HomeMy WebLinkAboutBLOWER DOOR TESTPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
RECEIVED
JUL 12 2018
ST. Lucie County, Permitting
Date• % - / 2- /lam Permit #: i` z 0
Contractor:
Job Address: S-Qd
Construction: (-* New Construction - Complete ( ) Existing - After Addition
House Infiltration Test Res Its SLC Climate Zone 2
CFM (50) = o0 Test Date: _ -7-
Volume = =
ACH (50) = CFM (50) x 60 / Volume = 7, -- Mechanical Ventilation required less than 5 ACH
Passing results must be & ACH (50) or less 10Pass ( ) Fail
FBC, Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section 101507.3.
Testing Comnanv
Company Name: Pro Duct Services
Address: 1915 Rio Vista dr., Fort Pierce, fl.
I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
requirements in accordance with Section R402.4.1.2 Climate Zone 2.
Signature:
Printed Name: Michael Faurot
License/Certification #: 5059122
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772.462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
REC IE VEb
STD Runty, Permitting
Date: 2, Permit#: /`"7 D L 49 V7-7
C oa �/i �'{/ P/ Lot #:
0e*actorP d 0 c f'� Address: 00 2 `p
Construction: )eost Construction Test ❑ Rough -in Test
Test Conditions:
Date: _ % / ��J� Floor Area (ft2): ����
Time: �, o cry Primary Location of Supply Ductwork c
Indoor Temperature (F): 6 •7 Primary Location of Return Ductwork
Outdoor Temperature (F): 7-f—
Duct Leakage: efault o Prop. Leak Free
Test Pressure: S- (Pa)
Baseline Duct Pressure (optional) , o / (pa)
Duct Press. (Pa) I Flow Ring I Fan Press Flow
Testina Company
Company Name: Pro Duct Services
❑ Proposed On =
Results: r
ss ❑ Fail
Total Leakage (ch): _
Total Leakage per 100 sgft: 3 ,
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Address: 1915 Rio Vista Dr., Fort Pierce, FI.
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: Michael Faurot License/Certificate#: 5059122