Loading...
HomeMy WebLinkAboutBUILDING PERMITCode Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 http://stiucleco.gov/ce BUILDING PERMIT Page 1 Issued: 04/30/2007- Conf #: 576 Permit #: SLC- 0703-0269 Job Location: 9525 PORTSIDE DR City: FORT PIERCE Permit Type: Building Residential (SFR) Job Description: CONSTRUCTION OF A NEW SINGLE FAMILY RESIDENCE 2436 SQ FT (4) BEDROOM (2) BATH Subdiv: Palm Breezes Club Lot: 26 Block: 2 Contractor . DAVID ABRAMS Parcel: 2310-500-0068-000/7 CENTEX HOMES (561) 536-1067 3301 QUANTUM BLVD BOYNTON BEACH, FL 33426 Property Owner CENTEX HOMES (561) 536-1000 8198 JOG ROAD, STE 200 BOYNTON BEACH, FL 33437 Setbacks Left: 6.00 Right: 16.04 Front: 18.00 Rear: 14.00 Zoning: PUD Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 2,436.00. Minimum Floor Elevation: Flood Map: 175F Flood Zone: X Elev: Job Value: $ 222,552.96 Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S. Ray Wazny Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and become null and void if work authorized by such Building Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit.