Loading...
HomeMy WebLinkAboutFBC ENERGY CONSERVATIONPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: 1 D -s - l d Permit #: I / O — ® 61J Lot Contractor: Cc' Address: 3,oq/ lc%BoS(, Construction: ❑ Post Construction Test ❑ Rough -in Test Test Conditions: Date: Floor Area (ft2): 2%0% Time: ,LAM Primary Location of Supply Ductwork gec//'a"✓h3 Indoor Temperature (F): 757 Primary Location of Return Ductwork Outdoor Temperature (F): 19 S Total Leakage Test (Outside) Duct Leakage: ❑ Default ❑ Prop. Leak Free AProposed On = G- ©• 4 "� o Test Pressure: 7_�;_ (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Pass o Fail Installed Pa J Z 2X Total Leakage (cfm): Total Leakage per 100 sgft: 0.0a CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. Testing Company Company Name: GFA International, Inc. Address: 607 NW Commodity Cove, Port St. Lucie, Florida 34986 I hereby certify that the above Duct Se ling Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with Section R403.2G2 2 Signature: Printed Name: J//�'/�h���1 License/Certificate #: b-7 50600 3S' RECULvED NOV 13 2018 Permitting Department St. Lucie County, FL