameters GFA used for pile recommendations:
For CCCL construction, the FDEP has established a 100-year storm elevation (bottom of
lowest structural member) of +17.0 .to +17.9 feet NGVD (depends on location) for
structures within St. Lucie: County.
➢ For CCCL construction, the FDEP 'has established a 100-year storm erosion elevation
(design scour elevation) of +2.7 feet NGVD for all of St, Lucie County.
➢ A loss of soil support between the bottom of lowest structural member and design scour
GFi�
Proposed S-Level Residence
Sea Oats Lot 7, Anacostia Place, St. Lucie County, FL
GFA Project No. 16-0074.00
Geotechnical Report
January 21, 2016
Page 8 of 13
elevation (+2.7 feet NGVD) was included in compressive, tensile, and lateral pile
capacity analyses.
We assume the residence will have typical construction, and be supported on columns
terminating, on pile caps slightly below the ground floor elevation. We assume that pile
caps slightly below the ground level elevation and top of piles (bottom of pile caps).
would be at about existing grade.
At this time, GFA recommends the deep foundation to, consist of !ugered cast -in -place piles
(ACIP). Additional lateral capacity may be attained by,utilizing inclined piles. We assumed that
the piles will have a minimum of 1% steel reinforcement for the analyses. ACID pile installation
procedures should be performed in accordance witH the guidelines presented in the latest
edition of the Deep Foundations Institute's Augered Cast -In -Place Pile Manual. The lateral
capacity and pile top deflection were calculated using the commercially available L-pile 4.0
software. A summary of pile capacities.ACIP piles is presented in the following table.
Pile Recommendations For All Pile Supported Structures
Maximum.
Nominal
Pile Top
Recommended
Pile
Pile
Pile
Pile Lateral
Pile
Elevation
Pile Tip
Lengths
Compression
Tension
Capacity
Recommended.
Diameter
NGVD *
Elevation
ft **
Capacity
Ca aci
(Tons)***
Grout Stren th
0.5 Tons
14" or
(Free Head)
16"
1 Unknown I
Unknown
32
40 Tons
7 Tons
1.25 Tons
Fixed Head
5000 psi
� V wN gIGVQUVI1 assumed cLL, ur rnvre than, *4 Teel NUVU Tor analyses.
**From ground -surface existing at time of drilling.
***For calculated pile top deflection of % inches at top of pile elevation.
The pile installation length is based on installing the piles at site grade (grade about 1
foot above the adjacent roadway) existing at time of drilling. If additional fill will be
required to raise the site to achieve final grade, the piles will be longer according to the
depth of fill added.
Very dense/hard soils may be encountered. The piles; may be installed prior to achieving
the required depth if there is auger refusal. Refusal .is ;defined as a minimum of 3 minutes
drilling for 3 inches or less auger penetration into rock.
GFA assumed that the piles will have a minimum of 1 % steel reinforcement for the analyses: .
Augercast piles should be reinforced over. their entire length for tension capacity. The
reinforcement shall be as designed by the Structural Engineer:
If piles of lesser or greater ,capacities than those mentioned in the table above -are required,
GFA would be pleased to provide further recommendations. upon request.
Gf�
Proposed 3-Level Residence Geotechnical Report
Sea Oats -Lot 7, Anacostia Place, .St. Lucie County, FL January 21,, 2016
GFA Project No. 16-0074.00 Page 9 of 13
The following additional notes are' applicable to the pile design:
• Structural stresses 'in the piles may impose a more severe limitation on the
design capacity; therefore., we recommend the allowable stresses be verified for
the selected pile section.
The pile reinforcement is sufficiently embedded in the pile cap so as to afford a
fixed end connection if required.
3.3 Pile Installation
Pile design and installation shall be in accordance with the applicable sections of the Florida
Building Code and other applicable federal, state and local requirements. In addition, ,piles
should be. installed in accordance with the following:
1. Pile Length: The proposed 14-inch-diameter piles should, be installed as determined by
the inspecting Geotechnical Engineer.
2. S acin - Piles installed in groups should be spaced at a center -to -center distance of not
less than 3 pile diameters.
3. Plan Location - The center of the top of any pile[at cut-off should be displaced laterally
no more than 3 'inches from the position shown on the plans. This applies to both single
piles and piles installed in groups.
4. Vertical Alignment - The vertical alignment of the piling should not deviate from the
plumb by more than 1/4 inch per foot of, length.
5. Reinforcing Cage Positioning - The top of the reinforcing cages installed in the piling
should not be .more than 6 inches, above and no more than 3 inches below the positions
shown in the plans. The reinforcing cages should be positioned concentrically within the
grouted pile shaft. The grout cover over longitudinal reinforcing bars should not be less
than 3 inches. 'Reinforcing centralizers shall be placed at maximum spacing of 15 feet at
the lower portion of the. pile and at 5 feet from 'the Gage's top. - -
6. Adiacent Piles - A minimum time period of 12' hours should be specified for the
installation of piles located within 5 feet, center -to -center, -.of each other.
7. Grout Factor - The minimum acceptable grout factor (i.e. actual grout volume divided by
Theoretical grout volume) should be 1.1.
3.4 Vibration Monitoring
The proposed construction will be within close proximity to residential structures and roadways
that maybe susceptible to damage from vibration generated at the site. We recommend that
during all aspects of construction, the bordering landmarks be monitored using a seismograph
to determine the extent of vibration absorption that these features will be subject to. The
seismograph used to monitor at this site should have the capability to measure ground velocities
Gf�
Proposed 3-Level Residence
Sea Oats Lot 7, Anacostie Place, St. Lucie County, FL
,GFA Project No. 16-0074.00
Geotechnical Report
January 21, 2016
Page 10 of 13
along vertical, transverse, and 'longitudinal axes. The project structural engineer should
establish allowable ground velocities that the bordering facilities can safely withstand without
any`damage.
&5 Design of Footings (Ground Level Frangible Walls)
Footings may be designed using an allowable soil bearing pressure. of 2,500 psf. Shallow
foundations should be embedded a minimum of 12 inches below final grade. This embedment
shall be measured from the lowest adjacent grade. Isolated column footings should beat least
'24 inches in width and continuous strip footings should have a width of at least 16 inches
regardless of contact pressure.
.Once site preparation has been performed in accordance with the recommendations described
in this report, the soil should readily support the proposed structure resting on a shallow
foundation system. Settlements have been projected to be less than -1-inch total and %-inch
differential. All footings and columns should be structurally separated from the floor slab, as
they will be.. loaded differently and at different times, unless a monolithic mat foundation is
designed..
3.6 Ground Floor Slab -(Frangible)
The ground floor slabs may be supported directly on the existing grade or on granular fill
following the foundation site preparation and fill placement procedures outlined in this report.
For purposes of design, a coefficient of subgrade modulus 150 pounds per cubic inch may be
used. The ground floor slab should be structurally separated from all walls and columns to
allow for differential vertical movement.
Water vapor is likely to rise through the granular fill and condense beneath the base of the floor
slab. If moisture entry into the .floor slab is not desirable, � an, impermeable membrane should be
installed at the slab bottom - subgrade interface.
3.7 Site Preparation
GFA recommends the following compaction requirements,for this project:
➢ Proof Roll............................................................ ............ 95%- of a Modified Proctor
➢ Building Pad Fill............................................................95% of a Modified Proctor
➢ Footings ........................................... ............................95% of a Modified Proctor
The compaction percentages presented above are based upon the maximum dry density as
determined by a "modified proctor" test (ASTM. D-1557). All density tests should be
performed to a depth of 2 feet below stripped surface and 2 feet, below bottom of
footings. All density tests should be performed using the nuclear method (ASTM D 2922), the
sand cone method (ASTM D-1556), or Hand Cone Penetrometer (HCP) tests.
Our recommendations for preparation of the site are presented below. This approach to
improving and maintaining the site soils has been found to be successful on projects with similar
soil conditions.
Gfi�
Proposed 3-Level Residence Geotechnical Report
Sea Oats Lot 7, Anacostia Place, St. Lucie. County, FL January 21, 2016
GFA Project No. 16-0074.00 Page 11 of 13
1. Initial site preparation should consist of performing stripping (removing surface vegetation,
near surface roots, and other deleterious matter) -and clearing operations. This should be
done within, and to a distance of five (5) feet beyond, the perimeter of the proposed building
footprint (including exterior isolated columns): Foundations and any below grade remains of
any structures that' are within the footprint of the new construction should be removed., and
utility lines should be removed or properly abandoned so as to. not affect structures. If the
demolished residence had a pile foundation, GFA must be notified. as the recommendations
may change..
2. Following site stripping and prior the placement of any fill,. areas of surficial sand (not
exposed limestone) should be compacted ("proof rolled") and tested. We recommend using
a steel drum vibratory roller with sufficient static weight and vibratory 'impact energy to
achieve the required compaction.-' Density tests should be performed on 'the proof rolled
surface at a frequency of not less than one test per 2,50D square feet, or a minimum of three
(3) tests, whichever is greater. Areas of exposed intact limestone shall be visually confirmed
by the project geotechn. ical engineer prior to fill placement,.in lieu of proof rolling.
3. Fill material may then. be placed in the building pad as required'. The fill material should be
inorganic (classified as SP, SW, GP, G1N, SP-SM, SW-SM, GW-GP, GP -GM) containing not
more than 5 percent (by weight) organic materials.' Fill .materials with silt/clay-size soil
fines in excess of 12% should not be used. Fill should be placed in lifts with a maximum
lift thickness not exceeding 12-inches. Each lift should be compacted and tested prior to the
placement of the next lift. Density tests should be performed within the fill at a frequency of
not less than one test per 2,500.square feet per lift in the building areas, or a minimum of
three (3) tests per lift, whichever is greater.
4. For any footings bearing on a limestone formation, the bottom of all footing excavation shall
be examined by the engineer / geologist or his representative to determine the condition of
the limestone. The limestone shall be probed for voids and loose pockets of sand. Such
areas shall be cleaned to depth of 3 times the greatest horizontal dimension and backfilled
with lean concrete.
5. For footings placed on structural fill or compacted native granular soils, the bottom of all
footings shall be tested for compaction and examined by the engineer / geologist or his
representative to determine if the soil 'is free of organic and/or deleterious material. Density
tests should be performed at a frequency of not less than one (1) density test per each
isolated column footing and one (1) test per each seventy five (75) lineal feet of wall
footings.
6. Upon completion of production pile installation and pile cap construction, the pile 'caps
should be backfilled in 6 to 8 inch thick lifts and compacted to at least 95% of the modified
Proctor maximum dry density:(ASTM D 1557).
7. 'The contractor should take into account the final contours and grades as established by the
plan when executing his backfilling and compaction operations.
Using vibratory compaction equipment at this site may disturb adjacent structures. We
recommend that you monitor nearby structures before and during proof -compaction operations.
Gf�
Proposed 3-Level Residence Geotechnical Report
.Sea Oats Lot 7, Anacostia Place, St. Lucie County, FL January 21, 2016
GFA Project No. 1670074.00 Page 12 of 13
A representative of GFA International can monitor the vibration disturbance of adjacent
structures. A proposal for vibration monitoring during compaction operations can be supplied
upon request.
3.8 Excavation Conditions
In Federal Register, Volume 54, No. 209 (October -1989), the United States Department of
Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction
Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better
insure the safety of workmen entering trenches or excavations. It is mandated by this federal
regulation that all excavations, whether they be utility trenches, basement excavations or footing
excavations, be installed in accordance with the OSHA guidelines. It is our understanding that
these regulations are being strictly enforced and if they are not closely_ followed, the owner and
the contractor could be liable for substantial penalties.
The contractor is solely responsible for designing and constructing stable, temporary
excavations and should shore, slope, or bench the sides of the excavations as required to
maintain stability of both the excavation sides and bottom. The contractor's responsible person,
as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of
the contractor's safety procedures. In no case should slope height, slope inclination, or
excavation depth, including utility trench excavation depth, exceed those specified in local,
state, and federal safety regulations.
4.0 REPORT LIMITATIONS
This consulting report has been prepared for the exclusive use of the current project owners and
other members of the design team for the Proposed 3-Level Residence located at 4Sea Oats
Lot 7, Anacostia Place, St. Lucie County, Florida. This report has been prepared in accordance
with generally accepted local geotechnical engineering practices; no other warranty is
expressed or implied. The evaluation submitted in this report, is based 'in part upon the data
collected during a field exploration, however, the nature and extent of variations throughout the
subsurface profile may not become evident until the time of construction. If variations then
appear evident, it may be. necessary to reevaluate information and professional opinions as
provided in this report. In the event changes are made in'the nature, design, or locations of the
proposed structure, the evaluation and opinions contained in this report shall not be considered
valid, unless the changes are reviewed and conclusions modified or verified in writing by GFA
International.
Scour elevations used in pile calculations are those provided by the Florida DEP for coastal
construction, but may not be adequate for actual scour elevations in hurricane(s) event(s) that
exceed the DEP assumptions and cause lower scour elevations. Therefore, GFA analysis is
limited to that provided by the DEP scour elevation, and scour analysis is not included in our
scope of work.
GF�
Proposed 3-Level Residence Geotechnical Report .
Sea. Oats Lot 7, Anacostia Place, St Lucie County, FL January 21, 2016
GFA Project No. 16-0074.00 Page 13 of 13
5.0 'BASIS FOR RECOMMENDATIONS
The analysis and recommendations submitted in this report are based on the data obtained
from the tests performed at the locations indicated on the attached figure in Appendix B. This
report does not reflect any variations, which may occur between borings. While the borings are
representative of the subsurface conditions at their respective locations and for their vertical
reaches, local variations characteristic of the subsurface soils of the region .are anticipated and
May be encountered. The delineation between soil'types shown on the soil logs is approximate
and the description represents, our interpretation of the, subsurface conditions at the designated
boring locations on the particular date drilled.
Any third party reliance of our geotechnical report or parts thereof is strictly prohibited without.
the expressed written consent of GFA International. The applicable SPT methodology (ASTM
D-1.586), CPT- methodology (ASTM D-3441), and Auger Boring methodology (ASTM D-1452)
used in performing our borings and sounding, and for determining penetration and cone
resistance is specific to the sampling tools utilized and does not reflect the ease or difficulty to
advance other tools or materials.
Gf�
Appendix.A - Vicinity Map.
60
i
ii
/�TFRNATIO�P�
Vicinity Map
Sea Oats Lot 7, Anacostia Place
St. Lucie County, Florida
GFA Project No. 16-0074.00
Appendix B - Test Location Plan
GF�
G" >.- Test Loc
ation cation Plan: Sea Oats Lot 7, Anacostia Place, St. Lucie County, Florida
-Approximate Standard Penetration Test (SPT) Locations
Appendix C - Notes Related to Borings
GF�
NOTES RELATED TO
RECORDS OF TEST BORING AND
GENERALIZED SUBSURFACE PROFILE
1. Groundwater level was encountered and recorded (if shown) following the completion of the soil test boring on
the date indicated. Fluctuations in groundwater levels. are common; consult report text for a discussion.
2. The boring location was identified in the field by offsetting from existing reference marks and using a cloth tape
and survey wheel.
3. The borehole was backfilled to site .grade following boring completion, and patched with asphalt cold patch mix
when pavement was encountered.
4. The Record of Test Boring represents our interpretation of field conditions based on engineering examination of
the soil samples.
S. The Record of Test Boring is subject to the limitations, conclusions and recommendations presented in the Report
text.
6. "Field Test Data,, shown on the Record of Test Boring indicated ,as H/6 refers to the Standard Penetration Test
(SPT) and means 11 hammer blows drove the sampler 6 inches. SPT uses'a 140-pound hammer falling 30 inches.
7. The N-value from the SPT is the sum of the hammer blows required to drive the sampler the second and third 6-
inch increments.
8. The soil/rock strata interfaces shown on the Records of Test Boring are approximate and may vary from those
.shown. The soil/rock conditions shown on the Records of Test Boring refer to conditions at the specific location
tested; soil/rock conditions may vary between test locations.
9. Relative density for sands/gravels and consistency for silts/clays are described as follows-
SPT
BLOWS/FOOT
CPT
KG/CM
0-16
SANDS/GRAVELS
RELATIVE DENSITY
SPT
BLOWS/FOOT
0-1
CPT
KG/CM
SILTS/CLAYS
CONSISTENCY
0-4
Veryloose
0-3
soft
5-10
17-40
Loose
2-4
4-6
—Very
Soft
11-30
41-120
Medium Dense
5-8
7-12
Firm
31-50
121-200
Dense
1 9-15 1
J3-25
Stiff
50i
1 16-30 1
25-50
Very stiff
>30 1
>50
Hard
1 u. dram size descriptions areas follows:
NAME
SIZE LIMITS
Boulder
12 Inches or more
Cobbles
3 to 12Inches
Coarse Gravel
N to 3 Inches
Fine Gravel
No. 4 sieve to % inch
Coarse Sand
No. 10 to No. 4 sieve
Medium Sand
No. 40 to No. 10 sieve
Fine Sand
No. 200 to No. 40 sieve
Fines
Smaller than No. 200 sieve
11. Vetmitions related to adjectives used in soil/rock descriptions:
PROPORTION
ADJECTIVE
APPROXIMATE ROOT DIAMETER
ADJECTIVE
<5%
Trace
Less than 1/32"
Fine roots
5%to 12%
Little
1/32" to 'A"
Small roots
12% to 30%
Some
'''A" to 1"
Medium roots
30% to 50%
And
Greater than I"
Large roots
Organic Soils: Soils containing vegetable tissue in various stages of decomposition that has a fibrous to amorphous texture,
usually a dark brown to black color, and an organic odor.
Organic Content <25%: Slightly to Highly Organic; 25% to 75%: Muck; >75%: Peat
Gf�
Appendix. D - Record of Test Borings
GF�
i
r
GFA INTERNATIONAL
521 N.W. ENTERPRISE DRIVE, PORT1,ST. LuciE, FLORIDA 34986
PHONE: (772) 924-3575 - FAX: (772) 924-3580
V STANDARD. PENETRATION TEST�BORING (ASTM'D-1586)
Client: Masterpiece Builders
Project No.:16-0074.00
Lab No.:
Project:. Sea. Oats Lot 7,AAnacostia Place
Page: 1 of 2.
St. Lucie: County, Florida
Date: 1/18/2016
Elevation: Existing Grade
Drill Rig: Simco-24
Water Level: 29 feet -after 0 hours Drilling Fluid commenced:at depth of 10 feet
Field. Party: PM/CM/WG
TEST LOCATION: SPT- 1 N27.40958° W80.26899° !
Laboratory Tests
Depth
(feet)
'Blows/
Cin.
N
Value
Sample
No.
Layer:
From/to
U.SCS
Description
Passing
Moisture
Organic
No.200
Content
Content
1
0-3
SP
Brown fine sand, trace shell fragments
1
2
--
1
3
1
-
Z;
5
-11-
...
_
-
__-
5
10
2
3-4
SM
Dark brown organic stained fine sand,
4
8
__ __
.......
some silt, trace organics
8.
4 - 5%
SM,SC
Brown fine sand, little silt, some clay
5
7
-
13
20
3
6
-10
_..
5% - 8
SC
Brown fine sand, some clay
y
_ -
9
7.10
-.7-
_
---
.17•
4
8
..-5 •---
•-•---
_-
-2
8-10
SP
Gray,fine sand, trace shells fragments
1
9
i-
2-
5
11
12
--•-
..............
---
J
13
-•--
---
14
-, 1
---- •
13% - 11-5SP-SM
Gray fine sand, little silt, some shell fragments
- --
2
15
-2.
6
16
--•-
17
..............
lg..............
19
..1 ...
_.....
18'/z - 20
SP
Gray fine -sand, some shell fragments
--
6
7
1'3
7
i
GFA INTERNATIONAL
521 N.W.`ENTERPRISE DRIVE, PORT'ST. LUCiE,FLORiDA 34986
PHONE: (772).924-3575 FAX: (772) 924-3580.
STANDARD PENETRATION TEST -BORING (ASTM D-1586)
Client: Masterpiece Builders Project No.:16-0074.00
Lab No.:
Project: Sea Oats Lot 7, Anacostia Place Page: 2 of 2
St. Lucie County, Florida Date: 1/18/20.16
Elevation: Existing Grade Drill Rig: Simco-24
Water Level: 2'/a feet after 0 bours Drilling Fluid commenced at depth of 10 feet Field Party- PM/rMfwr
TEST LOCATION: SPT -1 N27.409580 W80.268990
Laboratory Tests
Depth
(feet)
Blows/
6 in.
N
Value
Sample
No.
Layer:
Frotn/to
USCS
Description
P
Passing
Moisture
Organic
No.200
Content
Content
20
- -
21
•--.
...
22
----
---
23
-
24
--12 __
------
D:Y2 -25
SP
Gray fine sand and shell fragments,.
- --
14
25
. 12
26
8
26
..............
27
----
--
28
..............
29
•.14
•,-�
281/2 - 30
SP
Gray fine sand, some shell.fragments
----
22
49-
9.
30
-27
31
...
•--
32
-
33
..............
3a
17
...
33% -.35
SP
Gray fine -sand and shell fragments
24'
35
.... 30
•54
10
Boring terminated at 35 feet
36
....
..
37
----
---
38
...............
39
....
...
GFA INTERNATIONAL
521 N.W. ENTERPRISE DRIVE, PORT IST. LUCIE, FLORID 34986
PHONE: (772)924-3575 -.FAX: (772) '924-3580
I STANDARD PENETRATION TEST BORING (ASTM D-1586)
Client: Masterpiece Builders
Project: Sea Oats Lot 7, Anacostia Place
St, Lucie .County, Florida
Elevation: Existing Grade
Water Level: 4 feet after 0 hours
Drilling Fluid commenced at depth of 10 feet
Project No.:16-0074.00
Lab No.:
'
_Page:
1 of 2
Date:
1/18/2016
Drill Rig:
Simco-24
Field Party:
PM/CMIWG
TEST LOCATION: SPT -2. N27.40961 ° W80.268640
Laboratory Tests
Depth
(feet)
Blows)
6 in.
N
Value
Sample
No.
Layer:
From/to
USCS
Description
Passing
Moisture
Organic
No. 200
Content
content
0 - 7%
SP
Brown fine sand, trace shell fragments
1
?
---
2
.2
...
7�
3
8
.9..
.17
2
_.
a
.10
10
_
8
20
3
6
- 4
--
---
4�
I
7
. 3
..fi .
---
3,
4
8
- _4
7% - 10
SM
Dark brown organic stained fine sand.
_.
2
some silt, trace organics
9
- -.
2_
6.
5
10....
.
...
i
12
..
13
- - -
---
_
1'4
_ 4 _
--1--
____..
13'/ - 15
SP-SM
Gray fine sand, little silt, little shell fragments
--
I5
- 1-
-2
6
16
..............
17
-
18
....
18'/i, - 20
SP
Gray fine sand and shell -fragments
----
12 1
13
7
GFA INTERNATIONAL
521 N.W..ENTERPRISE DRIVE, PORT ST. LUCIE; FLORIDA 34986
PHONE: (772) 924-3575 FAX: (772),924-3580
STANDARD PENETRATION TEST BORING (ASTM D-1586)
Client: Masterpiece Builders Project No.:16-0074.00
Lab No.:
Project: Sea .Oats Lot 7, Anacostia'Plac.e Page: 2 of 2
St. Lucie Coti:nty,.Florida Date: 1/18/2016,
Elevation: Existing Grade Drill Rig: Simco-24
Water Level: 4 feet after 0 hours Drilling'Fluid,commenced at depth of 10 feet Field Partv: PM/CM/WG
TEST LOCATION: SPT - 2 N2.7.40961 ° W80.268640
Laboratory Tests
Depth
.Blows/
N
Sample
Layer:
USCS.
I
D,eSCtlptlOn
Passing
Moisture
Organic
(feet).
6 in.
I value
No.
From/to'
No..200
Content
Content
20
----
----
21
..............
22
- -
23
................
24
14
-14
-----
23%z - 25
SP i
Gray fine sand and shell fragments
25
.20
34
8
26
--
27
..
28
-
---
8
28%2 - 30
SP
Gray fine sand, some shellftagments
29...18-
- --.-30
---,•
41
9
:23
31
..............
- 32
..............
33
- -.
34
--18-•
---:--
33%2 - 35
SP
Gray fine sand; some shell fragments
42
35
32
74
10
Boring terminated at 35 feet
36
..............
38:
---
39
..............
Appendix E Discussion of Soil Groups
Gf�
DISCUSSION OPSOIL GROUPS
COARSE GRAINED, SOILS
'GW and SW GROUPS. These groups comprise well -graded gravelly and sandy
soils having little or no plastic fines (less than percent passing the No. 200 sieve).
The presence of the fines. must not noticeably change the.'strength characteristics
of the coarse -grained friction and must not' interface with it's free -:draining
characteristics.
GP and SP GROUPS. Poorly graded gravels and :sands containing little of no
plastic fines (less than 5 percentpassing the -No. 200 sieve) are classed in GP
and SP groups. The materials may be called uniform gravels, uniform sands or
non -uniform mixtures of very coarse' materials and very. .fine sand, with
intermediate sizes lacking (sometimes, called. skip -graded, gap. graded or step -
graded). This last.group often results from 'borrow pit excavation in which gravel
and :sand layers are mixed.
GM and SM GROUPS. In general, the GM and ;SM groups comprise gravels or
sands with fines (more than 12 percent the No. 200 sieve) having low or no
plasticity. The plasticity index and. liquid limit of soils in the group should plot
below' the "A" line on .the plasticity chart. The gradation of the material is not
considered significant and both well and poorly graded materials are included.
GC and SC GROUPS. In general, the GC and SC groups comprise gravelly or
sandy soils with fines (more than 12 percent passing the No, 200 sieve) which
have a fairly high plasticity. The liquid limit and plasticity index should plat above
the "A" line on the plasticity chart. �
'FINE GRAINED SOILS
ML, and MH, GROUPS. In these groups, the symbol M has been used to
designate predominantly silty material. The symbols L and H represent low and
high liquid limits, respectively, and 'an arbitrary dividing line between the two set
at a liquid limit of 50.. The soils in the ML and MH 'groups are sandy silts, clayey
silts or inorganic silts with relatively low plasticity. Also included are loose type
soils and rock flours.
CL and CH GROUPS. In these groups the symbol,C stands for clay, with L and`
H denoting low or high liquid limits, with the dividing line again set at a liquid of
50. The soils are primarily organic clays. Low plasticity clays are classified as
CL and are usually lean clays, sandy clays or silty clays. The medium and high
plasticity clays are classified as CH. These include: the fat clays, gumbo clays
and some volcanic clays.
Gf�
OL and OH GROUPS. The soil in the OL and OH groups are characterized by
the presence of .organic odor or color, hence the symbol O. Organic silts and
clays are classified in these groups. The materials have a plasticity range that
corresponds with the ML and MH groups.
HIGHLY ORGANIC SOILS
The highly organic soils are .usually very soft .and compressible and have
undesirable construction characteristics. Particles of leaves, grasses, branches,
or other fibrous vegetable matter are common components of these soils. They
are not subdivided and are classified into one group. with the symbol PT. Peat
humus and swamp soils with a highly .organic' texture are typical soils of the
group.