HomeMy WebLinkAboutNOC', Phone 954.784-2941 d- 1 800-848-1919 ede, i ` ' Fax 954-784-7875 & TESTING INC. > o�- Fax www.fed-eng.com 250 SW 13th Ave Pompano Beach, Fl. 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 81, Creekside Date: June 22i 2017 Address: 8461 Cobblestone Drive, Fort Pierce, FL 34945 Order #: '17-Dk-615 Area Tested: Building'Pad .. Permit #: Material Type: Light Brown Sand Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % _ Compaction Pass 1 Center of Pad 12" FL 2.1 1 104.6 105.6. 14.0 1 99.1 %. Yes 2 SE Corner of Pad 12" FL 2.7 103.9' 105.6 14.0 98.4% Yes 3 NE Corner of Pad 12" FL 3.2 1b4.1 105.6 14.0 98.6% Yes 4 5 6 7 8 9 10 11 12 13 14 • Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification,of Sorl Bearing Capacity, Legend for Elevation: H-1 PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: .A4 SL = Springline FL = Final Lift Keith LeBlanc, P.E.` , SG = Subgrade BG Below Grade Federal Etigint erir,.g F: Testi�ig, inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. Nc;,59394 ; TOP = Top of Pipe FG = Finished Grade Ceriificat%,oT AtJwhorization #,r-A7 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property -of clients, and authorization,for.pubf:�ation of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test dot miines=the degree_ of.compacrors of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not ceruiji e�dnderlyln 'soil mate ials SQiow the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is fequired to ceriify tfiat the;undE ying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recoininen�d 4W soil bonngp,be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavyiiainG,to�rnsj retesting must be performed on this work. PAGE 1 of 2 Compacted oils Method D-6936 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the ,reverse side. The purpose of ou test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test�eplace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted, to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. 1 Environmental analysis of the soil materials is not part, of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturba ces will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all r1 ports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. 1 It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 Phone 954-784-2941 ede p��� 800-848-1919 Fax 954-784-7875 mI & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 81, Creekside Date: June 22, 2017 Address: 8461 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 17-DR-615 Area Tested: Building Pad Permit #: Material Type: Light Brown Sand Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Pad 12" FL 2.1 104.6 105.6 14.0 99.1 % Yes 2 ISE Corner of Pad 12" 1 FL 2.7 1 103.9 105.6 14.0 98.4% Yes 3 NE Corner of Pad 12" FL 3.2 104.1 105.6 14.0 98.6% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Seil Rearing Capacity. Legend for Elevation: ' PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:� A;/ 6 SL = Springline FL = Final Lift :'Keith LeBlanc, P.E. SG = Subgrade BG = Below Grade Federal Engineering,& Testing,,_ Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade C:ertificata of Authorization5471 1 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizationrf . oliiilication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines,the degree'ef compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not card th�,underiying soil materials`belcw the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required, -to certify that tiie underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend Uratlsoil b8rin3s be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/stcros,"retesting must be performed on this work. PAGE 1 of 2 i «: Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineeri g & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction t st replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction t+erify.subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an a i alysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12linches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is �ot part of the scope of services. If environmental analysis. of the soils is required, we can provide a proposal for performi g an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of�the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at tf'e time the work was performed. Determination of the pass/fail'compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. sha�l be notified. Our findings are relative to the date and areas o' our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and otfIer disturbances will void this test -and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and o and authorization for use, publication of statemE pending written. approval. It has been a pleasure working with you and we �C ) yes, all reports are submitted are the confidential property of clients conclusions or extracts from or regarding our reports is reserved forward to doing so in -the near future. 2of2 Phone 954-784 2941 le d e, L 800-848-1919 Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069' - Field Density Tests of Compacted Soils Method D-6938 Project: Pro Address: 8461 Date: June 30, 2017 Order #: DR-635 Area Tested: ,Building Pad Permit #: Material Type: Dark Brown Sand Tech: BK Residence Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Palm Bay, FL 32907 Lot 81, Creekside Fort FL Compaction Req.: 95% Proctor Method: ASTM D-1557 Test # TEST LOCATION. Probe Depth Elev. Moist % Dry Density, PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Pad 12" FL 3.3 105.9 106.3 1 12.7 99.6% Yes 2 SW Corner of Pad 12" FL 6.9 1 105.2 106.3 12.7 99.0% Yes 3 NE Corner of Pad 12" FL 7.0 105.3 106.3 12.7 99.1 % Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a vei Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith .LeBlanc,' P:E. SG = Subgrade BG = Below Grade Federal Engineering -&-Testing iris. f BC = Basecourse BOF = Bottom of Footing Florida Reg. No.`699394' TOP = Top of Pipe FG = Finished Grade Certificate ofAuth'orization #547 i As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publlcatton of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test daterin!nes thq, degree of compacti�rrof�ihe tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify tfie um�erlylndsoii matgriais bel%U;ihs proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test Is regii?fea,to,certifyr,that,the" uao,;-yfrig soils will support the proposed structure without settlement. if no soil borings have been performed to verify the underlying soils, we recommentl•+liaj"soil_t�orings ge performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy �asnlstp, . retesting must be performed on this work. PAGE 1 of 2 Compacted Pursuant to your request, Federal Engineering) project on the reverse side. The purpose of oii material only. In no way shall a compaction tes performed by the client prior to construction to v, 12" of added fill material. FET was not contra( the added fill material does not include an an, supporting the proposed structure without settle materials or conditions below the tested top 12 i the proposed structure, we recommend perfon verify the underlying soil conditions. ®i9s.Method ®-693S ®iscisimer ; Testing, Inc. (FET) has performed a compaction test at the referenced r test was to determine the degree of compaction of the tested layer of replace a soil bearing capacity determination. A soil boring test must be rify subsoil conditions. Our scope of services only included testing the top ted to perform supervision of the building pad preparation. This testing of lysis of the underlying soil materials to determine if they are capable of vent. This density compaction test does not warranty any underlying soil fiches of material. If no soil borings have been performed in the location of ping soil borings below all foundation areas of the proposed structure to Environmental analysis of the soil materials, is npt part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of t e tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at th time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and o rselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statemerjts, conclusions or extracts from or regarding our reports is reserved pending written approval. I It has been a pleasure working with you and we lool�- forward to doing so in the near future. Page 2 of 2 -e e. d .1 & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 Field' Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 81, Creekside Date: Address: 8461 Cobblestone Drive, Fort Pierce, FL 34945 Order #: Area Tested:. Building Pad Permit #: Material Type: Dark Brown Sand Tech: Client: D.R. Horton, Inc. Address: 1430 Culver Drive. NE .Compaction Req.: Proctor Method: ASTM D-1557 Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com Palm Bay, FL 32907 June 30, 2017 DR-635 BK 95% Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Pad 12" FL 3.3 105.9 106.3 12.7 99.6% Yes 2 1 SW Corner of Pad 12" FL 1 6.9 105.2 106.3 1 12.7 99.0% Yes 3 NE Corner of Pad 12" FL 7.0 105.3 106.3 12.7 99.1 % Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verificat1on-of?So'1 Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1 st, 2nd,, 3rd Lift Submitted by., t/ SL = Springline FL = Final Lift ;' ; -Keith. LeBlanc,''P.E._ SG = Subgrade BG = Below Grade `" Federal Engineering'0-Usting, Inc. BC = Basecourse BOF = Bottom of Footing _ -,Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade ? Certificate;& Authorizati6n .5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidentia�,property of clients, and authorization fgrppublication of statements, it conclusions or or extracts from or regarding our reports is reserved pending our written approval. A density16f ,t determines the degree of ,Uompaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not ceFti `;the•undeid in 'soil rratdtbis'below the proposed structure. Y tY P 9 P tY tY fY .� Y y �� R, P P The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring testls.raqu red to certify. t "at Pt' soils will support the '4 ..; `' proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we: reco rmerttl+that soilshcsings be performed .to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or afleroheavyirain- F s, retesting must be performed on this work. PAGE 1 of 2 Compacted Pursuant to your request, Federal Engineerinc project on the reverse side. The purpose of c material only. In no way shall a compaction to performed by the client prior to construction to 12" of added fill material. FET was not contrz the added fill material does not include an ar supporting the proposed structure without settl materials or conditions below the tested top 12 the proposed structure, we recommend perfoi verify the underlying soil conditions. Is Method D-6938 Disclaimer & Testing, Inc, (FET) has performed a compaction test at the referenced it test was to determine the degree of compaction of the tested layer of t replace a soil bearing capacity determination. A soil boring test must be :rift' subsoil conditions. Our scope of services only included testing the top ted to perform supervision of the building pad preparation. This testing of ilysis of the underlying soil materials to determine if they are capable of ment. This density compaction test does not warranty any underlying soil fiches of material. If no soil borings have been performed in the location of ling soil borings below all foundation areas of the proposed structure to Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performs g an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction ofIthe tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for payed areas,such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas bf our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and and authorization for use, publication of stater pending written approval. It has been a pleasure working with you and we ves, all reports are submitted are the confidential property of clients conclusions or extracts from or regarding our reports is reserved forward to doing so in the near future. Page 2 of 2