HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODEDate: g 2 Y
Contractor: .
Job Address:
Planing & Development Services; Building & Code Regulation Division
2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE R402.4.1.2
House Infiltration Test (Blower Door) Certification RECENED
Prescriptive and Performance Method �,,:;
>7 2018
Oea
Permit #: 7�� �/� h,.aU le Cnl_w
l':�' C;r T-.
Construction: (Y) New Construction — Complete ( ) Existing — After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM (50) _ 3 Test Date:
Volume 1Q097
ACH (50) = CFM (50) x 60 / Volume = �• �� Mechanical Ventilation required less than 3 ACH
Passing results must be & ACH (50) or less (� Pass ( )Fail
FBC, Energy
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting
shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105
(3)(f), (g) or (1) or an approved third party. A written report of the results of the test shall be signed by the party
conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
FBC, Residential
R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when
tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida
Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in
accordance with Section M1507.3.
Testing Company
Company Name:
I hereby c=sin
at the a
hr requccordag
Signatu
Printed Name` /
?570 'mcy_'j/r4/cL1vd
Address: �'o JcsonviI le i= / 32225
W House Infiltration results demonstrate compliance with FBC Energy Conservation
with Section R402.4.1.2 Climate Zone 2.
License/Certification #: )'?y W 0 K)(—.
Planning & Development Services
—' Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE V
Duct Sealing Certification
Prescriptive and Performance Method
Date: Permit M / `l v 13 Lot #: �-
Contractor: Y � � t or�V) Address: �) q 6 je Wci i r Ct r' P+. P) eP C2 F/ 3Lf9y_5
Construction: p'Post Construction Test ❑ Rough -in Test
Test Conditions: 999
Date: g ''ZY is Floor Area (ft2):
Time: `j. 30 em Primary Location of Supply Ductwork 'f-t;'c
Indoor Temperature (F): Primary Location of Return DuctworkiL
Outdoor Temperature (F):
Total Leakage Test (Outside) , 0 3
Duct Leakage: Default ❑ Prop. Leak Free ❑ Proposed On =
Test Pressure: 2� (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: PPass ❑ Fail
Installed Pa
(D3 5 ,2 Total Leakage (cfm): ` 033
Total Leakage per 100 sgft: / 7O
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
Testing Company CY570 ('5ency Square 8'Q Sir Lfi 0
Company Nam G Address:y4���So�►yi��e i= 132225
I hereb ertify that the ove Duct Sealing Leakage results demonstrate compliance with 5"1 Edition FBC Energy Conservation requirements in accordance with
Sec ' n R403.2.2.
Printed N e: ��� �% �S Cbi License/Certificate M
gr\juj 0 W)(,