Loading...
HomeMy WebLinkAboutBUILDING PLANGENERAL NOTES SUMMARY OF WORK: 1. Project Description: New Gazebo as per Section 8,00.03 (E) - Particular Permitted Accessory Structures and Uses in Residential, Agricultural, and Planned Unit Development Districts. 2. Work Involved: a. Exterior Walls/Footings/Foundation: i. New 8" CMU with stucco finish to match existing residence. ii. Concrete footing and foundation per plans. b. Exterior ceiling: i. 1x4 wood T&G ceiling, finish to be selected by owner. ii. Provide crown molding as shown, style to be selected by owner c. Electrical: i. Provide lighting and power, per plans.. d. Roofing: i. Provide new concrete "S" tiles as shown. New tile shall match existing rnain residence 3. Work completed shall meet all local and state building code requirements. COORDINATION: 1. Contractor shall verify existing site conditions of project location prior to commencement of work. 2. Contractor shall coordinate and verify all utility requirements, compatibility and location of projected utilities of project, as shown on the drawings. 3. Contractor responsible for coordinating all trades to complete work. Contractor shall issue full sets of drawings to sub- contractors commissioned to complete the work. 4. Contractor shall verify space requirements and location of project utilities. 5. Contractor shall field verify all dimensions of project. Do not scale drawings. 6. Contractor shall notify Architect of any discrepancies in drawings and/or specifications of project. Commencement of the work without proper notification to the Architect, the contractor will assume responsibility of work preformed. 7. Contractor shall notify the Architect, when the full intent of the drawings and/or specifications is not clear. Commencement of the work without proper notification to the Architect, the contractor will assume responsibility of work preformed. 8. Owner and Contractor shall coordinate Schedule of Values, [-t.pplication of Payment, Construction Cost and any other fees related to this project. 9. Owner and Contractor shall coordinate Schedule of Construction and notify Architect of schedule. CHANGE PROCEDURES: 1. Architect will submit Supplemental Instructions for minor changes. 2. Contractor may propose changes by submitting a request for change to Architect. Architect and Owner shall give written approval for all changes made by the Contractor. Commer;%Pment of the work without written approval from Architect and Owner, the contractor will assume responsibility of wor, preformed. SUBMITTAL: 1. Prior to construction Architect and Owner shall submit a list, to the Contractor of required shop drawings submittals for this project. 2. Prior to construction Architect and Owner shall submit a list, to the Contractor of all required testing for this project. Contractor shall be responsible for the cost of any testing requested by the Owner. TEMPORARY FACILITIES: 1. Contractor shall provide and maintain access to the site of the project. 2. Contractor shall coordinate with Owner for temporary facilities requirements, if required for this project. 3. Contractor shall be responsible for maintaining a clean and safe construction site. 4. Contractor is responsible for the removal of all construction debris. MATERIALS: 1. Store and protect all project products and materials in accordance with manufacturer instructions. Products and materials of this project shall be installed free of damage. 2. Architect shall approve all product or material substitutions. CLOSEOUT: 1. Contractor shall notify the Owner 30 days prior to the date of substantial completion. At th+.., time of substantially complete, Contractor shall submit a list of items (punch list) to be completed or corrected within the final days of construction. Owner and Contractor will set the project completion date. 2. Owner and/or Architect will make an inspection with seven (7) days of receipt of substantially complete punch list. Owner and/or Architect may add items to complete or correct prior to final completion. 3. Contractor shall leave site clean and free of any construction debris or equipment at the erd of the project. 4. Contractor shall give Owner operating instructions for the mechanical, electrical, and other operating equipment installed for this project. 5. Contractor shall submit to the Owner all warranties, operating and mainte, ante manuals for the following products and equipment: a. Termite Soil Poisoning b. Roof System 6. Owner may request additional warranties for other products. Contractor will be given notice prior to work. PROJECT INFORMATION DESIGN PARAMETERS: 2007 Florida Building Code, With 2009 Amendments 2007 Florida Residential Code 2007 Florida Existing Building Code 2007 Florida Plumbing Code 2007 Florida Mechanical Code 2007 Florida Fuel Gas Code 2008 National Electric Code 2007 Florida Accessibility Code (Chapter #11 2004 Florida Building Code) 2007 Florida Energy Code (Chapter #13 2004 Florida Building Code) 2004 Florida Fire Prevention Code (Based on NFPA-1 & NFPA 101 - 2003 Edition) 2002 National Fire Alarm Code - (NFPA-72) 2002 Fire Sprinkler Code - (NFPA-13/13R/13D) 2002 Standard for Automatic Fire Suppression Systems (NFPA-17/'17A) 2000 Standard for Safeguarding Const., Alterations, & Demo Operations (NFPA-241) 2001 Commercial Hoods & Ventilation - (NFPA-96) Building Design: Basic Wind Speed: Building Category: Wind Importance/Use Factor: Internal Pressure Coefficient: Building Mean Height: Roof Overhang: Roof Pitch: Exposure: Design Loads: OCCUPANCY: R3 One -Family Residence CONSTRUCTION: Enclosed 140 mph 3 second gust II 1.0 +/-0.18 10'-2" 11-6'1 6:12 C Roof Dead Load/Live Load: 15/40 psf Floor Dead Load/Live Load: 15/30 psf Type VB Unsprinklered Ext. brg walls- CMU Eng. wood trusses Int walls-MTL stds & drywall Roofing Material - Concrete S-tile to match existing residence AREA TABULATIONS: Gazebo: 128 sgft. Total Bldg. Area: 128 sgft. INDEX OF DRAWINGS rtevisedxx-xx-xx Shen.t Sheet Title Revision A0.1 Cover Sheet, General Information & Notes xx-xx-xx Al. i Site Plan & Notes xx-xx-xx A2.1 Building Plans, Elevations, Sections & Notes xx-xx-xx S1.1 Foundation & Framing Plan, Details & Notes xx-xx-xx E2.1 Lighting & Power Plan, Details & Notes xx-xx-xx THESE PLANTS' !,'ND ALL PROPOSED WORK ARE SL)BJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO OMPLY WITH ALL APPLICABLE CODES. SYM BO LS Window Q Detail Door ## Keyed Note xxx Room Name xx.x Interior Elevation 0 Wall Type xx.x Exterior Elevation AXX Wall Section AXx Building Section PROJECT CONTACTS OWNERS. Dr..Iohri Afshar 511 NW Winters Creek Road Palrn Ci ;y, Florida 34990 (77l2) 3 34-9660 ARCHITECT: Crossroads Architecture Inc. Niki L. Norton, R-A. 1235 SE Indian St., Ste. 103 Stuart, Florida 34997 (772) 287-7330 LOCATION MAP CONTRACTOR: Watlee Construction, Inc. Ryan N. Watley P.O. Box 1537 Port Salerno, Florida 34992 (772) 223-0604 fu N ".0 0 o3aa�i+� �0Efu G un O E�t'p V C ® aV+ `v(1)C: "OBE �L V N��w0� _ 0�� 0o0c0" p=L .+ aoO3U w(1)�°�. v y �� NU-L -0 �tV_ ¢c3ao3 v3 O� �... O rN 00 L M N 00 n O N pp pp 4-1 O N N N V l0 •-A N N Q c n Q Q `.... IZ- V 1L _ Qra "J (1) n C:(� N v• a) Q 4-3 70 �t 'v � O M O r 'O -a L_ ru t C L o V) v O"M a- ZwOU_ O E L_ L_E Ln N M =3 O .- N � � U U Z .-+ U) (f) :J ;i U v L a Ln ra V) 0 V ^O y a) N ru r V 1 V o C: CT _ M •� U ra Ul -0 M N � ot.0 c� Oz to E N y.- T. QL_ � fo 0 n Ln Rev. # Date Proj 11-0470 No. Status Final Issue 31-Oct-11 Date Sheet A0n1 Cover Sheet LOT COVERAGE CALCULATIONS AIR CONDITIONED AREA 1ST FLOOR A/C AREA ,,230 SQFT ENTRY 'r',2 SQFT GARAGE ii24 SQFT LOGGIA 1.50 SQFT COVERED LANAI 259 SQFT BATHHOUSE - A/C AREA 420 SQFT BATHHOUSE - LOGGIA 115.5 SQFT TOTAL STRUCTURE COVERAGE 5,080.5 SQFT EQUIPMENT AREAS 207 SQFT DRIVEWAY 2,676 SQFT POOL DECK - MODIFIED 2,843 SQFT * NEW GAZEBO 128 SQFT TOTAL COVERAGE 10,934.5 SQFT LOT AREA 27,584 SQFT ALLOWABLE COVERAGE (27,584 x .40) = 11,033.6 SQFT GENERAL CONTRACTOR TO VERIFY ALL SQUARE FOOTAGES 1. Soils shall be termite treated. 2. Landscape design and drawings by others. 3. Contractor to verify all utility connections as required. 4. Gazebo has been designed to meet all of the requirements of the Harbour Ridge Architectural Review Board. SQUARE FOOTAGE CALCULATIONS AIR CONDITIONED AREA 1ST FLOOR A/C AREA 3,230 SQFT SECOND FLOOR/BONUS ROOM 2,218 SQFT NEW BATHHOUSE (1.5 STORY) 840 SQFT SUB TOTAL A/C AREA 6,288 SQFT GARAGE (FOR DEHUMIDIFICATION) 824 SQFT TOTAL A/C AREA 7,112 SQFT NON -AIR CONDITIONED AREA ENTRY 82 SQFT LOGGIA 150 SQFT BALCONIES 269 SQFT- COVERED LANAI 259 SQFT BATHHOUSE LOGGIA 115.5 SQFT TOTAL NON A/C AREA 875.5 SQFT TOTAL AREA 7,987.5 SQFT LEGAL DESCRIPTION Lot G. RIVER POINT VILLAGE, HARBOUR RIDGE PLAT NO. 20, according to the Plat thereof, as recorded in Plat Book 31, Page 12 to 12B, Public Records of St. Lucie County, Florida. / / / / / OG s / / MOTOR COU 000, /.011� / / / / GAZEBO !� / 9116 CUT AND MODIFY EXIT OOL DECK FOR NEW SLAB AN �ni ininnT / SITE PLAN GENERAL CONTRACTOR TO VERIFY ALL SQUARE FOOTAGES RELOCATED EXISTING POOL EQUIP. %1111j BATH HOUSE .�////�� (UNDER SEPARATE PERMIT) 10'-0" SETBACK LINE P.L. = 225.04' G POOL DECK EXISTING TWO-STORY RESIDENCE ��� / / / / / I / / / / / / 1 _1 /o /f 1441 / / NOTE: SEE CERTIFIED SURVEY FOR RESIDENCE LOCATION ON SITE SCALE: 1" = 10'-0" I THESE PLANS AND ALL PROPOSED vV-- ARE SUBJECT TO ANY CORRECTIONS REOUiRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO "n�nplY WITH, AI,.I. APPLICABLE C M3 �_ a2c�nc;��o �.O �L C C: U) ° °.°�U oC O nor°am„¢ EQ,°�Ev,Q°,c 4-J C- C'i C v T SO aU 20 �U L 'P L(VVOC�a3 � \ 'B "�' � :EU V C (0 Ut L N C L[- WL gt wO (nC O C V 01N N L L 0 W ® C � O � Y t � as U-o - Q) O �'L a1-, Q-r-3a-03ro3: U .- . O i i C: 1-1 �...� O N M0) n ' L N M Ol M r; 00 00 NN O N 00N 4-JOONO U 3 N N Q n L _ Q (n 4-j N O O O'l Q ; rn .� ' � M O f o (n U C1 '—' M L- ZwOu- O E-�Lr,Q)t L E m :- U O .—N 0.-+ U Z .-i U) U) U G1U w �J` �a \ a a� r rC tJ LO of U N tro V 1 fu U 0o 70 . _ c„ � fa -0 W O ru L lU -C 4-J O �.D � ,�LL01 L. Q rV C M r U ®z to E (11 �- T — < L ® Ln a. � a Rev. # Date Proj 11-0470 No. Status Final Issue 31-Oct-11 Date Sheet - A 1 m 1 Site Plan J J Q U) O > O v GAZEBO 101 p In In C0 LU O DOI Km J rl 1-1 1 - FLOOR PLAN 1X4 T&G CEILING FINISH TO BE SELECTED BY OWNER - STD WOOD CROWN MOLDI STD WOOD 2 - REFLECTED CEILING PLAN A2.1 3 - ROOF PLAN 6 A2.1 1 SCALE: 1/4" = 1'-0" NN SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 110 WALL LEGEND GENERAL NOTES 1. Field verify all existing dimensions and utilities prior to constructic-- 'votl-v Architect Of any discrepancies. 2. Dimensions are to gaming, 3. Gazebo flooring to match existing pool deck finish. 4. Gazebo stucco finish to match existing residence, 4 - BUILDING ELEVATION N 5 - BUILDING ELEVATION ROOFING TO MATCH ;IDENCE =TAIL TO ING RESIDENCE AND PROFILE ;H TO ING SCALE: 1/4" = 1'-0" ROOFING TO MATCH ;IDENCE j =TAIL TO ING RESIDENCE AND PROFILE iH TO ING SCALE: 1/4" = 1'-0" ROOF GENERAL NOTES 1. New 2. In5_all roof tiles to match existing roof tiles of main residence. new roof tiles as per Miami Dade County N.O.A. 3. Pr vide roof truss shop drawings for Architect and Engineer approval prior to fabrication. RCP GENERAL NOTES 1. Pr vide 1X T&G ceiling at new loggia as shown. Finish shall be selected by Owner. I er to E2.1 for all light fixture, ceiling fan, and junction box locations. 3. Pr vide and install crown molding as shown. Size, profile and finish color to be selected by owner. ELEVATION GENERAL NOTES Ne Ne v roof overhang & soffits shall match existing residence in profile and construction. m roof tiles shall match existing residence in profile and color. 12 6 6 -1 BUILDING ELEVATION 7- 12 6 -I BUILDING ELEVATION THESE PLANS HAVE BEEN REVIEWED IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, ROOFING TO MATCH EXISTING RESIDENCE PRE-FAB WOOD TRUSSES @ 24" O.C. 9'-0" T.O. BEAM `r OVERHANG DETAIL TO MATCH EXISTING RESIDENCE IN MATERIAL AND PROFILE WOOD T&G CEILING - FINISH TO BE SELECTED BY OWNER STUCCO FINISH TO MATCH EXISTING RESIDENCE FOUNDATION - SEE STRUCT DWGS 0 0 CLEAN COMPACTED TERMITE TREATED FILL 6 MIL VAPOR BARRIER (MIN.) SCALE: 1/4" = 1'-0" THESE PLANS AND ALL PROPOSED .AIM APE SUBJECT TO ANY CORRECTIONS PEOUIRED BY FIELD INSPECTORS THAI I* 1" PE NECESSARY IN ORDER TO (IrWPIV �AIITIJ A-1I ADPI„11CABI I- C`,QDES. ROOFING TO MATCH �— EXISTING RESIDENCE PRE-FAB WOOD �— TRUSSES THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT AY BE NECESSARY IN ORDER TO r„1 Poiv 1AIITL1 tI I APPI IrA9g F C;ODES. 9'-0" 'r T.O. BEAM OVERHANG DETAIL TO MATCH EXISTING RESIDENCFA M , IN MATERIAL AND PROFILE,,, WOOD T&G CEILING - FINISH TO BE SELECTED BY OWNER STUCCO FINISH TO '�, L UCia COUNTY MATCH EXISTING eUILDING DIVISION RESIDENCE .; WEVIEWED FOUNDATION - FOR DemP SEE STRUCT REV :I E0 BY DWGS DATE 0'-0" °LAN AN P Ml CLEAN COMPACTED TERMITE TREATED FILL 6 MIL VAPOR BARRIER (MIN.) L�C�uQ�O O— ao-O-oY c� 0o�E�3nU,� �-, Mkt L = Qo ern ro v E,'O'OEUyC � g 'P +.+ O L� UO C_i,n3 .L COL >'N°LU E::'C1/I�, .i.+Q'0 L OL N vUi °�� N O° C C U 3U�Uaiv�� '.= °y o 0 0 U = 0 S� V '-' O li F� M Ql N M Ol 00 M � 00 O N N N 00 00 4-J O N000 N N V N N Q� Q Q V Lo 4-J (1) 0),^ LI)C C� U" v rru O O -o (o -J C (n V O ZWOLL' O E —� (3) L L, In E M S O .- N Z3 Z) 4-JU U 2!.-+ cn cn MUST SE KEPT ON JOB OR A C°C I ^; c Cl ION \MILL BE MADE: PI .� Status Issue SCALE: 1/4" = 1'-0" Date Sheet ,,0�/ O U fu I— fu L_ N — L O iIi'D _C_ V) --J C: i7 11,0 O� Q >1 -4- C: 4-J M Oz L 0 Ln fu Q_ a. s Date 11-0470 Final 31-Oct-11 A2n1 Gazebo Plans & Elevations #5 REBAR & GROUT SOLID PER FDN PLAN. o > 0 CONC SLAB FIN FLR I' FIN GR 'o e \\! (2) #5 CONT 3" MIN. COV. MI V-6" 4" BEARING FOOTER 1 SCALE: 1/2" = 1'-0" (1) #5 IN FILLED CELL (TYP.) — 2'-0" 2'-0" FOUNDATION PA 16' -0" (OVERALL) 12'-0" p'-p" 'LAB ELEV. 1 4" CON( IZETE SLAB WWF OV!_f� 6'viIL C.J. VAPOR I')ARRIER ON COMPAC-TED FILL uL 1/4" SAW -CUT 1" MIN. DEPTH CO NC. SLAB (TYP.) Z SAW CUT JOINT DETAIL SCALE: 1/2" = 1'-0" 2'-0" i I I 12'-0" 2'-0" (OVF BALL) 8" CMU BLOCK v F-L CORNERS (TYP.) -�0,N SCALE: 1 0 20 sqft - +13.4/-34.4 50 sgft - +12.3/-33.2 100 sgft - +11.4/-32.2 0 20 sgft - + 13.4/-52.9 50 sgft - + 12.3/-44.5 100 sgft - +11.4/-38.2 +13.4/-73.8 0 0 0 0 0 0 0 0 WIND LOADING DIAGRAM U f- H H fN- F U B-1 03 CJ3 1 03 I I O II f rbrom B-1 2 U F IN- FN- H FN- ! V F U FRAMING PLAN SCALE: NTS ,= CALE : 1/4" = 1'-0" f< N GENERAL NOTES: FOUNDATION PLAN 1. CONCRETE 2a. Alternate for wire mesh: a. shall be Class 1. Fiber mesh made of synthetic fiber manufacturer b. shall meet 5" Slump Test. per ACI 544.IR-82. Fibers shall be a certified suitable c. shall meet 3000 psi compressive replacement for welded wire fabric per SSTD 10-93. strer gth after 28-day cure. 3. CONCRETE MASONRY UNIT d. Grade floor slab for drainage. a. shall be meet ASTM C 90. e. Finish concrete with single trowel. b. shall load bearing concrete masonry units. f. footi g design based on soil bearing c. shall meet 3000 psi compressive caps ity of 2500 psf strength after 28-day cure. 2. REINFORCING d. Grade floor slab for drainage. a. shall meet ASTM standards for 60 Grade. e. Finish concrete with single trowel. b. verti :al reinforcing shall be 3/4" from See Finish Schedule for floor finishes. masonry. 4. MORTAR c. vertical reinforcing shall extend from a. shall meet ASTM C 270 standards. footirig through pre -cast lintels. b. shall be type M. d. horizontal reinforcing shall be cont. for c. joint type shall be concave. pre -cast lintels over openings. d. horizontal reinforcing lapping shall 5. GROUT a min. 22". a. shall meet ASTM C 476 standards. e. prot ct for reinforcing: b. shall have a min. 2000 psi compressive strength. floor slab: 3/4" min. cover from top c. shall meet 8" -10" slump test. 1-1/2" min. cover from bottom 6. SOIL BEARING CAPACITY footi g: 3" min. cover a. shall meet 2500 psf. walls: 1-1/2" min. cover bea s: 1-1/2" min. cover . 5/8" STRUCT. PLYWOOD EDGE • NAIL 8d RING SHANK NAILS @ 6" o.C. ON INTERIOR EDGES NAIL 8d RING SHANK NAILS a 6" o.c AT INTERMEDIATE BRACING C(I 01 :75/8" THK EXT. --� I •) 101 PLYWOOD SHEATHING 01 W/ PEEL & STICK ROOF UND RtAL ",, =`.- INSTALL AS PER MANUFACTU E SPECIFICATIONS 1 1 0 F I or 'I I • BDGOEWOF WALL I .I II II • @ 204'"Jo.c. �I EDGE OF ROOF NAIL 8d RING SHANK NAILS @ OVER HANG @ 4" o.c. AT ALL EDGES ROOF PLYWOOD SHEATHING NAILING PATTERN SCALE: 1" = 1'-0" THESE PLANS AND ALL PROPOSt i ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS TH'f- MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL AP P LIC ,`!!7 t' - i O fu a..+ O -M O— aao�� TCE�3a.. L N C E�,��E�� L�uoC�.a3 .L f LE==.mf C 0_uN OOQ ( ® U.0 � @Cos nC3� U u"a+� <t.0a-0 03 s U C � � ON cM C) N M Cr N 00 M 00 h (e O N 00 o® -J O N N N 00 U 0 Q h n q d .00 �. o L_ _ QLo :� a r• c v 0) (1)V) ' a L CY, ry M O _ (a (O O -a O U V) O '—' M Z LU 0 U- O v-i E L LC) N E Y M :- O — N 4-J U U Z .—+ cn U) r----- I U aCi �e U a� � ."• c Ln Ln 0 U O n� W N U c a L M • r— ^ U ro (V) L L .0 O fo (1) L � O �L C—LLCn Q �M � 3: U M O Z (� n E N Q ® Lna�/ 0 Rev. # Date 1 12-Dec-11 Bldg Dept Comments Proj 11-04.70 No. Status Final Issue 31-Oct-11 Date Sheet Simi Foundation & Framing Plans RISER DIAGRAM MAIN 0 - PANEL BATHHOUSE METER 200 AMP NEW CONECTION TO COLD WATER PIPE NEW UNDERGROUND SERVICE FROM FPL NEW GROUND ROD ELECTRODE 8'-0" BELOW GROUND SCALE: N.T.S. LIGHTING PLAN TO BATI PANEL / GAZEBO CLG HEIGHT - 9'-0" / BOA A I 1 CONNECT TO CIRCUIT @ BATHHOUSE PANEL o, Jpi SCALE: 1/4" = V-0" SCALE: 1/4" = V-0" LOAD CALCULATIONS Bathhouse 2� O amp PANEL Load Calculations: Ex. 840 sgft. @ 3.0 VA/sqft. = 2,520 VA 128 sgft. @ 3.0 VA/sqft. = 384 VA Garbage Disposal = 900 VA Refrigerator = 1,200 VA Microwave = 1,500 VA Dishwasher = 1,500 VA Dryer = 5,000 VA Washer = 1,200 VA Water Heater = 5,000 VA A/C #1 @ 5.0 kw = 5,000 VA Pool Equip. (existing) = 10,000 VA Sub -Total: = 34,204 VA Total Panel Load: A/C #1@5.0kw A/C #2@5.0kw 1st 10,000 VA @ 100% Remaining VA @ 40% = 5,000 VA = 5,000 VA = 10,000 VA = 5,682 VA Total: = 25,682 VA 25,682 VA 240 V Total Amps required: = 107.00 VA Summary: 1. Connect power and lights to Bathhouse 200 amp service. N I 107.00 amps GENERAL NOTES: LIGHTING 1. Contractor shall compare the electrical drawings 4. All electrical work and materials to be installed and specifications with drawings from other trades. per NEC, NFPA, local, state, and national code. Coni ractor shall report any discrepancies to the 5. Location of electrical raceways, switches, panels, Ar& itect. Obtain written instructions for any equipment, fixtures, etc. shall be adjusted to necE ssary changes. accommodate the work to avoid interferences 2. Furnish and install fixtures as called for on the plans anticipated and encountered. or a ; selected by Owner. 6. Coordinate heights of wall mounted lighting fixtures 3. Contractor shall verify fixture type and locations to clear mirrors, cabinets, builts-ins, trim, etc. with owner prior to installation. ELECTRICAL LIGHTING LEGEND $ Switch Single Pole Ceiling Fan - to be selected by Owner D $ Switch with Dimmer $ 3 way Switch ® Junction Box- See KEYED NOTES 'XX Recessed Lights 4X Wall Mounted Exterior Decorative Light *Note: Subscribes are used to designate light types. See LIGHTING SCHEDULE for light types. GENERAL NOTES: POWER 1. Contractor shall compare the electrical drawings and specifications with drawings from other trades. Con .ractor shall report any discrepancies to the Ar& itect. Obtain written instructions for any nec .'ssary changes. 2. Contractor to verify and coordinate utility service with local utility company. Locate meter and panel as r quired. 3. Install temporary power for construction as required. 4. All electrical work and materials to be installed per NEC, NFPA, local, state, and national code. 5. Location of electrical raceways, switches, panels, equ pment, fixtures, etc. shall be adjusted to accommodate the work to avoid interferences anti ipated and encountered. 6. Contractor shall verify switch type and locations wit owner prior to installation. Color of cover plat s, switches and receptacles shall be selected by c wrier. 7. Con ractor shall determine the exact route and loca Jon of each electrical raceway prior to make-up and assembly. 8. Outl is and appliances are shown and located on the drawings as accurately as possible. All mez surements shall be verified on the project and in a I cases the work shall suit the surrounding trim, finishes, and/or construction. 9. Heic hts of all outlets shown on the drawings are app -oximate only. 10. All c utlets installed outdoors, bathrooms, and garE ge shall have ground -fault interrupter circuit brez ker or receptacle. All outlets installed in the bed ooms shall have arc -fault interrupter rec ptacles. 11. Load data and calculations were designed based on information given to Architect at the time of the design. Prior to installation of all equipment verify size of equipment and panel sizes. 12. Electrical system shall be grounded. See Riser Diagram. 13. Outlet boxes shall be pressed steel in dry locations, cast alloy with threaded hubs in wet and damp locations and special enclosures for other classified locations. 14. Disconnect switches shall be H.P. rated, heavy duty, quick -made, quick break enclosure required by exposure. 15. Smoke detectors shall be hard wired (110 volt type) to non-switchable light circuit and shall not be connected into the load side of a ground fault circuit. 16. Smoke detectors shall be located on or near ceiling inside and outside each sleeping area. Verify locations of smoke detectors with the drawings. 17. Smoke detectors shall be 110 volt type, with a test button with battery back-up system and visible "power on" indicator. 18. All 12-volt, single phase, 15 and 20 amp branch circuits supplying outlets installed in dwelling unit family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, rec rooms, closets, hallways, similar rooms or areas shall be protected by a listed arc -fault circuit interrupter combination type, installed to provide protection of the branch circuit (NEC 2008 210.12 (B)). 19. Tamper Resistant Receptacles (NEC 406.11) are required in dwelling units in all areas as specified in 2008 NEC 210.52, all 125 volt, 15 and 20 amp receptacles. ELECTRICAL POWER LEGEND X �IDWP/GF " XX" Duplex outlet (Waterproof) _0WP Dedicated Duplex outlet (Waterproof) I (Ground Fault Interupter) XXII Telephone outlet aO Floor Duplex outlet Xx cx r XX' XX" " T.V. cable outlet Ap Quadraplex outlet (Waterproof) Mounting height to the center line of the receptacle xx :::Oxxx Type of receptacle LIGHTING SCHEDULE TYPE 11 ANUFACTURER/ DESCRIPTION LAMP VOLTS NOTES: OR EQUAL MANUFACTURER ODEL NUMBER A AS S LECTED 6" RECESSED COMPACT FLUORESCENT 32W 120 RECESSED IN CEILING BY O NER LIGHT FIXTURE OUTDOOR APPLICATION LIGHTING SCHEDULE GENERAL NOTES: 1. AI light fixLures shall be selected by Owner and installed by GC. 2. Install ligh fixtures as per manufacturer specifications. 3. Provide 4. Fi nevv ture finishes bulbs for all new installed light fixtures. r t ANS ,AND ALL PROPOSED \NUkK shall be selected by Owner. L P� 5. C ordinat final location of fixtures with Owner prior to installation. "',,P�- SUBJECT TO ANY CORRECTIONS E Old O L+ C 2 o0 3+ „caw o �a;iT°°Lv D 0 L UI 7i °cc° L 3: U_ J .� "=°.r_in�3� ® L.-�+-' OQ) TO V I---O u. 1__� 1- F--I O Q N « L M 100 O N « -~ O N I!, VlO ONO 1-1 1­1 r Q cl� Q Q N r ... V L _ Q ra a r V) � � �Q� a a vI C� (f) r O ro a -p Z O C J O' ' M 11.1 O Z W O E O -' Ln a) L LZ E�M�, I O -N OZ U U z�cnv Q) U C .U1111 L_ ru 4- O a= o M U ru L fu L -0 L O C kc .(- Ln,C-LLQ 4-J lli�C I .d 4-J� U(Y O rnrs Z e- Ln f13 Q r 0 Rev. # Date Proj No. 11-0470 Status Final Issue Date 31-Oct-1: Sheet ZRA viHY iE NECESSARY { 0 DE AB TO [)ES. COMPLY WITH ALL APO Lighting E Power Piz