Loading...
HomeMy WebLinkAboutMETAL ROOF PLANSoutheast Building Engiheers, LLC 6911 Pescara Drive Pace, FL 32571 772-774-9086 s.sanders(&southeastbuildinpeningeers.com ' e Contractor: TAAD WIMP-, Re0971a e* Owner: GJ, uN� F3u.,.o„ CeaR + Irf,ey,�i`7 %"7ARS1PUg1 Job Address: Puer,eralf-1 Morz, d- F; P,NC6; FL ftftip KgrAt Reece'. "3'V" C ,aIml, .Zd -6A. New Roof _ Re -Roofer Recovering.. Repair Area METAL ROOF PLAN Date: Iz /� /� 7 General Notes: 1. Entire roof deck to be renailed w/ 8d Ringshank nails @ 6" o.c. through out ASCE7-10 & FBC 2014 5th Edition Enclosed Bldg. -*4, Semi Enclosed Bldg Open Part2 Risk Cat 2N = Roof System Low Rise C&C Simplified 16 O/ Exposure b M = /Kzt = 1.0/h= c3o / 3 /12 Pitch NOA Zone 1 B a_, H=30 = X = PSF x 0.6 = -2S:3 Zone 2 B @ H=30• = X = PSF x 0.6 = -yy, / a = 9161' Zone 3 B @ H=30 = X = PSF x 0.6 = -ds. a = 3'-0" x-,?' o Max Design Pressure per NOA FL 17oZZ. I -R4 Deck Type I +-rwooy Thickness Base Sheet I u -Pe-as No. of Plies 1 Fastener Type sar-AaNCR E-Spacing - Ply Sheet — No. of Plies Fastener Type Spacing Top Ply No. of Plies Fastener Type Spacing Insulation Base Layer Type a Size — Type of Fasteners: — Spacing. Field Perimeter — Corners" '— Insulation Top Layer 'Type -- Size -- Type of Fasteners/or bAt onding material � 9x /,Z dox 61AS,NeX F%EAD G7oOD Saga?.)Drip Edge Size 2 K2 Drip Material .26 EEO . Flashing Material .s7erl- Fastener Spacing for Metal Roof Panels:. Field Ibub.c. t,v Perimeter t6"e.c,. nj Corner /d" O.C. ,Al itoWs (FIf'oc, Rcws 0W!0.c. Rows a /z" o, C. Page 1 I 1