Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST 5-10-18Phone 954.784-2941 r"' `__= 800.848-1919 e d eFax 954.784-7875 & TESTING INC. wvvw.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 12, Creekside Date: May 7, 2018 Address: 3146 Tidewater Circle, Fort Pierce, FL Order #: 18DR376 Area Tested: Building Pad Permit #: 4(2 - C && 5 Material Type: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Palm Bay, FL 32907 Compaction Req.: 95% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 10.3 105.8 108.3 14.0 97.7% Yes 2 JSW Corner of Building Pad 12" FL 8.3 106.2 108.3 14.0 98.1 % Yes 3 NE Corner of Building Pad 12" FL 8.9 105.3 108.3 14.0 97.2% Yes 4 5 6 7 8 MAV Z 9 erml frog d 10 pie Coon077en 11 12 13 14 1 L 0.01111111// 1 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer \\ This is a Compaction Test only on the top 12" of the pad and is not a verification of 40 WOW. Legend for Elevation: - PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: r SL = Springline FL = Final Lift Keith LeBlanc, Pam.* SG = Subgrade BG = Below Grade Federal Engine6j g 'Testing,'MV BC = Basecourse BOF = Bottom of Footing Florida Reg. No. Oj3t,",, `OQ'��� hori fi TOP = Top of Pipe FG = Finished Grade Certificate of Autt t 84 R-' 6" *' As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizati,p }`��� i441►t-f Y;ents, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compa tlori 60,00 `9,S194113 e& of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will supportthe proposed structure without settlement, If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2