HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODE 6-26-18Date: 42 r? if
Contractor:
Planning & Development Services
-' Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772462-6443
RECEIVED
JUL 2 6 zole
FBC ENERGY CONSERVATION CODE Per Department
Duct Sealing Certification Stt.tLuc uc1e County
Prescriptive and Performance Method
%�y, Permit #: � Lot #: '20 _
Address: � / vyroOCLQA Jr, bp2P
Construction: )6 Post Construction Test ❑ Rough -in Test
Test Conditions: Date: 7'926 Floor Area (ft2): U W
Time: 7,20 Primary Location of Supply Ductwork C
Indoor Temperature (F): Primary Location of Return Ductwork "IC.
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: r j�efault ❑ Prop. Leak Free ❑ Proposed On = 0 3
Test Pressure: (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: PrPass ❑ Fail
Installed Pa
r O Total Leakage (cfm): + O/
Total Leakage per 100 sgft: . `l
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Testing Company
Company Nam ;;:Pc Address: (7S20 Rmemw
®IBC Sui�P `110 �4�Tcs�v�(�P ��I 32a2�
I hereb ertify a ve that the Duct Sealing Leakage results demonstrate compliance with 6h Edition FBC Energy Conservation requirements in accordance with
Signature: efl� � t , �1�I � � � Q�
Printed me: �f�y!'Ie5 P2 �� License/Certificate#: if
ECEIVE[7,.1.
I JUL 3 0 2018
44�