HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODE 6-27-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
RECEIVED
JUN 17 2018
Permitting Department
St. Lucie County
Date: �J_ ��.. ' �_ Permit #: ! � Z ' () Y6" 0 Lot #:
Contractor. � fz� — K°Yk<L^ Address: J 1 c74 <<<J` u'( `'A C S- (�
Construction: .Post Construction Test ❑ Rough -in Test
Test Conditions: r ,�
Date: ,L (D l LF Floor Area (ft2):
Time: Primary Location of Supply Ductwork
Indoor Temperature (F): Primary Location of Return Ductwork c c
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free ;OProposed On = d
Test Pressure: D . C-'> (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring - Fan Press Flow (cfm) Results: Oass ❑ Fail
Installed Pa
d 3 7T Total Leakage (cfm): S—�•.1\
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sqft.
Testing Company
Company Name: �(C=<r C c Address:
�
I hereby certify that the above Duct Sealing
�Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: Crr`.�'w
� 1A w4Vq �t-AJ r \(b
Printed Name: Y License/Certificate #: