HomeMy WebLinkAboutFIELD DENSITY TESTr, RECEVED �_- Phone 954-784-2941 800.848.1919edei'-a`1 MAY. 2.5 2018 Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33068 Permitting Department Field Density Tests of Compacted Soils ethod D-6938 Project: Proposed Residence Lot 12, Creekside Date: May 7, 2018 Address: 3146 Tidewater Circle, Fort Pierce, FL Order #: 18DR376 Area Tested: Building Pad Permit #: 7/Z _066 i Material Type: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth .Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 10.3 105.8 108.3 14.0 97.7% Yes 2 SW Corner of Buildin d Pad 12" FL 8.3 106.2 108.3 14.0 9 8. 1% Yes 3 NE Corner of Building Pad 12" FL 8.9 105.3 108.3 14.0 97.2% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification, of._ oil Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by, - a"�-- SL = Springline FL = Final Lift Keith LeBls c; P,E, �, �+ SG = Subgrade BG = Below Grade Federal Engineering &Testing, Inc. BC = Basecourse BOF = Bottom of Footing Florid6-Reg. No.'59394- TOP = Top of Pipe FG = Finished Grade Certificate of Authorizatiori_#5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of cRantsi anu authorization for;'publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction. ofthe tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the unddP,ring soil materials below the`.proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to cestifyih_afthe 6ndeirlyiny soils will^supportthe proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings`be`perfoImod fo,:evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting inustihe perfoinsd;on this work. PAGE 1 of 2 Com Pursuant to your request;':Federal Engine project on the reverse side. The purpose material only.'Ih no way shall a`Compactil performed by,the,client prior to constructie 12" of added fill material. - FET. was not co, added fill material does not include an ana the proposed structure -without settlement. conditions below the tested top 12 inches i structure, we'recom'mend'performing soil b soil conditions. Environmental analysis of the soil mat( required, we can provide a proposal for for determination of the degree of comp 3d Soils Method D-6938 Disclaimer :ring & Testing, Inc. (FET) has performed a compaction test at the referenced of our test was to determine the degree of compaction of the tested layer of n test replace a soil bearing capacity. determination. A soil boring test must be to verify subsoil conditions. Our scope of services only included testing the top tracted to perform supervision of the building pad preparation. This testing of the rsis of the underlying soil materials to determine if they are capable of supporting This density compaction test does not warranty any underlying soil materials or material. If no soil borings have been performed in the location of the proposed rings below all foundation areas of the proposed structure to verify the underlying is not part of the scope of services. If environmental analysis of the soils is rming an environmental analysis of the soil materials. The scope of services is of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common Ind 1 stry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard ifor paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances turbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication ofl statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you we look forward to doing so in the near future. Page 2 of 2