HomeMy WebLinkAboutMETAL ROOF PLANSoutheast Building Engineers, LLC
5911 Pescara Drive
Pace, FL 32571
772-774-9086
s.sanders@southeastbuildingeninaeers.com
Contractor:
Owner: 1,yjv1 o- 8,,/t-pw CS Coop, d J6yn1 MoRrA
Job Address: G?y0 1?&.a, A✓c Fr Rgu % FL
Metal Roofing "5-V) C,e,rrP ZG A.
New Roof _ Re -Roof X Recovering_ Repair Area
METAL ROOF PLAN -
I
Date: 12- A 1
General Notes:
1. Entire roof deck to be renailed w/ 8d
ringshank nails @ 6" o.c. through out
ASCE7-10 & FBC 2014 5th Edition Enclosed Bldg. k, Semi Enclosed Bldg Open
Part2 Low Rise C&C Simplified
Risk Cat 2N = ,/G U /.Exposure G /A = /Kzt = 1.0/h= 3 0 / 3 /12 Pitch
Roof System ".a "' Ca,MP • 26 SQ. NOA . FL 17622.
Zone 1 B @ H=30 = X = PSF x 0.6 =
Zone B@H=30.= X = PS_Fx0.6=- Yq, t. a= P-O`/
Zone 3 B.@ H=3.0 = X = PSF z 0.6 = -65. 1 a = 2 -' o " x gt rr
Max Design Pressure per NOA 0
Deck Type prw000 Thickness �3z"
Base Sheet iU - No. of Plies 2. Fastener Type SeLF_ Spacing
Ply Sheet — No. of Plies Fastener Type Spacing
Top Ply - No. of Plies Fastener Type Spacing
Insulation Base Layer Type . — Size -
Type of Fasteners: Spacing Field - Perimeter -- Corners f
Insulation Top Layer Type - Size
Type of Fasteners/or bonding material iL "/(y' Ne,�WAwax #M4.0 Into
Drip Edge Size 2" K 2 t� Drip Material .29 Gs Flashing Materials
Fastener Spacing for Metal Roof Panels: Field 16"04 iu Perimeter !6 oG. iW Corner k�'p,G,_��
&%Q.s@ WO.L Rmws(W la, C. Rows.a
Page 1 I 1