Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTSt Lucie County Inspection 2300 Av enue it E `JE D Virginia Ft Pierce, FL 34982 MAY Z 5 2007 (772) 462.2172 Public Works St. Lucie County, FL CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT # 0-1®3 -6D 1 JOB ADDRESS 9�7c) rs r'4-S, 0/,' jn►� BUILDER C2. kn4 eso PEST CONTROL CONTRACTOR A 61ack_40,c PEST CONTROL LICENSE it 9 a We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: X) S__7 Chemicals used: �r*dyv,, t ty, Percentage of solution: a� Date of treatment: // 6 CI Footin�� 1st Treatment ❑ Re -treat ❑ Slab�� Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑- 1st Treatment Total gallons used: r, ` d— Time of Treatment: �) : 0 FBC104.2.6 Certificate of Protective Treatment forprevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. , The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration' and number of gallons used, to establish a verF.fiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Re-trea ther _ ❑ 1st Treatment ❑ Re -treat ❑ Perimeter for Final Inspection NOTE: 0(,:) Signature of exterminator There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6/13/02 dmr