Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 9-22-17Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Fierce, FL 34882 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION S02L TREATMENT PERMIT #: .�ri„ - JOB ADDRESS: %�29 :i1c-&-a _ �1�°t": �SL 2ellfJ,6 BUILDER ONTRACTOR: _/ L% c L I f� Ct�!1 f ur PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Percentage of solution: FC77% Date of Treatment: 9, Footing Ist Treatment Re -Treat Driveway Ist Treatment RpT eat Other �dt,LOA 1st Treatment Re -Treat Chemicals used: b d yyo idjQ a Total gallons used: Time of Treatment: 3 5— Slab �Ist Treatment Re -Treat Pools 11t Treatment Ret Perimeter nspection Ignature of Exterminator Date Note: There must be a completed firm for each required treatment orre-treatment and thls form must be on the job site to be picked up by the inspector at time of each Inspectlon or the scheduled Inspection will fall and a re-lnspectlon fee charged. F> C104.2.6 Certificate of Protective 7Yeatment for prevention of termites A weather resistant fobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit Is Issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site locatlon, area treated, chemical used, percent concentradon and number of gallons used, to establish a verltlable record of protective treatment if the soli chemical barrier method for term/te prevention Is used, final exterior treatment shall be completed prior to final building approval. St Lucia County requires for the final inspection for CO, a Permanent Sticker to be placed) on the electrical panel )box cover, listing all the treatments and dates of applications. Revised 7/24/2014