Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTRECEIVED Phone 954-784-2941 1919 Aede'r M 954-784-7875 JUN �: � 3 1A18 Fax 954-784-7875 & TESTING INC. Permitting Department wwWfed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 St. Lucie County Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 16, Creekside Date: June 7, 2018 Address: 8417 Cobblestone Drive, Fort Pierce, FL Order #: 18DR477 Area Tested: Building Pad Permit #: tl ZkZ Y Material Type: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: Palm Bay, FL 32907 L Proctor Method: 95% ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 13.8 100.8 105.6. 14.0.-- • . - 95.5% Yes, 2 NE Corner of Buildin Pad 12' FL 13.9 105.1 105.6 14.0 99.5% Yes 3 SW Corner of Building Pad 12" FL 13.0 .105.0 105.6 14.0 99.4% Yes 4 5 6 7 .8 9 10 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soi F3earinR Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: / _le,= SL = Springline FL = Final Lift Keith LeBlanc, P.E. :./fl« SG = Subgrade BG = Below Grade Federal Engineering & Testing, Inc:' BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394' TOP = Top of Pipe FG = Finished Grade Certificate of Authorization A471. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients; and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the te.t; id layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil mate�Pa!s below the_ proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underVy gs4silwl sunpo'rt°tha proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to e4aiunate1 the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Compacted Soils, Method D-6938 Disclaimer Pursuant to your request, Federal Engineeri g & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose ofIour test'was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring/test must be performed, by the client prior to construction tol verify subsoil conditions. Our scope of services only included testing the top. 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysislof the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no ,soil borings have been performed in the.location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is Inot part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for perform'ng an environmental analysis of the soil materials. The scope of services is for determination of the degree -of compaction of he tested layer of material -only. No other analysis is implied or warranted. Job project specifications were not available at t I e time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of'the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for•paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and and authorization for use, publication of stater pending written approval. It has been a pleasure working with you and we y r , alves, all reports are submitted are the confidential property of clients , conclusions or extracts from or regarding our reports is reserved forward to doing so in the near future. Page 2 of 2