Loading...
HomeMy WebLinkAboutENVIRONMENTAL PROTECTION SELF CERTIFICATION7- i 90Pa�i\ ;.'-@ntaI Florida Department ofRick Scott Governor Environmental ProtectPOEC a Lt. Governor �� s Lopez-Cantera Bob Martinez Center 1 5 201 2600 Blair Stone Road Noah Valenstein Tallahassee, Florida 32399-2400 Secretary CONDITION FOR THE DEPARTMENT OF THE ARMY SELF -CERTIFIED STATE PROGRAMMATIC GENERAL PERMIT FOR A PROJECT AT A PRIVATE, SINGLE FAMILY RESIDENCE Self Certification File No.: 0359629001EE General Conditions: 1. The time limit for completing the work authorized on July 26, 2021. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner on the enclosed form and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Limits of this authorization: a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or Construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form. 7. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation or alteration. Manatee Conditions: 1. All personnel associated with the project will be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee will advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act. 2. All vessels associated with the construction project will operate at "Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a fourfoot clearance from the bottom. All vessels will follow routes of deep water whenever possible. 3. Siltation or turbidity barriers will be made of material in which manatees cannot become entangled, will be properly secured, and will be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. 4. All on -site project personnel are responsible for observing water -related activities for the presence of manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving. 5. Any collision with or injury to a manatee will be reported immediately to the FWC Hotline at 1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida. 6. Temporary signs concerning manatees will be posted prior to and during all in -water project activities. All signs are to be removed by the permittee upon completion of the project. Awareness signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used (see MyFWC.com). One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8 %Z" by I I" explaining the requirements for "Idle Speed/No Wake" and the shut down of in -water operations must be posted in a location prominently visible to all personnel engaged in water -related activities. Submerged Aquatic Vegetation Conditions: 1. Avoidance. The piling -supported structure will be aligned so as to minimize the size of the footprint over SAV beds. 2. The height of piling -supported structure will be a minimum of 5 feet above MHW/OHW as measured from the top surface of the decking. 3. The width of the piling -supported structure is limited to a maximum of 4 feet. A turnaround area is allowed for piling -supported structures greater than 200 feet in length. The turnaround is limited to a section of the piling -supported structure no more than 10 feet in length and no more than 6 feet in width. The turnaround will be located at the midpoint of the piling -supported structure. 4. Over-SAV bed portions of the piling -supported structure will be oriented in a north -south orientation to the maximum extent that is practicable. 5. Terminal Platforms: a. If possible, terminal platforms will be placed in deep water, waterward of SAV beds or in an area devoid of SAV beds. b. If a terminal platform is placed over SAV areas and constructed of grated decking, the total size of the platform will be limited to 160 square feet. The grated deck material will conform to the specifications stipulated below. The configuration of the platform will be a maximum of 8 feet by 20 feet. A minimum of 5 feet by 20 feet will conform to the 5-foot height requirement; a 3 feet by 20 feet section may be placed 3 feet above MHW to facilitate boat access. The long axis of the platform should be aligned in a north -south direction to the maximum extent that is practicable. c. If the terminal platform is placed over SAV areas and constructed of planks, the total size of the platform will be limited to 120 square feet. The configuration of the platform will be a maximum of 6 feet by 20 feet of which a minimum 4-foot wide by 20-foot long section will conform to the 5-foot height requirement. A section may be placed 3 feet above MHW to facilitate boat access. The 3 feet above MHW section will be cantilevered. The long axis of the platform should be aligned in a northsouth direction to the maximum extent that is practicable. If the 3 feet above MHW section is constructed with grating material, it may be 3 feet wide. 6. Pilings will be installed in a manner which will not result in the formation of sedimentary deposits ("donuts" or "halos") around the newly installed pilings. Pile driving is the preferred method of installation, but jetting with a low pressure pump may be used. 7. The spacing of pilings through SAV beds will be a minimum of 10 feet on center. 8. The gaps between deckboards will be a minimum of 1/2 inch. Marsh and Mangroves Conditions: 1. Marsh: a. The piling -supported structure will be aligned so as to have the smallest over -marsh footprint as practicable. b. The over -marsh portion of the piling -supported structure will be elevated to at least 4 feet above the marsh floor. c. The width of the piling -supported structure is limited to a maximum of 4 feet. Any exceptions to the width must be accompanied by an equal increase in height requirement. 2. Mangroves: a. The width of the piling -supported structure is limited to a maximum of 4 feet. b. Mangrove clearing is restricted to the width of the piling -supported structure. c. The location and alignment of the piling -supported structure should be through the narrowest area of the mangrove fringe. Sea Turtle and Smalltooth Sawfish Construction Conditions: The permittee will comply with the following protected species construction conditions: 1. The permittee will instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water -related activities for the presence of these species. 2. The permittee will advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973. 3. Siltation barriers will be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg, Florida. 4. All vessels associated with the construction project will operate at "no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will preferentially follow deep -water routes (e. g., marked channels) whenever possible. 5. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions will be implemented to ensure its protection. These precautions will include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment will cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. 6. Any collision with and/or injury to a sea turtle or smalltooth sawfish will be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. 7. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation. 8. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (727-824-5312). 9. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takereport.nmfsser@noaa.gov. 10. Sea turtle and marine mammal stranding/rescue organizations' contact information is available by region at http://www.mnfs.noaa.gov/pr/health/networks.htm. 11. Smalltooth sawfish encounters shall be reported to http://www.flmnh.ufl.edu/fish/sharks/sawfish/sawfishencounters.html. 12. All work must occur during daylight hours. Special Conditions: ,-r 1. For concrete piles installed by impact hammer: a. The piles will be less than or equal to than 24 inches in diameter; and b. Not more than 10 piles will be installed per day if in open water; or, c. Not more than 5 piles will be installed per day in a confined space. A confined space is defined as any area that has a solid object (e.g., shoreline, seawall, jetty) or structure within 150 feet of the pile installation site that would effectively serve as a barrier or otherwise prevent animals from moving past it to exit the area. This does not include objects such as docks or other pile -supported structures that would not stop animal movement or significantly reflect noise. 2. Metal piles will NOT be installed by impact hammer. 3. The Permittee is responsible for obtaining any'take' permits required under the U.S. Fish and Wildlife Service's regulations governing compliance with the Migratory Bird Treaty Act or the Bald and Golden Eagle Protection Act. The Permittee should contact the appropriate local office of the U.S. Fish and Wildlife Service to determine if such 'take' permits are required for a particular activity. 4. The Permittee is responsible for compliance with 50 CFR 224.103 prohibiting approach within 500 yards of a right whale, with limited exceptions. 5. Special Conditions Related to All Reviews and Authorizations are available at: bttp://www.saj.usace.army.mil/Missions/RegulatoIT/source-Boo and must be followed.