HomeMy WebLinkAboutFBC ENRGY CONSERVATION CODE 11-28-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: u-'2 g'1 D Permit #: I t Z —C�l(D / Lot #: oZ
Contractor: j)A tl L�`C'��� Address: ,;,Dv;z LrJOBC�S' ��I
Construction: ❑ Post Construction Test ❑ Rough -in Test
Test Conditions:
Date: Floor Area (ft2): Z D :5z
Time: 191-7 Primary Location of Supply Ductwork 10".4
Indoor Temperature (F): Primary Location of Return Ductwork (vec
Outdoor Temperature (F): >a
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free (Proposed On = Z 0,036
Test Pressure: 2 �_ (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: 10ass ❑ Fail
Installed Pa 11 Total Leakage (cfm):
Total Leakage per 100 sgft: L7
CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sqft.
Testing Comuany
Company Name: GFA International, Inc.
Address: 607 NW Commodity Cove, Port St. Lucie, Florida 34986
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5t� Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: /�/ c
Printed Name: /V�i44 l"lawez/ License/Certificate#: I/�1� J0'�00
NOV 3--0 2018
Permitting Department
St. Lucie County, FL