Loading...
HomeMy WebLinkAboutPILE LOG DATABODAX FOUNDATION PROPOSED RESIDENCE LOT 7, 3800 ANACOSTIA PLACE FORT PIERCE, FLORIDA PILE LOG DATA OF AUGERCAST PILE INSTALLATION NUTTING ENGINEERS OF FLORIDA, INC. Record No. Pile No. Pile Dia. (in) Pile Length (ft) Theoretic. Pile Volume (ft') Pump Strokes Total Volume of Grout Pumped ft Grout Factor Date Installed Remarks 1 57 14.0 32 34.2 69 40.7 1.19 1 11/09/17 2 58 14.0 30 32.1 63 38.4 1.20 11/09/17 3 46 14.0 32 34.2 67 40.9 1.19 11/09/17 4 47 14:0 32 34.2 68 41.5 1.21 11/09/17 5 53 14.0 32 34.2 74 45.1 1.32 11/09/17 6 60 14.0 32 34.2 68 41.5 1.21 11/09/17 7 61 14.0 32 34.2 73 44.5 1.30 11/09/17 8 43 14.0 32 34.2 75 45.8 1.34 11/09/17 9 37 14.0 32 342 70 42.7 1.25 11/09/17 10 32 14.0 32 34.2 68 41.5 1.21 11/09/17 11 28 14.0 32 34.2 83 50.6 1.48 11/09/17 12 23 14.0 32 34.2 67 40.9 1.19 11/09/17 13 62 14.0 32 34.2 71 43.3 1.27 11/09/17 14 54 14.0 .32 34.2 70 42.7 1.25 11/09/17 15 63 14.0 32 34.2 79 48.2 1.41 11/09/17 16 56 14.0 32 34.2 74 45.1 1.32 11/09/17 17 52 14.0 32 34.2 75, 45.8 1.34 11/09/17 18 51 14.0 32 34.2 125 76.3 2.23 11/09/17 Redrill 19 55 14.0 32 34.2 76 46.4 1.36 11/09/17 20 29 14.0 32 34.2 80 48.8 1.43 11/09/17 21 33 14.0 32 34.2 74 45.1 1.32 1 11/09/17 22 34 14.0 32 34.2 85 51.9 1.52 11/09/17 23 30 14.0 32 34.2 71 43.3 1.27 11/09/17 24 35 14.0 32 34.2 85 51.9 1.52 11/09/17 25 31 14.0 1 32 34.2 70 42.7 1.25 11/09/17 26 44 1 14.0 1 32 34.2 85 51.9 1.52 11/09/17 27 59 14.0 32 34.2 80 48.8 1.43 11/10/17 28 48 14.0 32 34.2 90 54.9 1.60 11/10/17 29 49 14.0 32 34.2 71 43.3 1.27 11/10/17 30 50 14.0 32 34.2 76 46.4 1.36 11/10/17 31 41 14.0 32 34.2 79 48.2 1.41 11/10/17 32 1 24 14.0 32 34.2 85 51.9 1.52 11/10/17 33 25 14.0 32 34.2 69 42.1 1.23 11/10/17 34 26 14.0 32 34.2 71 43.3 1.27 11/10/17 35 45 14.0 32 34.2 69 42.1 1.23 11/10/17 36 42 14.0 32 34.2 71 43.3 1.27 11/10/17 37 36 14.0 32 34.2 68 41.5 1.21 11/10/17 38 27 14.0 32 1 34.2 90 54.9 1.60 11/10/17 Hutting E Engineers of Florida Inc.I Established 1967 BODAX FOUNDATION PROPOSED RESIDENCE LOT 7, 3800 ANACOSTIA PLACE FORT PIERCE, FLORIDA PILE LOG DATA OF AUGERCAST PILE INSTALLATION NUTTING ENGINEERS OF FLORIDA, INC. Record No. Pile No. Pile Dia. (in) Pile Length (ft) Theoretic. Pile Volume (fe) Pump Strokes Total Volume of Grout Pumped ft Grout Factor Date Installed Remarks 39 15 14.0 30 1 32.1 '67 40.9 1.27 11/10/17 40, 21 14.0 32 34.2 72 43.9 1.28 11/10/17 41 18 14.0 32 34.2 69 42.1 1.23 11/10/17 42 19 14.0 32 34.2 72 43.9 1.28 11/10117 43 14 14.0 32 34.2 73 44.5 1.30 11/10/17 44 11 14.0 .31 33.1 66 40.3 1.21 11/10/17 45 17 14.0 1 32 34.2 73 44.5 1.30 11/10/17 46 20 14.0 32 34.2 90 54.9 1.60 11/10/17 47 38 14.0 32 34.2 135 82.4 2.41 11/10/17 Redrill 48 39 14.0 32 34.2 125 76.3 2.23 11/10/17 Redrill 49 40 14.0 31 33.1 80 48.8 1.47 1.1/10/17 50 13 14.0 32 34.2 75 45.8 1.34 11/10/17 51 22 14.0 32 34.2 67 40.9 1.19 11/10/17 52 16 14:0 32 34.2 71 43.3 1.27 11/10/17 53 12 14.0 31 33.1 65 39.7 1.20 11/10/17 54 10 14.0 32 34.2 74 45.1 1.32 11/10/17 55 8 14.0 32 34.2 - 67 40.9 1.19 11/10/17 56 6 14.0 32 34.2 71 43.3 1.27 11/10/17 57 3 14.0 32 34.2 70 42.7 1.25 11/10/17 58 1 14.0 32 34.2 75 45.8 1.34 11/10/17 59 2 14.0 32 34.2 68 41.5 1..21 11/10/17 60 5 14.0 32 34.2 68 41.5 1.21 11/1.0/17 61 9 14.0 32 34.2 73 44.5 1.30 11/10/17 62 7 14.0 32 34.2 75 45.8 1.34 11/10/17' 63 4 14.0 32 34.2 75 45.8 1.34 11/10/17 Total linear feet drilled 2009 Total Grout (yd) 108 PILE LOG FL BODAX PROPOSED RES LOT 7 3800 ANACOSTIA FT -PIERCE ACP Minimum depth drilled 30 Maximum depth drilled 32 Hutting Engineers of Florida Inc.I Established'1967