HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-19-18planning & Deve➢cp megnt Services
Buliding & Code ➢8egaa%tiOn Divisi®n
2300 Virginia Ave
• Fort pierce, FL 34982
Fa,7172-e4624443
CERTUXATE OF TERMITE TREATMENT
,GNSTRUC'TION SOIL TREATMENT
PERMIT #: 012
JOE ADDRESS: 3
BUILDER/CONTRACTOR: l
PEST CONTROL CONTRACTOR: EVI A -BUG TERMITE &PEST CONTROL INC.
PEST CONTROL LICENSE #: JB175775
We the undersigned, hereby certify that we have pretreated. the National Pest above Control bed Associationconstrution for
subterranean termites in accordance with the standard of
Square feet if area treated: _ 23I
Percentage of solution: •05°/°
Date of Treatment:
!oTtln
1et Treatment
_Re -Treat
Driveway
19t Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: 2 S0
Time of Treatment: • 0 0
Slab
=1st Treatment
Re -Treat
Pools
1st Treatment
-.Re-Treat
Perimeter Final Inspection
ature of Exterminator ate
' FL
Ylyt
s form must be on the job
Note: There must be a complete foaf tirm me of eaceach h Inl sperm n or the scheduled inspection red treatment or re -treatment and JW/// a l and a re inspection
site to be picked up by the Inspector
fee charged.
her
FO C104.2.c6 Certificate of Protective Treatment forCertificateson of as each reiqulred protetctive treatment lsic mplef board
shall be provided to receive duplicate Treatment permit flies. The Treatment
providing a copy for the person the permit is Issued to and another copy for the building , site
Certificate shall provide the productcuesne concentration alnd numbeof the pofgallIcatoons usedntodestabllsh a verfiab/ate of the e record
f on, area
treated, chemical used, percent con
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval,
St ➢.aucae C®avntY requires for the ffine0 Inspection �® atments and dates ofapplications. aced ®se
the eoectdca➢ panel box cccver, ➢1sti ng a➢l th