HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 2-8-1802/6/2018 12:34 PM PST TO:17724621578 FROM:5616880808
page:
W
St Lucie County Inspections
2300 Virginia Avenue
Ft Pierce, FL 34982
(722) 462-2172e y
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
RECEIVED
FEB 0 7 e.18
ST. Lucie County, Permitting
PERMIT #.~ O�dOB ADDRESS 2703'Bent Pine Dr Fort Pierce FL 34951-2905
BUILDER. GHO Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense Inc.
PEST CONTROL: LICENSE # JF0001886
We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 220
Percentage of solution:.50%
Date of treatment: 02/08/18
N Footing
®1st Treatment
❑ Re -treat
❑ Slab
❑ 1st Treatment
❑ Re -treat
❑ Driveway
❑ 1st Treatment
❑ Re -treat
❑ Pools
❑ 1st Treatment
❑ Re -treat
Chemicals used: Sentricon Always Active HD
Total gallons used:
Time of treatment: AM
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copy for the person the poermit is iisued to and
another copy for the building permit fries. The Treatment Cer�cate shall
provide the product used, identity of the applicator, time and date of the .
treatment, site location, area treated, chemical used, percent concentration
and number of gallons used, to establish a veri, fiable record of protective
treatment. If the soil chemical barrier method for termite prevention is used,
final exterior treatment shall be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
❑ Other
❑ 1 St Treatment
❑ Re -treat
® Perimeter for Final Inspection
Signature of exterminator
NOTE. There must be a completed form for each required treatment or re -treatment and this form must be on the
job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a
re -inspection fee charged
APPROVED