Field Density Tests of Compacted Soils Method D-6938
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
www.fed-eng.com
Project: Proposed Residence Lot 6, Creekside Date: June 7, 2018-
Address: 3139 Tidewater Circle, Fort Pierce,. FL Order #: 18DR474
Area Tested: Building Pad 'Permit
Material Type: Pale Brown Sand with Traces of Rock'& Shell Tech: BK
Client: D.R. Horton, Inc.
Address: . 1430•Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1.557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Most
off.
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Center of Building Pad
12"
FL
11.0
104.8
107.9
14.0
97.1 %
Yes
2
INE Corner of Building Pad
12"
FL
13.9
104.0
107.9
14.0
96.4%
Yes
3
SW Corner of Building Pad
12"
FL
13.2
105.5
107.9
14.0
97.8%
Yes
4
5
6
7
8
9
Em on
10
11
JUN
1 1-2018 i
12
-
13
BY:
14
�illrr
Remarks: See Reverse Side Page 2 of 2 for Additional Information for Disclaimer OHN t
.This Is a Compaction Test only on the top 12" of the pad and Is not a verification of S it Bear' ENs'�. /ems
Legend for Elevation: / ,`�2C)
PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: ( 394 ,
SL = Springline FL = Final Lift Keith LeBlanc, P.E. ZZ
SG = Subgrade BG.= Below Grade Federal Engineering °� �rtg, In F �'
BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394% 0� ' tV
TOP = Top of Pipe FG = Finished Grade Certificate of Authorizatijr,, F 1`,4OR_IOP-'G\����'
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization f�r�wostc
f�¢ te�ts�conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of th �r & iyt lotonly. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the propose�. kb uits
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring testis required to certify that the underlying soils will support the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate.the sultability of the underlying
soil to support the proposed structure. After laying dormant fora period of 90 days or after heavyrain/storms, reteslinAPPAOV�D
p y s p PAGE 1. of 2
Phone 954-784-2941
1919
eder"'
954-784-7875
Fax 954-784-7875
& TESTING INC. www.fed-eng.com
250 SW 13th Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 6, Creekside Date: June 7, 2018
Address: 3139 Tidewater Circle, Fort Pierce, FL Order #: 18DR474
Area Tested: Building Pad Permit #:
Material Type: Pale Brown Sand with Traces of Rock & Shell Tech: BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.:
Palm Bay, FL 32907 Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry,
Density
PCF
Proctor
Value
PCF
Optimum
'Moisture
%
Compaction
Pass
1
Center of Building Pad
12"
FL
11.0
104.8
107.9
14.0
97.1 %
Yes
2
NE Corner of Building Pad
12"
FL
13.9
104,0
107.9
14.0
96.4%
Yes
3
SW Corner of Building Pad
12"
FL
13.2
105.5
107.9
14.0
97.8%
Yes
4
5
6
7
8
9
10
11
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Soi ,Bearl'ng Capacity.
Legend. for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: �.
SL = Springline FL = Final Lift Keith LeBlanc, P.E.
SG = Subgrade BG = Below Grade Federal Engineering,.Testing; Inc. /
BC = Basecourse BOF = Bottom of Footing Florida Reg. ;No. 59394
TOP = Top of Pipe FG = Finished Grade Certificate of Authorization= f547-1
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients,-, mid authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested 18yer.of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil material, below ih� 'proposed-siruianre: 'The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the under ying+sgiF will supper t1i'6 proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to;avalu 3fe+;tlie srSltability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on tfils Work.
PAGE 1 of 2
Compa
Pursuant to your request, Federal Engii
project on the ;reverse side. The purpo
material only. In no way shall a compac
performed by the client prior to construct
12" of added fill material. FET was not c
added fill material .does not include an ar
the proposed structure without settlemer
conditions below the tested top 12 inches
structure, we recommend performing soil
soil conditions.
Soils Method D-6938 Disclaimer
Bering & Testing, Inc. (FET) has performed a compaction test at the referenced
of our test was to determine the degree of compaction of the tested layer of
ion test replace a soil bearing capacity determination. A soil boring .test must be
m to verify subsoil conditions. Our scope of services only included testing the top.
►ntracted to perform supervision of the building pad preparation. This testing of the
flysis of the underlying soil materials to determine if they are capable of supporting
. This density compaction test does not warranty any underlying soil materials or
of material. If no soil borings have been performed in the location of the proposed
)orings below all foundation areas of the proposed structure to verify the underlying
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for pierforming an, environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication o statements, conclusions or.extracts from or regarding our reports is reserved
pending written approval.