Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTPhone 954-784-2941 ed e �_ 800-848-1919 ' Fax 954-784-7875 8 TESTING INC. WrYMIed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 14, Creekside Date: June 7, 2018 Address: 8409 Cobblestone Drive, Fort Pierce, Fl- Order #: 18DR476 Area Tested: Building Pad Permit #: /7(7Z — 6!Z_ Z- Material Type: Pale Brown Sand with Traces of Shell Tech:. BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 12.9 101.2 106.0 14.0 95.5% Yes 2 SW Corner of Buildin Pad .12" FL 13.7 101.9 106.0 14.0 96.1 % Yes 3 NE Corner of Buildin Pad 12" FL 13.1 105.0 106.0 '14.0 99.1 % Yes 4 5 6 7 8 I 9 10 11 J 12 13 14 Remarks: _See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the -Pad and is not a verification of Legend for Elevation: PR = Proofroll 1,2,3 = 9 st, 2nd, 3rd Lift Submitted by: ,SL = Springline FL = Final Lift Keith LeBlanc, Pi.E. SG = Subgrade, BG = Below Grade Federal Engineering &-Testing,:lnc-. BC = Basecourse BOF = Bottom of Footing Florida Reg:: No. 59394 TOP = Top of Pipe FG = Finished Grade Certificate O%Authorizaf& #5471 As a mutual protection to clients; the public and ourselves, all reports are submitted as the confidential property of clients, and' authorization for publication ofAaAtOnents, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compacfion•of the tested layer bf,inaterial only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materialsbelQ'y4 a proposed strurhue. Tfi results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying-sa ls�id) support tli6 Wposeii structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the,suitbUity, of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work' PAGE 1 of 2 Comp Pursuant to your request, Federal Engin project on the reverse side. The purpos material only. In no way shall a compacl performed by the client prior to constructi 12" of added fill material. FET was not c( added fill material does not include an an, the proposed structure without settlement conditions below the tested top 12 inches structure, we recommend performing soil soil conditions. Environmental analysis ofthe soil mat( required,we can provide a proposal for for determination of the.degree of comp; Soils Method D-6938 Disclaimer firing & Testing, Inc. (FET) has performed a compaction test at the referenced of our test was to determine the degree of compaction of the tested layer of n test replace. a soil bearing "capacity determination. 'A soil boring test must be to verify subsoil conditions. Our scope of services only included testing the top tracted to perform supervision of the building pad preparation. This testing of the Isis of the underlying soil materials to determine if they are capable of supporting This density compaction test does not warranty any underlying soil materials or f material. If no soil borings have been performed in the location of the proposed rings below all foundation areas of the proposed structure to verify the underlying is not part of the scope of services. If environmental analysis of the soils is rming an environmental analysis of the soil materials. The scope of services is of the tested layer of material only. No -other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common induIstry, requirements of 950/6 of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard fPr paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site. work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves,. all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions ;or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and 1we look forward to doing so in the near future. Page 2 of 2