HomeMy WebLinkAboutPRODUCT APPROVAL MODIFIED BITUMENT ROOF SYSTEMx "„ lump
v ? •- < .:y.,A.•, .-mac ^%tee �.�,,. Sf c,n.::a..s^G,S�""'y'
fiYE+- „•z rtr... ...f Fri f a .4�,• a -`?` Fs
�f
Fonda Bwlding Code Online Page:1 of 2
r. i . ;t.'usin
SCIS Home Cog Iri ,.• UserRe9'stratian Hot Top -a "� .SuTimit Surmarge Stats & Facts Publioeorts FBCSIaff r . BCIS Slte-Map j Unks ; Search j
Busmes Fn
a.6O
Product Approval .. - � � I� I
r P�� essl WI; ,USER:Public Lis
Ab8W_> Producr6o Ano i6 ion march >'.Aoorimtioii L'at> - � • " ApPliotian Detail
y : 'FL16027-RI
!. cation Type Revision F11L
5�.Ccie'
Q
Code Version ; 2014 j .. - .. -
Application Status Approved
I'
Comments
Archived
FipducY'•Manufacturer TRI-BUILT'Roofing Products_
r t Addre3s/Phone/Emaii 9050',Louisiana5[reet
( Merrillville, IN"46410
(201),842-2449
david.ruiz@tribuiltrriateriaisgmup.com
- Authorized Signature _ --
-David Ruiz
day d.ru¢@tribuiltrnatenalsgroup.com.
r ` Technical Representative . CRichard Schuiman
Y' -Address/Ph ohe/trnail
9050 Louisiana Street
Merrillville; IM:46410 _
r,
rich-schurman@alliedbuiiding.com
Quality Assurance;Representative C Richard Sthurman
'� • .Address/Phone/Email BOSO'Louisiana'Street
'Merrillville,, IN,46410 :, _
urman@alliedbuilding.com
Cafeg6ry Roofing.
Subcategory Modified Bitumen. Roof System
Compliance•Method Evaluation Report from a Florida Registered Architect:or'alicensed F.10
Professional Engineer
�d Evaluation ReporE- Hardcopy,Received
Florida; Engineer or -Architect Name who. developed the. Robert
Report Nieminen
•Eraloation-
Florida-UcensePE-59166'
.. - -•Qualiti'Assurance_Entity:,,.. UL.LLC.
Quality- Assurance Contract Expiration Date 03/31/2019
'• ValidatedBy.
.� John W: Knezevidi, PE
'Validation Checklist- HardcopY.ReceiGed;.
' Cerlifot0.of Independe0ce EL+6027 R1COT 2015"'Ol col Ni-`ninen od`
ReferencedStandard and Year (of Standard) -
STandard rear .
.J• - 'ASTM'D6163.
2000
ASTM D6164ASTI� v FM
D6222 FILE,
C29
0FM 447D
FM 4474 .
•Equivalence,ofPmductStandards -
Ceibfied' By
Sec?66s:60rn the Code
I
EXTERIOR RESEARCH & DESIGN, LLC.
Certificate of Authorization #9503
TRINITY �R� 353 Christian Street
Oxford, CT 06478
PHONE: (203) 262-9245
FAX: (203) 262-9243
EVALUATION REPORT
TRI-BUILT Roofing Products Evaluation Report A42970.10.12-111
9050 Louisiana Street FL16027-RS
Merrillville, IN 46410 Date of Issuance: 10/23/2012
Revision 1: 03/23/2015
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for
use of the product under the Florida Building Code. The product described herein has been evaluated for compliance with
the 51h Edition (2014) Florida Building Code sections noted herein.
DESCRIPTION: TRI-BUILT Modified Bitumen Roof Systems
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this
Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the
referenced Quality Assurance documentation changes. Trinity IERD requires a complete review of this Evaluation Report
relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its
distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 4, plus a 27-page Appendix.
Prepared by:
' ,A• • �.' =.
�y�h�+�'
The facsimile seal appearing was authorized by Robert Nieminen,
Robert J.M. Nieminen, P.E. lCr
P.E. on03/23/2015. This does not serve as an electronically signed
Florida RegistrationNo.59166,FloridaDCAANE1983 ''d�IQ. �L�� �`
document. Signed, sealed hardcopies have been transmitted to the
'1.!p,•"•tnss�
Product Approval Administrator and to the named client
CERTIFICATION OF INDEPENDENCE:
1. Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest
in any company manufacturing or distributing products it evaluates.
2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or
distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity) ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
1
�4
{: TRINITY ERD
ON 0N1'i., FAW)26fVI�t�it�r � �n p ' P IF1,R �1 rnx G ifi.sii i�J 1i 7+1 1 h' rU II i M1 ::'F� )� 'tI�Y��v
�Y►fN". >...sTAN ., t,i.,1t �` ti.��fis �i':Kf'ds
R. Teb)e
f•, Application if .•. , t
_
New.orReroof:(Tear Off):. " Ay2e' MechiAttach Page:.
s. ed Anchor Sheet;Bondedansulatlon, Bonded Roof Cover
1A42 Wood New,. Reroof (Tear, Off) or Recover. A-2 Mech.Attached Anchor Sheet; Bonded_ InsulationBo_ nded Roof Cover`;
j c 1B` ' Wood New, Reroof (Tear Off) or: B ..
r Mech Attached Base insulation; Bonded Top Insulation; Bonded Roof Cover
1C Wo
od �c y New—
Reroof (Tgar Off) or Recover C- -
5
iR Wood • New; Reroof (Tear Off) of Recover p .
Mech Attached Insulation Bonded Roof Cover
_.
Prelim Attached Insulation, Mech Attached Base Sheet Bonded Roof Cover
Sr 1tt�': 1E=1 Wood New or Reroof (Tear Off) E Non -Insulated, Mech.'Attached Base.Sheet, Bonded Roof C.over., "
1 1E-2 " 1Nood New,'Reroof (Tear Offj or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Boyer g
Wood New or Reroof (Tear -;Off), F Non -Insulated, Bonded'Roof Cover
" 8 3A Steel orConc. New, Reroof,(T
ear- Off) or Recover B Mech Attached $ase.lnsulation, Bonded Top Insulatlon, Bonded Roof Cover
k' 2B Steel or Conc. New; Reroof (Tear,off) or Recover C "Mech Attached Insulatioh, Bonded Roof Cover 10
2C Steel or Conc. New, Reroof (Tear -Off) or Recover D Prelim Attached Insulation, Mech, �Attached'Base'Sheet; Bonded Roof Cover 11
1'* 3A-1 Concrete New or' Reroof (Tear -,Off) A-1 Bonded Insulation, Bonded Roof Cover 12-14, ,
) n 3A-2 Concrete New. or Reroof Tear -Off
( ) F. Bonded Temporary Roof, Bonded Insulatlon, Bonded Roof Cover
r ' 3B Concrete New or Reroof (Tear -Off) F. Non -Insulated, Bonded Roof Cover,
rsfi 4A LWIC . New or Reroof (Tear -Off) A-1_ Bonded InsulationBonded Roof Cover
15
16-17
tt 4B LWIC New or Reroof-(Tear-off) A-2 Mech, Attached Anchor Sheet,.Bonded Insulatlon, Bonded Roof Cover
ru! 17, ..
l 4C LWIC. New or Reroof (Tear -off) . E Non-lnsulated, Mech..Atiached Base Sheet; Bonded Roof Cover 18-20
CWF New.or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover
` CWF21
ry 5B New, Reroof (Tear Off) or,Recoyer A 2 Mech, Attached Anchor 5heet; Bonded Insulation, Bonded Roof Cover
t` SC• CWF New, Reroof(Tear,off)orRecover B 22
Mech Attached Base Insulation; Bonded Top Insulation, Bonded Roof Cover 22,
SD CWF New, Reroof (Tear -Off) or Recover C Mech. Attached insulation, Bonded Roof Cover"
56 CWF 23
New, Reroof, (Tear -Off) or Recover E' Non-lrfsolated, Mech, Attached Base Sheet, Bonded Roof Cover
;fa 6A Gypsum New or Reroof Tear -Off 23
(_ ) A-1 Bonded Insulatlon Bonded Roof Cover
6B Gypsum New, Reroof (Tear -Off) or Recover A-2 Mech. Attached AnchorSheet, Bonded Insulation, Bonded Roof Cover- _
24
25
Ya 6C Gypsum New, Reroof (Tear -Off) or Recover C Mech. Attached Insulatlon, Bonded Roof Cover ._ 2b
' GD _ Gypsum New, Reroof (Tear -Off) or Recover E Non -Insulated; Mech. Attached Base Sheet, Bonded Roof Cover
it
25
7A Varlous Recover
A1 Bon26 27 _
Bonded Insulation, Bonded Roof Cover
7B Various Recover F Non -Insulated, Bonded Base Sheet, Bonded Roof Cover
27
:y The following notes aonly to the systems outlined herein:
�S 1. The roof system evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be In accordance with FBC requirements to the. satisfaction of the AHJ. Load resistance of the
5 goof deck shall be documented'through.proper codified and/or FBC Approval documentation.
1. 2.. Insulation %base sheet fasteners shall be of sufficientlength for the following deck engagement:
Y Wood:, Minimum 0.75-Inch penetration:
Y Steel:,
Minimum 0.75-Inch penetration and engage the top flute of the steel deck.
Y Concrete: = Minimum 1-inch embedment Into pilot hole in accordance with fastener manufacturers published installation instructions.
3: Unless otherwise noted,, Insulation may be a6y one layer or combinatlon ofpolylsocyanurate, polystyrene, wood fiberboard, peril bens Deck; Dens Deck Prime; SECUROCK Gypsum -Fiber
Roof Board orSECUROCK.
'fe Glass -Mat Roof Board that meets the OA requirements of F.A.C, Rule 61G203 and Is documented as meeting FBC 1505.1 and, for foam plastic, FBC 2603.4.1 or 2603,6, when Installed with the roof cover,
Exterior Research and Design, LLC, d/b/a Trinity i ERD EvaluaBon' Report A4297010:12-R1for FL16027-RI
iiA Certificate of Autfiorizatlon #9503
Prepared by: Robert Nleminen, PE-59166 Revision.1 03/23/2015
' Appendix 1, Page 1 of 27
7",
q
14. Unless:otherwise noted, refer to the following references for'borided base, plyor,cap sheet applications. TRNi 1 1 E `b
�.
.. .,ril.f, `. ,i,:i `(. 51r.�P.. Ri�AI GAL` c� :� ��141.�.�il'�ii:�lX. :S ..S1�t .�-[?;tl;1�'¢dt :AV�Srl•2T :CSe'i A - lu . N, n.,. m. •< ,.,.. .�. -.. .. _ _. - -- -. .. -
,SP
Reference .. _ la -
er
Y., Material `
BP__
F Base FBC.Approv' ASTM D4601 Type ll y . .
Applicaflon
..
(Base and Ply sheets; Asphalt Applled) Piy. FBC Approved ASTM D2178, Type IV or VI "
HA at 2 - 0 4 e
0 Ibs/squar
SBS-AA.. , ,
(SBS,-Asphalt-Applled). Cap TriBullt SBS Granular
_ SBS-TA _
HA at 20-90 Ibs/square
\1 (SBS; Torch -Applied) Cap. TrlBuilt SBS Granular,
Torch -Applied
BS-SA Base TirIBUIlt SA SBS Base
SBS, Self -Adhering}
Cap TriBullt SA SBS Cap
Self -Adhering
APP-TA Base or Ply TriBuilt APP Smooth
(APP, Torch Applied) Cap • TriBullt APP Smooth, TrIBuIIt APP Granular
Torch -Applied
APP-SA
f .(APP; Self -Adhering) Cap TrlBullt SA APP Cap
SeMAdhering•- .,
15, The following represent priming requlrements for gypsum=based coverboards:
➢ Dens Deck and Dens Deck Prime shall be fleld-primed with ASTM D41 primer prior to self -adhering or torch-applled membrane application, No
1'
priming Is required for hot
SECUROCK Gypsum -Fiber Roof Board does not require field priming for any membrane appllcatlon.
-asphalt membrane appllcations.-
16. "MDP" = Maximum Deslgn.Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 fordeterminationof
design wind loads.
Exterior Research and Design, LLC, d/b/a Trinity) ERD
Ceftiflcate of Authoelzation N9503
Prepared by: Robert Nleminen,.PE-59166
EvaluatlonReportA42970.10,12-Ri for FL16022-R1
Revislon 1: 03%23/2D15
Appendix i, Page 9 of 27
_
- ERD
TA E 2 WOOD DECK§ NEW GONSTRUC71 RECOVER
1 ON, REROOF
:.
(TEAR OFF) oR
SYSTEM TYPEE
E NON4NSULA TED, MECHANICALLY'A7TACHEDBASE SHEET,.BONDEDROOF COVER
System
No. Deck (See Note 1)•,
Base Sheet
:a
Base
Fasteners
over
R oof C - MDP�
tj
MIn; 19/32-Inch
.
Attach, ,
Polyglass Elastobase, Polyglass ElaStob'ase
Ply, Cap (psfj
W-1 plywood at max
OMG Flat Bottom,Plates
?OIy+.Polyglass G2 Base, CertainTeed (square) with 12-Inch o:c. Im4-Inch lap and12-Inch
(Optional) One
;
24-Inch spans,
Glasbase; Firestone MB. Base, JM Rerma- Roofgtlp #14, Dekfast Hex with Dekfast #14 o.c: intwo; equally spaced, staggered
Tamko
or
mo a BP AA'or SBS=AA, SBS-
_ i
ply 28 orTruFast1MP-3 with TruFast HD
Glass Base or GAFGLAS q75 center rows . _
APP-TA TA; APP=TA -52,5:
Min. 19/32-Inch
_
+ 2 plywood at max.
24-Inch spans
Polyglass Elastobase or Polyglass Dekfast.Hex:with Dekfast #14 or.TruFast Mp 12•Inch o,c. In 4-inch I,ap'and 12-pith :.
Elastobase,Poly with poly topsurface
One SBS SA, APP-
with
3 with TruFast WD o;c, in two, equally spaced, staggered
or.more SOS -
SA, SBS-TA or -52,5*
'
Min. 19/32-inch
center rows
APP=TA
'
W-3 plywood at max.
Polyglass Elastobase or Polyglass OMG Flat Bottom Plates (square) with 12 Inch o c: in 4-Inch lap and 12-inch
Elastobase Poly (q )
`in
(Optional) One.or
24-Inch spans
Roofgrip #12 o c two, equally spaced, staggered
more BP -AA or SBS-AA, SBS-
Min, 19/32-Inch
de ter rows .
APP TA TA, APP-TA 60.0
f
W.-4 plywood.at max,
Polyglass Elastobase or Polyglass OMG Flat Bottom Plates s uare with 12 inch o c. In A inch lap and 12 Inch
(.q )
z
24-Inch spans
Elastobase Pol with of to , surface
Y . Poly P Roofgrip #12' o.c, In two equally spaced, staggered
One or.more SBS SBS SA APP .
SA SBS T A
n
X.
center rows ..:
0.
APMA
.i
TABLE 1F; WOOD DECKS- NEW CONSTRUCTION OR REROOF (TEAR -OFF)
SYSTEM TYPE F: NON -INSULATED, BONDED ROOF COVER
System
No. Deck
Prlr►ier Roof Cover
Jolnt Treatment Base Ply
Min, 15/32-Inch plywood
W 5
MDP
Cap is)
at max, 24 Inch spans
(Optional) ASTM D41 None
(Optlo
SBS SA (Optional) SBS-SA or SBS SA, APP SA SBS-T A
- APp-TA
Min. 15/32 Inch plywood
_6 (Optional) ASTM D41 Plywoodjolnts are covered with 4-inch wide strips of TriBuilt SA'�
I 1 at,max.24 Inch spans
or APP TA
SBS Base, rolled Into place to create continuous bond. TriBuiICSA SOS Base . (Optional) SgS-SA or SOS -SA,. APp-SA, S.BS
APp.TA _.
or APP-TA . ;97.5�
,
.,
Exterior Research and Design, LLC. d/b/a Trinity
Cer�licefe of Authorization #9503
IERD
*.
Evaluation Report A42970,10.12-R1 for FL16027-@1
Prepared by: Robert Nieminen; PE-59166
'
- Revision 1; 03/23/2015
+1 : t-
'
Appendix 1, page.8 of 27
�7
..,_ ..-
...y .