'c Subject: Report of Augercast Pile Installation Monitoring
LU
Proposed Residence
o Lot 7, 3800 Anacostia Place
Fort Pierce, Florida
V
Ql
Q.
2 Dear Mr. Barnes:
13 ry weptune vrrve
Boynton Beach, Florida 33426
561-736-4900
Toll Free: 877-NUTTING (688-8464)
Fax:561-737-9975
Broward 954-941-8700
St. Lucie 772-408-1050
Miami -Dade 305-557-3083
www.nuttingei)gineers.com
Nutting Engineers of Florida, Inc. (NE) has completed observation of augercast piling operations
for the proposed residence at the subject site. Bodax Foundations, Inc. installed cast -in -place
augured piles for support of the proposed construction.
v
6 Bodax Foundations, Inc. installed a total of 63, 14-inch diameter augercast piles for the project.
•c The piles were installed from November 9, 2017 to;November 10, 2017. Please refer to the pile
ai plan for the numbering provided to our office. The pile size and depth recommendations were
'a, based upon our review of the Report of Geotechnical Exploration prepared by GFA International
rL dated January 22.2016.
The pile installation characteristics of each pile are presented in the attached Pile Installation
Data. Identification of each pile location followed by the pile number is shown on the Pile
Location Plans attached. Each pile record in the attached summary tables shows the following
c information:
0
u
■ RECORD NUMBER IN CHRONOLOGICAL ORDER
■ THE PILE NUMBER '(AS FOUND ON ATTACHED PLANS)
0 ■ THE DIAMETER OF THE PILE
-0 ■ THE LENGTH OF PILE FROM GROUND SURFACE TO TIP
■ THE THEORETICAL VOLUME OF GROUT FOR THE PILE
■ THE NUMBER OF PUMP STROKES FOR THE PILE
c ■ THE ACTUAL VOLUME OF GROUT FOR THE PILE
v ■ THE GROUT FACTOR
o ■ THE DATE OF INSTALLATION
0 THE REINFORCEMENT TYPES
OFFICES
Palm Beath
Miami -Dade `
lAId1�1VERSARY•TT
1.964
S t . Lucie
■ AND GENERAL COMMENTS AS NEEDED
The drilling. operations were monitored in :the field by our field engineer and inspector in order to
approximately determine the type of material being penetrated. This identification was done
based on the angering time, the materials received during the drilling operations and the, relative
hardness of the soils/rocks as indicated by the vibration or "chattering" .of the hydraulic lines.
The augercast piles were installed to depths of thirty'to thirty-two feet below the existing ground
surface of approximately. The piles were designed for an allowable compressive capacity of 40
tons as required by the structural specifications and the recommendations made by our office.
Generally,. during the installation of the piles, easy drilling was observed from the ground level to
approximately twenty-four feet. Below this depth range hard drilling was encountered to the final
tip depth.
All piles received steel reinforcement consisting of full length cage with 6, #6 reinforcing bars
with 43 ties spaced 6-inch on center in the top twenty-five feet of the cage and 12-inches on
center the remaining length of the pile as stated in the structural documents.
Upon completion of this inspection process,, and review of the recorded data, it is our opinion
that the. augercast piles installed for the residence attained the required design compressive
capacity of 40 tons. The pilesthat were presently installed were constructed in substantial
compliance with the plans and specifications.
We note that it was monitored and ensured that the piles began installation at the survey locations
provided in the field. If during drilling operations it was discovered that gross deviations from
.original locations have occurred', the deviation was attempted to be rectified. Nutting Engineers
is not responsible for minor deviations which have occurred during drilling operations, along
with incorrect surveyed pile locations during piling installation. We also note that some
deviations may be due to the augerdrill shifting when attempting to drill through. the hard rock or
other encountered debris conditions. This condition is beyond the control of the site inspector
and undersigned engineer.
Our client for this project was:
Mr. Rich Barnes
Bodax Foundations, Inc.
1101 NW 551h Street
Ft. Lauderdale, Florida 33309
Hutting
a Engineers
of Florida Inc. I Established 1967
2
.1, F
ONIVERSARp %
19$7 2017,' `k
The contents of this report are for the exclusive use of the client, the client's design &
construction team and governmental authorities for this specific project exclusively. Information
conveyed in this report shall not be used or relied upon by other parties or for other projects
without the expressed written consent of NE.
We appreciate. this opportunity to work with you on this project and look forward to completing
this and future projects with you. Should you have any questions or if we can be of any further
assistance, please contact us'at your convenience. �
Respectfully Submitted;,
NUTTING ENGINEERS OF FLORIDA, INC.
Richard C. Wohlfarth, P.E.
Director of Engineering
Attachments: Pile Location Plans
Pile Installation Data
LTRBODAXLOT 7-3806 ANACOSTIA PL FT -PIERCE ACP CEG
Nutting
a Engineers
of Florida Inc. 1 Established 1967
9
h ^t3J
AtJNIMSARy r
i007 2017,
��•tet4J1'a ti,�