HomeMy WebLinkAboutFIELD DENSITY TESTRECEIVED Phone 954-784.2941 800-848-1919 eder" 1111 yp�Q Fax 954-784-7875 & TESTING INC. ;wmitting Department www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 i_ude County Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 23, Creekside Date: Address: 3039 Woodswalk Drive, Fort Pierce, FL Order #: Area Tested: Building Pad Permit #: Material Type: Pale Brown Sand with Traces of Shell Tech: Client: D;R. Horton, Inc. Address: 1430 Culver Drive NE Palm Bay, FL 32907 June 21, 2018 18DR544 BK Compaction Req.: 95% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture /o Compaction Pass 1 Center of Building Pad 12" FL 7.0 105.9 107.2 14.0 98.8% Yes 2 SW .Corner of Building Pad 12" FL 6.5 107.0 107.2 14.0 99.8% Yes 3 NE Corner of Building Pad 12" FL 6.1, 106.3 107.2- 14.0 99.2% . Yes 4 5 6 7 8 9 10 11 12 13 pj)v 14 Remarks: See Reverse Side (Page, 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of _Sgjl !Bearing Capacity. Legend for Elevation:i PR = Proofroll 1,2,3 = 1st, 2nd, 3rd LiftBep Elm-Ell SL = Springline FL = Final Lift Keith:LeBlafic P.E. SG = Subgrade BG = Below Grade Pede/ 1 Engineering A;Testin!; Imc. BC = Basecourse BOF = Bottom of Footing JUL 0 9 2018 j . .�lorida Reg. No..59394' TOP = Top of Pipe FG = Finished Grade Certificate of.Authorization #54,71. As a mutual protection to clients, the public and ourselves, aare i as en I p; peiry ofclients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserveg o approval. A ensity test determines;the degree of compactiomof the tested layer ofmaterial only. A density does not replace a soil bearing capacity determ Q0 T AP ripm4fogf, arlying scili,matenals bblow"the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occ oring test is required to certify that the,underlying soils,will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings bd1parformed ko 'evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Compacted Soils'.Method' D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client, prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material., FET was not con racted to'perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. I This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil b Irings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements. of.. 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, loc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or. dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the pubic and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you we look forward to doing so in the near future. Page 2 of 2 ederal & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests. of Compacted Soils M Phone 954-784-2941 800.848-191.9 Fax 954-784-7875. y�fvvw.fed-eng.com Project: Proposed Residence Lot 23, Creekside �bdtte: June 21, 2018 Address:. 3039 Woodswalk-Drive,. Fort Pierce, FL Order#: 18DR544 Area Tested: Building Pad Permit #: 1 Z ­ 6 Ld 5� Material Type: Pale Brown Sand -with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Palm Bay, FL 32907 Compaction. Req.:. 95% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe.: Depth Elev. Moist. % Dry Density PCF Proctor. Value PCF Optimum Moisture /o Compaction Pass 1 Center of Building Pad 12" : FL 7.0 .. 105.9 107.2 14.0 98.8% Yes 2 SW Corner of Building Pad 12" FL 6.5 107.0 107.2 14.0 99.8% Yes 3 NE Corner. of Buildin Pad 12" FL 6.1 106.3 107.2 14.0 99:2% Yes 4 5 6 7 8 In 9 , tow 10 11 12 13 14 \��►11!lii� ��� Remarks: See Reverse Side (Page 2 of 2) for Additional Information -for Disclaimer This Is a Compaction Test oniv on the top 12"-of the pad and is not a verification of S911 acity �'•, Legend for Elevation: "' N o9394 `0 PR = Proofroll 1,2,3 = 1st, 2nd, 3rd.Lift Submitted by: SL = Springline FL = Final Lift APPRO Vith LeBlanc, P,E r �, SG = Subgrade BG Below Grade ederal-Engineedr;g.i gting n .` �� vj BC = Basecourse BOF = Bottom of Footing Florida. Reg. No. 56 4� -.�`.ORIO�;; TOP = Top of Pipe FG = Finished Grade Certificate of Authoriz9flo 1--- A As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential propertyW clients, and authorization -(otIl fi'�n o t@fn�ents. conclusions or extracts from or regarding our reports is reserved pending our written approval. A densily test determines the degree of compaction o thl {esteti i) material only. A density does not replace'a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soll boring testis required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the undedying.soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2