Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTederal & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 P'Seev _ permitting Qepaent 5t. Lucie County Field Density Tests of Compacted Soils Method D-6938 Phone 954-784-2941 800.848.1919 Fax 954-784-7875 www.fed-eng.com Project: Proposed Residence Lot 123, Creekside Date: March 9, 2018 Address: 8448 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 18DR180 Area Tested: Building Pad Permit #: Z- - Material Type: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 6.9 106.8 107.0 10.1 99.8% Yes 2 ISW Corner of Building Pad 12" FL 8.3 1 106.3 107.0 10.1 99.3% Yes 3 NE Corner of Building Pad 12" FL 6.8 106.9 107.0 10A 99.9% Yes 4 5 6 7 8 9 10 11 12 13 14 p� p� Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer ��•• �tG E NSF •,� �O� This is a Compaction Test only on the top 12" of the pad and is not a verification of So I Be.$ g QaRacJtY, Legend for Elevation: PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.E r °,° STATE SG = Subgrade BG Below Grade Federal Engineering'.b esting Inc. �� BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394f�s+�` `\�� TOP =Top of Pipe FG =Finished Grade Certificate of Authorizatlon`��aMAL. ``�Z\d As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization fdr�p{.bp aji n't�f{AXments, conclusions or extracts from or regarding our reports is reserved pending ourwritten approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soll boring test is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying solls, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rainstorms, retesting must be perforr"00010*o ROVAL PAGE 1 of PARTIAL APP