Loading...
HomeMy WebLinkAboutFBC ENRGY CONSERVATION CODE 11-28-18Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772462-2165 Fax 772462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: u-'2 g'1 D Permit #: I t Z —C�l(D / Lot #: oZ Contractor: j)A tl L�`C'��� Address: ,;,Dv;z LrJOBC�S' ��I Construction: ❑ Post Construction Test ❑ Rough -in Test Test Conditions: Date: Floor Area (ft2): Z D :5z Time: 191-7 Primary Location of Supply Ductwork 10".4 Indoor Temperature (F): Primary Location of Return Ductwork (vec Outdoor Temperature (F): >a Total Leakage Test (Outside) Duct Leakage: ❑ Default ❑ Prop. Leak Free (Proposed On = Z 0,036 Test Pressure: 2 �_ (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ­10ass ❑ Fail Installed Pa 11 Total Leakage (cfm): Total Leakage per 100 sgft: L7 CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sqft. Testing Comuany Company Name: GFA International, Inc. Address: 607 NW Commodity Cove, Port St. Lucie, Florida 34986 I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5t� Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: /�/ c Printed Name: /V�i44 l"lawez/ License/Certificate#: I/�1� J0'�00 NOV 3--0 2018 Permitting Department St. Lucie County, FL