Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-19-18planning & Deve➢cp megnt Services Buliding & Code ➢8egaa%tiOn Divisi®n 2300 Virginia Ave • Fort pierce, FL 34982 Fa,7172-e4624443 CERTUXATE OF TERMITE TREATMENT ,GNSTRUC'TION SOIL TREATMENT PERMIT #: 012 JOE ADDRESS: 3 BUILDER/CONTRACTOR: l PEST CONTROL CONTRACTOR: EVI A -BUG TERMITE &PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We the undersigned, hereby certify that we have pretreated. the National Pest above Control bed Associationconstrution for subterranean termites in accordance with the standard of Square feet if area treated: _ 23I Percentage of solution: •05°/° Date of Treatment: !oTtln 1et Treatment _Re -Treat Driveway 19t Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 2 S0 Time of Treatment: • 0 0 Slab =1st Treatment Re -Treat Pools 1st Treatment -.Re-Treat Perimeter Final Inspection ature of Exterminator ate ' FL Ylyt s form must be on the job Note: There must be a complete foaf tirm me of eaceach h Inl sperm n or the scheduled inspection red treatment or re -treatment and JW/// a l and a re inspection site to be picked up by the Inspector fee charged. her FO C104.2.c6 Certificate of Protective Treatment forCertificateson of as each reiqulred protetctive treatment lsic mplef board shall be provided to receive duplicate Treatment permit flies. The Treatment providing a copy for the person the permit is Issued to and another copy for the building , site Certificate shall provide the productcuesne concentration alnd numbeof the pofgallIcatoons usedntodestabllsh a verfiab/ate of the e record f on, area treated, chemical used, percent con protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval, St ➢.aucae C®avntY requires for the ffine0 Inspection �® atments and dates ofapplications. aced ®se the eoectdca➢ panel box cccver, ➢1sti ng a➢l th