HomeMy WebLinkAboutPRODUCT APPROVAL ROOF UNDERLAYMENTV06QZUAX1 Wit:41i 4
https://www.floridabi!
zlg.org/pr/pr_app dtl.aspa?param=wGEVX...
r-orida building Code Online `
b
•+�{'ry; !,);�� ;tiy ";� {
SCIS Home tng in User Registration Not Topics
Business
,.!,
- PrafeSsiona
Product A
USER:Pubkc User
UU
h I
�
xx..i`a�.'.�c,'-`5�'�r�,..�::•x:?J k�...: ,-.�asr�.� eY:::.7-._.sa:�-�:s}
Submit Surcharge Stats & Facts Publications FBC Staff acts Site Map unks search
P,�riu �y}proyg;l.MPn4. P,.l�o4JKtQL.8P8$C?+ti4.?l� ?l tit APP.katiPj)-N > Appleation Detai
FL #
L16048-R3
Application Type
evision
Code Version
2014
Application Status
Approved
Comments
Archived
Product Manufacturer
Address/Phone/Email
Authorized Signature
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email'
Category
Subcategory
Compliance Method
Florida Engineer or Architect Name who developed
the Evaluation Report
Florida License
Quality Assurance Entity
Quality Assurance Contract Expiration Date
Validated By
Certificate of Independence
Referenced Standard and Year (of Standard)
TRI-BUILT Roofing Products
9050 Louisiana Street
Merrillville, IN 46410
(201) 842-2449
david. ruiz@tribuiltmaterialsgroup, cam
David Ruiz
david.ruiz@tribuiltmateriaisgroup.com
David Ruiz
250 Route 17 North
East Rutherford, NJ 07073
(201) 842-2449
david.ruiz@tribuiltmaterialsgroup.com
Roofing
Underlayment5
Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
Evaluation Report - Hardcopy Received
Robert Nieminen
PE-59166
UL LLC
10/16/2017
John W. Knezevich, PE
Validation Checklist - Hardcopy Received
FL1b048 R3 COi_2015 Ol COI IVieminen.pdf
Standard
ASTM D1970
ASTM G155
FRSA/TRI April 2012 (04-12)
TAS 103
Year
2009
2005
2012
1995
I of 2 5/24/2016 9:58 AM
orida�3uilding Code Online
https://www.florida, ing.orgtpr/pr app dtl.aspx?param=wGEVX...
Equivalence of Product Standards
Certified By
Sections from the Code
Product Approval Method
Date Submitted
Date Validated
Date Pending FBC Approval
Date Approved
Summary of Products
Method 1 Option D
10/08/2015
10/19/2015
10/21/2015
12/15/2015
Model, Number or Name Description
16048_1 ; TRI-BUILT Roof Underlayments ; Self -adhering, modified bitumen roof underiayments
Limits of Use s Installation Instructions
Approved for use in HVHZ: No Ft.16048 t23 II 016_�0 F�NAI�ER TP - i
Approved for use outside HVHZ: Yes � WUI T UNDERLAYMENTS FL16Q45-R3,.ps4f
Impact Resistant: N/A Verified By: Robert Nieminen PE-59166
Design Pressure: +N/A/-45 Created by Independent Third Party: Yes
Other: 1.) The design pressure noted herein pertains to use i Evaluation Reports
' of foam -on tile systems overtop the self -adhering FLILO 88 3 FEE 201.5 20F?NAL ER t R: _
underlayment for one particular application. See ER Section :QUILT UNpERtAYME�TS FL16Q48-R.'
5.6 for details. 2.) Refer to ER Section 5 for other Limits of i. Created by Independent Third Party: Yes
Use.
sack Wert¢
-CMtKLUS :: 1.99.Q.Nfltttl;t1011@CStree[. 77iiahacen�,�t 2q p ,m. 850-487-182�,
Tile State of Fbrlda fS on A4/EEO employer..CODyMhL. Q07_201,3.5ta_tt 41-f.14S11a., :: flkA Statement ;; L%r&U AU'jWW' pt ;; [te/unE State,tttclt[
Under Fbrlda law, email addresses are public records. If you do not want your a -mall address released Inresponse to a pudic -records request, do not send electronic
mail to this entity. Instead, contact the office by phone or by traditional mat. 11 you have any questions, please contact 850.487.1395. -Pursuant to section
455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must pmvfde the Department with an email address If they have
one. The emats provided may be used for official communication with the licensee. However emal addresses are public record. If you do not wish to supply a
personal address, please provide the Department with an email address which can be made avalabie to the pubic. To determine if you are a Icensee under Chapter
455, F.S., please click here .
Product Approval Accepts:
i3:
�rY'l/rill ., •. , Ve.
2 of 2 5/24/2016 9:58 AM
EXTERIOR RESEARCH &.DESIGN, LLC.
Certificate of Authorization N9503
353 CHRISTIAN STREET, UNIT ##13
OXFORD, CT 06478
PHONE: (203) 262-9245
EVALUATION REPORT FAX: (203) 262-9243
Allied Building Products Corp. Evaluation Report A42960.10.12-R3
dba TRI-BUILT Roofing Products FL16048-93
9050 Louisiana Street Date of Issuance:10/25/2012
Merrillville, IN 46410 Revision 3. 10/08/201S
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for Compliance with the 5`h .Edition (2014) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity) ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity IERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building official.
This Evaluation Report consists of pages 1 through S.
Prepared by:
Robert J.M. Nieminen, P.E.
Florida Registrotion No. 59166, Florida DCAANEI983
..a
Thefacsim['eseat appcarin was authorised Robert Neminen;
P.E.an]0/0g/201S. This does not serve os o0kctranicalf/si0nad
document. Signed, sealed hardeoples have been vansmined to the
CERTIFICATION OF INDEPENDENCE: aroduct approval Administrator and to the named diem
I. Trinity IERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinity I ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither TrinitylERD nor Robert Nieminen, P.E. are, -in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
r
ROOFING COMPONENT EVALUATION:
I. SCOPE:
Product Category: Roofing
Sub -Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI-BUILT, have demonstrated compliance
with the following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein.
2. STANDARDS:
Section
Property
Standard
Year
1507.2.4, 1507.2.8,1507.2.9.2,
Physical Properties
ASTM D1970
2009
1507.4.5.1, 1507.5.3, 1507.7.3
1504.6
Accelerated Weathering
ASTM G155
2005
1507.3.3
Installation Practice
FRSA/TRI April 2012 (04-12)
2012
1523.6.5.2.1
Physical Properties
TAS 103
1995
I REFERENCES:
iniftm
Examination
Reference
Date
ERD (TST6049)
Physical Properties
S40540.02.13-1
02/19/2013
ERD (TST6049)
Physical Properties
S40540.11.13
11/19/2013
ERD (TST6049)
Physical Properties
S40540.03.14
03/26/2014
ERD (TST6049)
Physical Properties
S44870.04.14-2
04/02/2014
ERD (TST6049)
Physical Properties
S44870.04.14-3
04/02/2014
ERD (TST6049)
Physical Properties
S44870.04.14-1
04/10/2014
ERD (TST6049)
Physical Properties
S44870.04.14-4
04/10/2014
ERD (TST6049)
Physical Properties
S43530.02.14-1-R1
05/14/2014
ERD (TST6049)
Physical Properties
S43530.05.14
OS/28/2014
ERD (TST6049)
Physical Properties
S40540.10.14
10/31/2014
ERD (TST6049)
Physical Properties
SC7645.02.15
02/13/2015
ERD (TST6049)
Accelerated Weathering
SC8520.04.15
05/27/2015
UL, LLC. (QUA9625)
Quality Control
Multiple -Listing R16814
09/04/2015
UL, LLC. (QUA9625)
Quality Control
Service Confirmation
Exp.10/16/2017
4. PRODUCT DESCRIPTION:
4.1 Self -Adhering Underlayments:
4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self -adhering, glass -mat reinforced, sand -surfaced, SBS
modified bitumen roof underlayment, with a 36-inch sheet width.
4.1.2 Tri-Built 5/A HT TU Underlayment is a self -adhering, non -woven polyester fabric surfaced, SBS modified
bitumen roof underlayment
4.1.3 Tri-Built Smooth HT:S/A: Underlayment is a self -adhering, glass -mat reinforced, film -surfaced, SBS modified
bitumen roof underlayment.
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity( ERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design, I.L.C. Evaluation Report A42960.10.12-R3
Cerf1fkate cf Authorkadon 94503 FL16048-R3
Revlsion 3:10/08/2015
Page 2 of S
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically
referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlavments are as fnilnu,c•
TAsu:1: ROOF COVER OPTIONS
Underlayment
Asphalt,.
Shingles
Nail -On Tile
Foam -On Tile
Metal
Wood Shakes
Slate
-
& Shingles
Tri-Built Sand-R SA Shingle
Underlayment
Yes
No
No
No
Yes
Yes
Tri-Built S/A HT TU
Underlayment
Yes
Yes
Yes
Yes
Yes
See 5.5.1
Yes
Tri-Built Smooth HT S/A
Underlayment
Yes
No
T
No
Yes
Yes
E
Yes
5.5.1 "Foam -On Tile" is limited to use of the following Approved the adhesives unless tensile adhesion / long
term aging data from an accredited testing laboratory is provided.
r Tri- Built S/A HT TU Underlayment with 3M^ 2-Component Roof Tile Adhesive AH-160 (FL6332) or Dow
TileBoncl ° Roof Tile Adhesive (FL717)
5.6 Allowable substrates are noted below:
5.6.1 Direct -Bond to Deck:
Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
Y Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not required over plywood, OSB or Southern Yellow Pine substrates, TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires
tongue -and -groove board decking be covered with plywood or OSB prior to installation of the self -
adhering underlayment.
5.6.2 Bond -to -Insulation:
Tri-Built S/A HT TU Underlayment applied to:
> Dens Deck Prime; SECUROCK Gypsum -Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam -on the systems, insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM 4474, Appendix D
or TAS 114, Appendix J.
5.6.3 Bond to Mechanically Attached Base Laver:
i-' ASTM D226, Type I or 11 felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam -on the systems, base layer shall be attached
per minimum requirements of FRSA/TRI April 2012 (04-12).
Exterior Research and Design, U.C.E
Certfflcate of AuthoRtotfon #9503 valuation Report A42960.10.12•R3
FL1604"3
Revision 3:10/08/2015
Page 3 of 5
5.6.4 Wind Resistance for Underla ment S stems in Foam -On Tile A lications: FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayment systems beneath foam -on tile systems, where
the underlayment forms part of the load -path. The following wind uplift limitations apply to direct -deck
underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12) and are used in foam -on tile
applications. Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety
per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6.4.1 Maximum. Desien Pressure = -45 0 psf.
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AH1.
Primer: (Optional) ASTM D41
Underlayment: Tri-Built S/A HTTU Underlayment, self -adhered.
5.7 Exposure Limitations:
5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation
requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below.
6.2 Re -fasten any loose decking panels; and check for protruding nail heads, Sweep the substrate. thoroughly
to remove any dust and debris prior to application, and prime the substrate (if applicable).
6.3 Tri-Built Sand-R SA Shin le Underla ment Tri-Built 5 A HT TU Underla ment or Tri-Built Smooth HT S A
Underlayment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non -Tile applications:
While priming is optional, TRI-BUILT recommends priming the deck if the final roof cover Is not slated for
installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel -off the release film diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over -granule end -laps
shall be sealed using either heat -welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back -nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet
over valley or ridge- Drape and press sheet into place; working from the center of the valley or ridge in
each direction. For valleys, apply the sheet starting at the lowest point and work upward.
6.3.3 Tile ADDlications (Tri-Built S/A HT TU Underlayment only):
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall be loaded and staged. in a manner that prevents tile slippage and/or damage to the
underlayment.
Exterior Research and Design, ur—
CerttJlcate of Authorirarlon #9s03 Evaluation Report A41960.10.11-R3
FL16048•R3
Revision 3:10/08/1015
Page 4 of 5
7. BUILDING PERMIT REQUIREMENTS: TRINITY ERD
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C. Rule 9N-3 QA requirements.
9. QUALITY ASSURANCE ENTITY: .
UL, LLC—QUA9625; (314) 578-3406; k.chancellor@us.ui.com
- END OF EVALUATION REPORT -
Exterior Research and Design, LLC.
CeWffmre of Autharhatlon p95o3 Evaluation Report A42960.10.12-R3
FL16048.R3
Revision 3:10/08/2015
Pages of S