Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 2-8-1802/6/2018 12:34 PM PST TO:17724621578 FROM:5616880808 page: W St Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 (722) 462-2172e y CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT RECEIVED FEB 0 7 e.18 ST. Lucie County, Permitting PERMIT #.~ O�dOB ADDRESS 2703'Bent Pine Dr Fort Pierce FL 34951-2905 BUILDER. GHO Homes PEST CONTROL CONTRACTOR HomeTeam Pest Defense Inc. PEST CONTROL: LICENSE # JF0001886 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Percentage of solution:.50% Date of treatment: 02/08/18 N Footing ®1st Treatment ❑ Re -treat ❑ Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat Chemicals used: Sentricon Always Active HD Total gallons used: Time of treatment: AM FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the poermit is iisued to and another copy for the building permit fries. The Treatment Cer�cate shall provide the product used, identity of the applicator, time and date of the . treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a veri, fiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ Other ❑ 1 St Treatment ❑ Re -treat ® Perimeter for Final Inspection Signature of exterminator NOTE. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged APPROVED