Loading...
HomeMy WebLinkAboutBLOWER DOOR TESTPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method RECEIVED JUL 12 2018 ST. Lucie County, Permitting Date• % - / 2- /lam Permit #: i` z 0 Contractor: Job Address: S-Qd Construction: (-* New Construction - Complete ( ) Existing - After Addition House Infiltration Test Res Its SLC Climate Zone 2 CFM (50) = o0 Test Date: _ -7- Volume = = ACH (50) = CFM (50) x 60 / Volume = 7, -- Mechanical Ventilation required less than 5 ACH Passing results must be & ACH (50) or less 10Pass ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section 101507.3. Testing Comnanv Company Name: Pro Duct Services Address: 1915 Rio Vista dr., Fort Pierce, fl. I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance with Section R402.4.1.2 Climate Zone 2. Signature: Printed Name: Michael Faurot License/Certification #: 5059122 Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772462-2165 Fax 772.462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method REC IE VEb STD Runty, Permitting Date: 2, Permit#: /`"7 D L 49 V7-7 C oa �/i �'{/ P/ Lot #: 0e*actorP d 0 c f'� Address: 00 2 `p Construction: )eost Construction Test ❑ Rough -in Test Test Conditions: Date: _ % / ��J� Floor Area (ft2): ���� Time: �, o cry Primary Location of Supply Ductwork c Indoor Temperature (F): 6 •7 Primary Location of Return Ductwork Outdoor Temperature (F): 7-f— Duct Leakage: efault o Prop. Leak Free Test Pressure: S- (Pa) Baseline Duct Pressure (optional) , o / (pa) Duct Press. (Pa) I Flow Ring I Fan Press Flow Testina Company Company Name: Pro Duct Services ❑ Proposed On = Results: r ss ❑ Fail Total Leakage (ch): _ Total Leakage per 100 sgft: 3 , CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. Address: 1915 Rio Vista Dr., Fort Pierce, FI. I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: Printed Name: Michael Faurot License/Certificate#: 5059122