TERMS AND CONDITIONS
Self Certification File No.: 0359629001EE
Construction Conditions:
Private residential single family docks are subject to the following criteria in accordance with Section
403.813(1)(d), F.S. The dock to be repaired or replaced:
1. Is a functional dock, which is currently able to provide access to boats moored at the dock, unless the
dock has been rendered nonfunctional by a discrete event such as a storm, flood, accident or fire
within the past year;
2. Is in the same location and of the same dimensions and configuration as a previously permitted or
exempt dock;
3. Will be built without adding new surface area to the dock such as walkways, gangplanks, or
catwalks;.
4. Does not involve filling other than to install the pilings; existing piles may be cut or pulled to remove
them; and.
5. Construction materials may differ from those that currently exist, and minor deviations are allowed
to upgrade the dock to meet current structural and design standards.
General Conditions for Sovereignty/State-Owned Submerged Lands Authorizations:
Any use of sovereignty/state-owned submerged lands is subject to the following general conditions
that are binding upon the applicant and are enforceable under Chapters 253, F.S. or Chapters 258,
F.S.
1. Sovereignty/state-owned submerged lands may be used only for the specified activity or use. Any
unauthorized deviation from the specified activity or use and the conditions for undertaking that
activity or use will constitute a violation. Violation of the authorization will result in suspension or
revocation of the applicant's use of the sovereignty/state-owned submerged lands unless cured to the
satisfaction of the Board of Trustees of the Internal Improvement Trust Fund (Board).
2. Authorization under Rule 18-21.005, F.A.C., conveys no title to sovereignty/state-owned submerged
lands or water column, nor does it constitute recognition or acknowledgment of any, other person's
title to such land or water.
J
3. Authorizations under Rule 18-21.005, F.A.C., may be modified, suspended or revoked in accordance
with its terms or the remedies provided in Sections 253.04, F.S. or Chapter 18-14, F.A.C.
4. Structures or activities will be constructed and used to avoid or minimize adverse impacts to
resources.
5. Construction, use, or operation of the structure or activity will not adversely affect any species which
is endangered, threatened or of special concern, as listed in Rules 68A-27.003, 68A-27.004, and
68A-27.005, F.A.C.;
6. Structures or activities will not unreasonably interfere with riparian rights. When a court of
competent jurisdiction determines that riparian rights have been unlawfully affected, the structure or
activity will be modified in accordance with the court's decision.
7. Structures or activities will not create a navigational hazard.
8. Structures will be maintained in a functional condition and will be repaired or removed if they
become dilapidated to such an extent that they are no longer functional.
9. Structures or activities will be constructed, operated, and maintained solely for water dependent
purposes.
10. The applicant agrees to indemnify, defend and hold harmless the Board and the State of Florida from
all claims, actions, lawsuits and demands in any form arising out of the authorization to use
sovereignty/stateowned submerged lands or the applicant's use and construction of structures on
sovereignty/state-owned submerged lands. This duty to indemnify and hold harmless will include
any and all liabilities that are associated with the structure or activity including special assessments
or taxes that are now or in the future assessed against the structure or activity during the period of the
authorization.
11. Failure by the Board to enforce any violation of the authorization or waiver by the Board of any
provision of the authorization will not invalidate the provision not enforced or waived, nor will the
failure or waiver prevent the Board from enforcing the waived or unenforced provision in the event
of a future violation of that provision.
12. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set
forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with
the provisions and conditions of the authorization, the authorization may be terminated by the Board
after written notice to the applicant or its successors or assigns. Upon receipt of such notice, the
applicant or its successors or assigns will have thirty (30) days in which to correct the violations.
Failure to correct the violations within this period will result in the automatic revocation of this
authorization.
13. All costs incurred by the Board in enforcing the terms and conditions of the authorization will be
paid by the applicant. Any notice required by law will be made by certified mail at the address shown
on page one of the authorization. The applicant will notify the Board in writing of any change of
address at least ten days before the change becomes effective.
14. This authorization does not allow any activity prohibited in a conservation easement or restrictive
covenant of record that prohibits the activity.
Manatee Conditions:
The following conditions are intended to protect manatees from direct project effects; THESE
CONDITIONS APPLY ONLY IN WATERS THAT ARE ACCESSIBLE TO MANATEES:
1. All personnel associated with the project will be instructed about the presence of manatees and
manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee
will advise all construction personnel that there are civil and criminal penalties for harming,
harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the
Endangered Species Act, and the Florida Manatee Sanctuary Act.
2. All vessels associated with the construction project will operate at'Idle Speed/No Wake' at all times
while in the immediate area and while in water where the draft of the vessel provides less than a
four -foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
3. Siltation or turbidity barriers will be made of material in which manatees cannot become entangled,
will be properly secured, and will be regularly monitored to avoid manatee entanglement or
entrapment. Barriers must not impede manatee movement.
4. All on -site project personnel are responsible for observing water -related activities for the presence of
manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes
within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the
50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not
reappeared within 50 feet of the operation. Animals must not be herded away or harassed into
leaving.
5. Any collision with or injury to a manatee will be reported immediately to the FWC Hotline at
1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife
Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3969) for
south Florida.
6. Temporary signs concerning manatees will be posted prior to and during all in -water project
activities. All signs are to be removed by the permittee upon completion of the project. Awareness
signs that have already been approved for this use by the Florida Fish and Wildlife Conservation
Commission (FWC) must be used (see MyFWC.com). One sign which reads Caution: Boaters must
be posted. A second sign measuring at least 8 1/2' by I P explaining the requirements for 'Idle
Speed/No Wake' and the shut down of in -water operations must be posted in a location prominently
visible to all personnel engaged in water -related activities.
Self -Certification Requirements:
The user agrees to the following:
1. The information provided herein is true and accurate.
2. Construction of the project must be completed within one year from the self -certification date. If the
project cannot be completed within that time frame, or the project is to be modified, the Department
must be contacted for authorization requirements.
3. Any substantial modifications in the plans for this project must be submitted to the Department for
review, as changes may result in a permit being required.
4. This self -certification will automatically expire if site conditions materially change; if the terms,
conditions, and limitations of the self -certification are not followed; or if the governing statutes or
rules are amended before the project is completed.
5. Department personnel will be allowed to enter the property for purposes of inspecting the project for