HomeMy WebLinkAboutPRODUCT APPROVAL STRUCTURAL COMPONENTSFlorida Building Code Online Page 1 of 2
SCANNED
COUNTY
SCIS Home I Log In I User Registration I Hot Topics 1 Submit Surcharge I Stats & Facts Publications I FBC Staff BCIS Site Map I Links I Search {
FI rida
r Product Approval
IR USER: Public User
Product Approval Menu > Product or Application Search > Application List > Application Detail
FL # FL17147-112
Mgjrjarg Application Type Revision
Code Version 2017
Application Status Approved
*Approved by DBPR. Approvals by DBPR shall be reviewed and ratified
by the POC and/or the Commission if necessary._
Comments
Archived
Product Manufacturer
Address/Phone/Email
Authorized Signature
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email
Category
PA Subcategory
• Compliance Method
Evaluation Entity
Quality Assurance Entity
Quality Assurance Contract Expiration Date
Validated By
Certificate of Independence
Referenced Standard and Year (of Standard)
Equivalence of Product Standards
Certified By
Sections from the Code
0
Huber Engineered Woods LLC
10925 David Taylor Drive
Suite 300
Charlotte, NC 28262
(704) 548-5442
kurt.koch@huber.com
Kurt Koch
kurt.koch@huber.com
Ken W. Hlx
1446 Hwy 334
Commerce, GA 30530
(706) 336-3041
ken.hix@huber.com
Walker Campbell
1446 Hwy 334
Commerce, GA•30530
(704) 562-1053
walker.campbell@huber.com
Structural Components
Products Introduced as a Result of New Technology
Evaluation Report from a Product Evaluation Entity
IAPMO Uniform Evaluation Services LLC.
PFS Corporation
10/01/2018
IAPMO Uniform ES
FL17147 R2 COI Certificate of Independence for Evaluation odf
Standard
ICC-Evaluation Service AC310
Approved Evaluation Entity
File COPY
Year
2015
hqs://www.floridabuilding. org/car/car_app_dtl.aspx?paratn=wGEVXQwtDgvCo3EapiIlBd... 2/28/2018
11
Florida Building Code Online Page 2 of 2
Product ApprovahMeEhod
Date Submitted 10/20/2017
Date Validated 10/20/2017
Date Pending FBC Approval
Date Approved 10/25/2017
Summary of Products
FL #
Model, Number or Name
Description
17147.1
ZIP System (R) Wall Sheathing
ZIP System (R) Wall Sheathing
Limits of Use
Installation Instructions
Approved for use in HVHZ: No
FL17147 R2 II ZIP Sheathing Install Manual-2013.pdf
Verified By: ICC Evaluation Service, LLC
Approved for use outside HVHZ: Yes
Impact Resistant: No
Created by Independent Third Party:
Design Pressure: N/A
Evaluation Reports
Other: limited to structural aspects of panel
FL17147 R2 AE ESR-1474 (2).Ddf
FL17147 R2 AE ESR1474.odf
17147.2 ZIP System (R) Wall Sheathing Combination Wall Sheathing and Water Resistive Barrier
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL17147 R2 II FL17147 ZIP Sheathino Install Manual -
Approved for use outside HVHZ: Yes 2 10 3.odf
Impact Resistant: No Verified By: IAPMO Uniform Evaluation Services LLC.
Design Pressure: N/A Created by Independent Third Party:
Other: Evaluation Reports
FL17147 R2 AE E1553 R0544 Huber Engineered Woods
LLC.odf
Back Next
Contact Us :: 7801 Blair Stone Road. Tailahassee FL 32399 Phone: 850-487-1824
The State of Florida Is an AA/EEO employer. Copyright 2007-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement
Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records. request, do not send
electronic mall to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. -Pursuant to
Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address If
they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to
supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under
Chapter 455, F.S., please click eh .re .
Product Approval Accepts:
® OEM F
Credit Card
Safe. .
https://www.floridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgvCo3EapiIlBd... 2/28/2018
ZIPSystem®Roof & Wall Sheathing i„��/Sfe�%% M
- I:NSTALLAT-IO-N..MAN.UAL-:--_
Contents
02 ZIP System® Sheathing Installation On Roofs
03 ZIP System"" Tape Installation -
Roof Panel Seams
04 ZIP System' Tape Installation -
Roof Panel Seams (continued)
05 Roof Covering Installation Instructions
06 ZIP System® Roof & Wall Sheathing Installation
07 ZIP System" Tape Installation - Panel Seams
ATTENTION: This installation ,guide is Intended to provide general
Information for the designer and end user. The following guidelines
will help you safely and properly install the ZIP System" Roof & Wall
wall sheathing. We urge you, and anyone installing this product,'to
read these guidelines]n order to minimize any risk of safety hazards
and to prevent voiding any applicable warranties. This manual Is
a general .Installation guide and does not cover every Installation
condition. Proper Installation shall be deemed to mean the most
restrictive requitement spedifled by Huber Engineered Woods (HEW),
local building code, engineer or architect of record or other authority►
having jurisdiction. You are fully and solely responsible for all safety
requirements and code compllance. For additional Information contact
Huber Engineered Woods LL.C.
ZIP System° Roof & Wall Sheathing Safety Guidelines
Follow all OSHA regulations and any other safety guidelines.and safety
practices during installation and construction.
Use approved safety belts and/or harnesses or otherfall protection equipment.
Install ZIP System panels and tape only in dry conditions and on dry surfaces.
Do not install in rain, snow, frost or other slippery conditions.
- Wear rubber -soled or other high -traction footwear while installing ZIP System
sheathing in a roof application. Do not wear footwear with wom soles or, heels.
Ensure the roofing surface Is free from oil, chemicals, sawdust, dirt, tools,
electric cords, air hoses, clothing and anything else that might create a
tripping hazard.
Install temporary toe boards along the ZIP system sheathing roof surface.
What Is ZIP System° Roof & Wall Sheathing?
ZIP System Roof & Wail sheathing is code -recognized as a wood structural
panel, roofing underlayment (IMES ESR-1473), water -resistive barrier
and air barrier (IMES ESR-1474). ZIP .System Roof & Wall sheathing
has a built-in moisture barrier that lets you say good-bye to building paper
or housewrapon the walls and felt paper on the roof.' Simply install the
panels, tape the seams, and you have a structural wall sheathing, water -
resistive barrier and air barrier or a structural roof sheathing and roofing
underlayment all from one *product.
FASTER. TIGHTER. ENERGY EFFICIENT.
08 ZIP System® Roof & Wall Sheathing - Window
Installation Flanged Windows & Brick Mould Windows
09 ZIP System® Roof & Wall Sheathing - Window
Installation Brick Mould Windows (continued)
10 ZIP System® Roof & Wall Sheathing -
Penetration Openings
11 ZIP System® Roof & Wall Sheathing
Installation Details
12 ZIP System® Roof & Wall Sheathing
Installation Details (continued)
ZIP System Roof &: Wall sheathing can be used with a range of exterior
claddings and roof coverings. Approved wall coverings include brick,
vinyl, stone, wood fiber cement, wood and cedar shakes, traditional hard .
coat stucco and specified dreinable EIFS applications, however it is
not recommended for use with adhesively attached EIFS. Approved roof
coverings include asphalt -fiberglass shingles, metal tiles and panels, day and
concrete tiles, slate and slate -type shingles and. wood shakes and shingles.
Follow all cladding and roof covering manufacturer's installation instructions.
ZIP System Roof & Wall sheathing can be used on buildings of Type
III (Roof Applications ONLY) and -Type V construction and construction
permitted under the IRC.
ZIP System® Roof & Wall Sheathing Includes:
ZIP Systemsheathing panels with built-in moisture barrier with preprinted
fastening and tape guides
ZIP System tape
Storage and Handling
- . Set panel stack on three supports (stickers) to keep off the ground.
Outdoors, cover panels loosely with waterproof protective material.
Anchor covers on 'tbp, of the stack, but keep away from sides and bottom
to assure good air circulation.
In high moisture environments, out banding on the panel stack to prevent
edge damage.
ZIP Systen? Roof & Wall Sheathing Notes and Limitations:
Do not use on roofs with slopes less than 2112.
- Do not use abutted against general stone or masonry without providing a
minimum of a 1/2" gap.
Do not install ZIP System tape in temperatures less than 20" F
- ZIP System products are not recommended for manufactured housing
applications that are built under a federal building code administered by
the U.S. Department of Housing and Urban Development (HUD).
Do not use panel edge clips (H-Clips) with ZIP System Roof & Wall sheathing
without expressed written approval from Huber Engineered Woods. —
Do not.use ZIP System tape to permanently seal around circular roof
projections (plumbing vents, pipes, curved walls, etc.)
Contents (continued)
Wall Coverings
Z(P System Roof & Wall sheathing should be covered with the finished
roof covering or exterior cladding within 180 days of installation.
Finished roof and exterior cladding products should be installed per
the manufacturer's installation instructions. ,
Per the recommendation of the Western Red Cedar Lumber Association
and the U.S. Forest Products Laboratory, wood siding should be primed
before installation.
When original roofing oecladdrigs are removed and replaced on existing ZIP
System sheathing, the. roof or wall should be covered with an additional
roofing underlaymerlt or water resistive barrier prior to installation of the
new finished roofing or cladding.
Note: In cladding systems requiring multiple layers of water -resistive barriers,
like traditional hard -coat stucco, ZIP System sheathing is intended only to
replace the first layer.
Wet Blown Cellulose Insulation
In addition to following -manufacturer installation instructions, we recommend
a ma)amum moisture content of the cellulose of less than 250/6 measured at
the inside surface of the ZIP System panel before closing the wall cavity.
Secondary Coatings
Do not apply secondary coatings or treatments to ZIP System Roof & Wall
sheathing panels. with the exception of the following:
HEW approved fire resistant coatings: Fire resistant coatings must be
tested and approved by HEW for use with ZIP System panels.
Field applied water-soluble borate insecticide or fungicide treatments
applied to the non overlay side of the. panel. See technical tip, 'Termite
Treatments on 2JP System Roof & Wall Sheathing," on zipsystem:com for
more information.
Permeable laminated radiant barrier foil or paint. For a radiant barrier foil or
coating to be considered permeable, it must have an applied permeance of
five perms or greater as tested by the ASTM E 96 wet cup standard. For a
radiant foil, the permeance evaluation would include any adhesive and/or
backer used to laminate a foil. For a radiant paint1boating, the permeance
evaluation shouldbe conducted at the applied thickness of the painUooating.
ZIP System Roof and Wall sheathing replaces only the first layer in mutFunderiayment systems.
" Edge support is not required by code with V2 (32/16 span, rated) and 5A (40120 span rated), perbrmance category sheathing if the framing does riot exceed 24' oc.
and the total load does not aicceed 93 list for 1/2 and 156 psf for 618 performance categories This is based on L1180 deflection criteria for tote) load.
ZIP System° Roof & Wall Sheathing Installation Manual
ZIP System® Sheathing installation on Roofs
Overview: ZIP System Roof & Wall. sheathing is composed of. ZIP System panels and ZIP System seam sealing tape. ZIP System° Roof & Wall. Sheathing
panels should be fullyinstalled before the seam sealing tape is applied. In general, the ZIP System roof sheathing panels should be installed from the lowest point
on the roof to the highest it is at the discretion of the installer whether to apply tape from the top down or from the bottom up. However, working from the highest
sections of the roof and working down will minimize foot. trafficon the tape. The following installation steps are presented as guidelines and a general outline of
the installation process.. These are manufacturer installation recommendations — please visit zipsystem.com for a library of flashing and installation detail&'You are
fully and solely responsible for all safety requirements. Good construction and safety practices should be followed at all times.
Step 1.
Ensure that the panel surface is dry and clean of any nails, sawdust, or
other debris or protrusions prior to installing or walking on the panels.
After ensuring compliance with all OSHA and local code safety
guidelines, install ZIP System sheathing panels with the moisture
barrier surface facing outside. The long edge (8') should be oriented
perpendicular to the framing members, and panels should be installed
With . the 4' edge seams staggered a minimum of 24".
1/89 spacing between square edges.of ail adjacent panels is recommended,
in accordancewith industry standards for wood sheathing. (Tongue &
Groove panels are designed to self -space and do not require manual
spacing..on the 8' edges.)
Step 2.
Ensure that.ZIP System panels span at least three framing members and
a framing member supports the entire 4' edge of the panels.
Fasten the ZIP System Roof & Wall sheathing panel to the framing
members with code approved fasteners spaced at the appropriate
edge and intermediate spacing.. It is the responsibility of the general
contraocirto verify proper fastener type and spacing prior to installation.
- Apply the fasteners 30 from the panel ends andtomers:
An ideal installation would be where fastener heads are flush with the
panel surface. However, due to variations in materials and limitations
on equipment, this may be difficult to achieve in some situations. It
is not required to tape over overdriven fasteners unless the fastener
head creates a hole through the entire panel thickness. Please see
the technical tip, `Overdriven Fasteners in ZIP System Roof and Wall
Sheathing;" for more information.
Step 3..
Install temporary toe boards as necessary when applying the ZIP System
sheathing panels up the slope of the roof planes. .
V Panel Edges 4' Pane] Edges
Ila,
lN�rt
The unique edge profile is
designed to accommodate
incremental panel
expansion anddoes not
require rnanual.gapping
along the 8' edges.
tre'
Maintain 118. space
where 4' edges meet. -
Unique edge profile is on
8' edges only.
ZIP System" Tape Installation - Roof Panel Seams
Apply ZIP System tape after all ZIP System Roof & Wail sheathing panels are fully fastened to roof -framing members. Only ZIP System tape should be used to
seal the seams of ZIP System panels. Ensure that the panel surfaces are dry and free of any nails, sawdust and other debris, or protrusions. Avoid stepping
on tape in high temperature environments. ZIP System tape Is a contact tape that requires pressure for an adequate seal.
Step 1.
Apply ZIP System tape to every vertical and horizontal panel seam. it is
at the discretion of the installer whether to apply tape from the top down
or from the bottom up. However, working from the highest sections of
the roof and working down will minimize foot traffic on the tape.
Ensure that the tape is.centered over the seam within +/- 1/2" to provide
adequate coverage and:to ensure that wrinkles in the tape are minimized.
Ensure that tape lengths are continuous across the S'horizontal edge
of the panels. If splices are unavoidable, create an overlapping splice
of at least 3. Apply moderate pressure onto the surface of the tape to
ensure a secure bond between the panel and the tape.
Use ZIP System tape gun or tape roller to apply pressure to the tape
and smooth out any wrinkles.
Take special care to remove any voids and/or trapped air at splice
areas and T-joints.
RrsFTape Piece Y overlap Second Tape Piece
Step 2.
For valley areas of framing, we recommend you use 6" wide ZIP System
tape. This tape is wider than panel seam tape and is designed to give you
optimal protection in valley areas.
Starting from the bottom and working your way up, apply one continuous
piece of 6" tape to that the center of the tape is over the valley, seam,
Use the.tape gun or.tape: roller to apply pressure to the tape to ensure
proper contact with the panel and to eliminate any wrinkles that might
have occurred in the tape. Take special care to seat tape completely
into the valley.
Note:
It is Important to pay extra attention 'to valley taping as water is
directed toward the valleys during rain events.
_..ems;...:: „ ' � :,_• �'!
- Self -adhering Ice and water bafflers may be required by code. ZIP
System tape is not considered a replacement for self -adhering ice
and Water barriers. Therefore, when self -adhering The and water
barriers are required, they should be installed in addition to ZIP
System tape.
ZIP System® Roof & Wall Sheathing Installation Manual
ZIP System" Tape Installation - Roof Panel Seams (continued)
Step 3.
If 6' ZIP System tape is not available, use two continuous pieces of 3.75"
ZI,P System panel seam tape over the entire Length of the valley seam,
overlapping the pieces on the valley seam by at least 1".
- Starting from the bottom, install the first piece of tape overlapping the
valley seam by at least 1 ".
- Use the tape gun or tape•rollerto apply pressure to the tape to ensure
proper contact with the panel and to eliminate any wrinkles that might
have occurred in the tape.
Apply the second piece of tape, overlapping the first piece in the valley
seam by 1 ".
- Repeat use of the tape gun or roller to make sure the tape is adequately
adhered and tightly pressed into the valley seam.
Note:
It is important to pay extra attention to valley taping as water is
directed -toward the valleys during rain events.
- Self -adhering ice and water barriers may be required by code. ZIP
System tape is not considered a replacement for self -adhering Ice
and water barriers. Therefore, when self -adhering Ice and water
barriers are required, they should be installed in addition to ZIP
System tape. •
Step 4.
To provide temporary weather protection to roof/wall intersections
of dormers or other wood -sheathed projections, apply 2" of the tape
width up the vertical projection from where it intersects with the roof.
The remaining "tape width can be adhered to the ZIP System roof
sheathing panels.
Use the tape gun or tape roller to apply pressure to the tape and smooth
out any wrinkles.
Step 5.
Install ZIP System -tape over hips and ridges by centering the tape over
The peak seam. Apply tape in sufficient length to completely extend the
length of the hip or ridge.
Starting from the lowest. point of the hip and working up, press tape into
place keeping tape centered over the hip. Apply moderate pressure
onto the surface of the tape to ensure a secure bond between, the panel
and the tape.
Cut ridgetape. as required for ventilation prior to installing ridge vent.
Step S.
Tape over toe.board nail holes once the toe boards are removed, working
from the highest toe boards to the lowest.
First piece
of tape
t" overlap
Second piece
oftepe
Roof Covering Installation Instructions
ZIP System Roof & Wall sheathing Is anode recognized sheathing and underlayment and Is approved for use with the following roof coverings:
Asphalt -fiberglass. Shingles
- Metal Roofs (shingles and panels)
- Clay Tile
Concrete Tie
- Slate. and Slate -type Shingles
Wood Shingles
- Wood Shakes
When Installing roof coverings, follow applicable codes and manufacturer's suggested instructions. Some roof coverings require a slip -sheet in addition to
conventional underlayment. Where. slip -sheets are required, they should be installed over ZIP System sheathing panels.
Note. Visit zipsystem.com for updates and installation details.
Asphalt -fiberglass: Shingles
Apply asphalt shingles directly to.ZIP System sheathing, For roofs with a slope of 2/12 or greater but less than 4/12, additional undedayment maybe required.
Install asphalt -fiberglass shingles according to applicable codes and manufacturer's installation instructions.
Metal Roof.Cogeirings
Metal roof coverings may be applied to ZIP System sheathing provided that the roof covering manufacturer's installation instructions and applicable
codes are followed.
Fasteners used to secure the.ZIP System Roof & Wall sheathing panels to supporting framing must be compatible with the specific.metal roof covering
used. Galvanized fasteners shall be used with galvanized roof coverings, aluminum -zinc coated fasteners shall be used with aluminum -Zinc coated 'roof
coverings and 300 series stainless steel fasteners shall be used with copper roofs. Stainless steel fasteners are acceptable with all metal roof types.
In addition, metal roof flashing shall also be made of a material compatible with the specific metal roof covering used. Apply metal shingles on roofs with
slopes of 3/12 or greater..
Clay and Concrete Tile Roof Coverings
ZIP System Roof & Wall sheathing Is intended to replace the first layer in a two -layer or multi -layer underlayment system. When installing clay or
concrete tile roof coverings, follow the installation recommendations of FRSA(rRI 07320. Install: tile roofs according to applicable codes and manufacturer's
installation instructions.
Slate and Slate -type Shingles .
Apply slate and slate -type shingles on roofs with slopes of 4/12 or greater. Install slate and slate -type shingles according to applicable codes and manufacturers
installation instructions.
Wood Shingles
ZIP System Roof & Wall sheathing is intended to replace the first layer of:underlayment required by the IBC and/or the IRC. Additional layers of underlayment
may be required by code depending on the local climate. Apply wood shingles on roofs with slopes of 3/1.2 or greater. Install wood shingles according to
applicablecodes and manufacturer's installation instructions.
Wood Shakes
ZIP System Roof & Wall sheathing is intended to replace the first layer of underlayment required by the IBC and/or the IRC. Additional layers,of underlayment
may be required by code depending on the local climate. ZIP System roof sheathing is not to be construed as a replacement for Interlayment. Apply wood
shakes on roofs with slopes of 4/12 or greater. Install wood shakes according to applicable bodes and manufacturer's installation instructions.
ZIP System"' Roof &Wall Sheathing Installation Manual
ZiP System® Sheathing Installation on Walls
Overview: ZIP System Roof & Wall sheathing is composed of ZIP System panels and ZIP System seam sealing tape. ZIP System® Roof & Wall Sheathing
panels should be fully installed before the seam sealing tape is applied. The following installation steps are presented as a general outline of the installation
process. These are manufacturer installation recommendations —please visit zipsystem.com for a library of flashing and installation details. You are fully and
solely responsible for all safety requirements. Good construction and -safety practices should be followed at all times.
Step 1. Install ZIP .System Roof & Wall sheathing panels positioned
with the water -resistive barrier facing outside. The panels may
be Installed with the long side of the panel oriented either
horizontally or vertically to the framing members. Walls that are
designed to resist lateral shear forces and sheathed with wood
structural panels typically require solid framing or blocking behind
all panel edges. If oriented horizontally, block horizontal joints if
wall is designed for bracing or as a shear wail.
1/8" spacing_ between.square edges of all adjacent panels is
recommended in accordance with industry standards for wood
sheathing installation.
8' Panel ledges Panel Edges . 4Panel.. Edges
F f�
The unique edge pmfile:is
designed to accommodate
incremental panel
expansion and does not
require manual gapping
along the 8' edges.'
Step 2. Fasten the panels to the framing members -with code approved
fasteners. Space fasteners 6".o.c. along supported edges and 12"
o.o. at intermediate supports, unless. otherwise specified by local
code or the designer of record. It is the responsibility of the general
contractor to verify proper fastener'type and spacing prior to
installation. Apply'the fasteners 3/8° from the ends and corners.
An ideal installation would be where fastener heads are'flush with
the panel surface. However, due to variations in materials and
limitations on equipment, this may be difficult to achieve in some
situations.. It is not required to tape over overdriven fasteners
unless the fastener head creates a hole through the entire panel
thickness. Please see the technical tip "Overdriven Fasteners in
Zip System Roof and Wall Sheathing," on zipsystem.com for
more information.
118"
�I
� t
Maintain 1/8" space where
8' panel edges meet V
panel edges. Unique edge
profile does not provide
the fulf 1/8" recommended
space in this situation.'
1!8"
�I
4 � y
t t
Maintain 1/8" space
where 4' edges meet
Unique edge profile is on
8' edges only,*
----_ 07 -:
ZIP System" Tape Installation - Wall Panel Seams
Apply ZIP System tape after all ZIP System Roof & Wallsheathing panels are fully fastened to wall -framing members. Only ZIP System tape should be used
to seal the seams of ZIP System panels. Ensure that the panel surface is dry and free of sawdust and dirt prior to taping. ZIP System tape is a contact
tape that requires pressure for an adequate seat.
Step 1. Tape all seams using ZIP System tape. Ensure that the tape
Is centered over the seam within +/- 1/2° to provide adequate
coverage and that wrinkles in tape are minimal.
Use the ZIP System tape gun: or roller to apply pressure to the tape
and smooth out any wrinkles.
Step 2. Wherever tape splices occur at a horizontal or vertical seam, create
an overlapping splice of at least 3
At T-joints, the tape pieces should overlap by at least 1". Apply
moderate pressure onto the surface of the tape to ensure a secure
bond between the panel and the tape.
Use the ZIP System tape gun or roller to apply pressure to the tape
and smooth out any wrinkles.
Take special. care to remove any voids and/or trapped air at splice
areas and T-joints.
Step 3. Tape inside and outside comer seams.
cam
Note: Tape over any areas of the panel or tape that are damaged during construction.
ZIP System° Roof & Wall Sheathing Installation.Manual
ZIP S Y stem -window Installation. DISCLAIMER: The following steps represent a general overview for the proper installation ofwindow flashing. Please deferto/cormit
the installation Instructions of your window manufacturer as well as code requirements in,your lurisdiction for ful installation details.
Flanged Windows
1. Fasten the ZIP System sheathing
to the wood frame and install
ZIP System tape to all wail panel
seams, as detailed in sections
02 and 03.
2. ZIP System tape may be used as pan flashing if
installed in accordance with flanged window
installation details posted on zipsystem.com.
Other adhesive -based flashing"tapes (must meet
ICC-ES Acceptance, Criteria for F ashing Materials
(AC148))may be used as pan flashing if installed
per ASTM 2112-07. Apply the flashing to cover
the bottom of the opening, overhanging onto the
sheathing by at least 2" and extending a minimum
of 6" up each jamb.
3. Apply sealant around inside face of mounting 621
flange. Sealant must be gapped at the sill
to permit drainage. Install and level: window per'
manufacturer's installation instructions. Verify
sealant compatibility with window manufacturer.
When using ZIP System tape as pan flashing,
butyl, 1000% silicone or polyurethane sealants
are acceptable. Do not use latex or other water -
based sealants.
4. Cut two pieces of ZIP System tape or another
adhesive -backed flashing tape (must meet ICC-
ES Acceptance Criteria for Flashing Materials
(AC148)) and apply to each of the window jamb
. flanges-ensuring_the_jamb_flashings_ovedap--the
sill flashing.
Once the tape is in place, use the tape gun or roller
to seal the flashing to the sheathing.
5. ;Cut a length of ZIP System tape or another
adhesive -backed flashing tape (must meet ICC-
ES Acceptance Criteria for Flashing Materials
(AC148)) and apply to the header, .ensuring that
the flashing overlaps the jamb flashings.•
Once the tape is in place, use the tape gun or roller
to seal the flashing to the sheathing.
TO NOT tape bottom flange.
6. From the interior, apply low-pressure polyurethane
foam (for windows) between the rough opening
and the window frame. (Caulk sealant compatible '
with the sill flashing may be used at the sill if the
opening between. the sill, flashing and window
is too narrow to allow the use of low-pressure
x
polyurethane foam.)
When using ZIP System tape, butyl, 100 o
silicone or polyurethanesealants are. acceptable.
Do not use latex sealants with ZIP System tape. If
using another flashing tape, follow the flashing
manufacturer's recommendation in selecting a
sealant compatible with.that flashing.
Bride Mould Windows
1. Fasten the.ZI P System sheathing
to the wood frame and install
ZIP System tape to all wall panel
seams, as detailed in sections
.02 and 03.
2. If recommended by the window
manufacturer, cut a strip of wood
to function as a back dam at the
sill. The wood strip should have
rough opening and a height and I
width of at least 112". Position the
block at the inside edge of the
window frame.
ZIP System - Window Installation
Brick Mould Windows (continued)
3. ZIP System tape may be used as pan flashing if
installed in accordance with brick mould -window
installation details posted on Apsystem.com.
Other adhesive -based flashing tapes (must meet
ICC-ES Acceptance Criteria for Flashing Materials
(AC148)) may be used as pan flashing, if installed
per ASTM 2112-07, Apply the flashing to cover
the bottom of the opening; overhanging onto the
sheathing by at least 2" and extending•a minimum
of 6" up each jamb.
4. ForveirGcal jambs, cut ZIP System tape or another
adhesive -backed flashing tape (must meet [CC -
ES Acceptance Criteria for Flashing Materials
(AC148)) and apply to each of the window jambs.
Ensure that they cover the entire Inside of the rough
opening as well as overlap onto the sheathing by
at least 2". Flashing shall also extend above the
roughopening, such that it will project 1" beyond
the exterior trim of the window.
Once the tape is in place, use the tape gun or roller
to seal the flashing to the sheathing.
5. Apply sealant to jambs and header allowing for
drainage at the sill in accordance with window
manufacturer's installation instructions. When
using ZIP System tape, use a butyl, polyurethane
or 100% silicone sealant. Do not use .latex or
other water -based sealants .with ZIP System
tape. When using another, flashing tape, follow the
flashing manufac4urer's recommendations in
selecting a sealant compatible with that flashing.
6. Install and.level window per manufacturer's
installation instructions.
DISCLAIMER: The following steps represent ageneral overview for the proper installation of window flashing. Please defer tolconsult
the installation instructions of your window manufacturer as well as code requirements in yourlurisd otion for full Installation deals.
7. Cut a piece of rigid head flashing so that when
installed, it flush with the edges of the exterior
moulding of the window. Apply a bead'of sealant
to the back and bottom surface of the rigid
head flashing. Use sealant recommended by the
flashing manufacturer,
8. 'Secure the rigid head flashing .to ZIP System
wall sheathing.
9. Cut a length of ZIP System tape oranother
adhesive-backed.fiashing tape (must meet ICC-ES
Acceptance Criteria for Flashing Materials (AC148))
and apply to the rigid head flashing, ensuring
that the adhesive -backed flashing overlaps the
jamb (lashings.
Once the tape is in place, use the tape gun or roller
to seal the flashing to the sheathing.
10..From the interior, apply low-pressure polyurethane
foam (for windows) between the rough opening and
h
the window frame. (Caulk sealant compatible with
r
the sill flashing may be used at the sill 0 the opening
a
between the sill flashing and window is too narrow
r' a
to allow the use of low-pressure polyurethane foam)
N
+
When* using ZIP System tape, butyl, 100% silicone
`
or polyurethane sealants are acceptable. Do not
use latex or. other water -based sealants with ZIP
System tape. If using another flashing tape, follow
the flashing manufacturer's recommendation in
selecting a sealant compatible with that flashing.
ZIP System°'Roof & Wall Sheathing Installation Manual
ZIP System - Penetration Openings DLSCLAIMER The following steps represent's general overview for the proper installation of penetration flashing. Please defer tolconsult
your code recldrements in ycuriurisdicticn for full installation details.
WALL ASSEMBLY
'UPSYSTEM& WALLSHEATHING
WOOOORLT.OA.AETI1L STll0.1
OVERLAPTAPEA MINIMUMOP
UNCHATALLTJODRS
INSTALLzP SYSTEM& TAPE AT ALL
INTER.IORCORNERS
WALL ASSEMBLY
ZIP SYSTEM® WALL SHEATHING
WOOD OR LT, GA. METAL STUDS
WALLAGDCMDLY'
W SYSTEM& WALL SHEATHNG
WDOD OR LT. GA METAL STUDS
116IN.H GAP RECOMMENDED AT
PANEL EDGES UNLESS
FASTEN ZIP SYSTENW WALL
SHEATHNOASRECULRE'W
DESIONW-OtWECORC LR LOCAL
BUILDING CODE
WALLASSEMBLY'
ZIP SYSTEMS WALL SHEATHING
WOOD OR LT. GA. .MEI AL STUDS
1184NCH GAP RECOMMENDED AT 1/8-INCH GAP RECOMMENDED AT
PANELEDGES UNLESS I PANEL EDGES UNLESS
OTHERWISE PROVIDED RY OTHER141SE:PROVIDED BY
MACHINED PROFILED EDGES MACHINED PROFILED EDGES —
ZIP SYSTEM® TAPE pNSTALLED
OVER ALLJOINTSIN ZIP SYSTEMS
WALL SHEATHING),
OVERLAP TAPE A MINIMUM OF
1-INCH AT ALLTJOINTS
USE FLANGED ELECTRICAL
BOXES OR MEMBRANE FLASHING
TOPROVIDE.FLANGES FOR
ELECTRICAL BOXES
1
INSTALL ZIP SYSTEMS TAPE OR
ADHESIVE BACKED FLASHING (MUST
MEETAC14e) IN SEQUENCE FROM
BOTTOM. SIDES. THEN TOP TO
ENSURE SHINGLE LAP OF ADHESIVE
BACKED FLASHING
ZIP SYSTEMSTAPE (INSTALLED
OVERALL JOINTS IN ZIP SYSTEMS
WALL SHEATHING).
OVERLAP TAPE MINIMUM OF
1-INCH AT ALL T-JOINTS
-USE .FLANGEO VENT HO.ODS__
s
ZIP System Sheathing Installation Details on Walls - visit zipsystem.com for more details.
WALLASSEMBLY . -
VINYLANOOD/FIBER CEMENT SIDING
(INSTALLED IN ACCORDANCE WITH
CLADDING MANUFACTURER'S
INSTALLATION RECOMMENDATIONS)
ZIP SYSTEM® WALL SHEATHING
WOOD OR LT. GA: METAL STUDS
TOP EDGE OF FLASHING TAPED TO
WALL SHEATHING WITH. ZIP. SYSTEM®
TAPE O,R.ADHESIVE BACKED
FLASHING. (MUST MEET AC148) —
CODE APPROVED FLASHING—
WALLASSEMBLY
YINYl/N100LVFl BER CEMENT SIDING
DNSTALLEDIN ACCORDANCE R1TH
CLADDINGMIWUFACTURUM
INSTALLATION RECOMMENDATIONS)
ZIP SYSTEMOWALLSHEATHING
WOOD OR LT. GAL METAL STUDS
VS -INCH GAP RECOMMENDED AT
PANEL EDGES UMESS
DTHFRYOSF PROVIDED RY
MACHINED PROFAED EDGES
ZIP SYSTEMOTAPE'(INLSTALLED
OVERALL JOINTS IN ZIP SYSTEM®
WALL SHEATHING). -
OVERLAP TAPE A. MINIMUM OF
I-INCHATALLTJOINTS
118•INCH GAP RECOMMENDED AT
PANELEDGESUNLESS
OTHERWISE PROVIDED BY
MACHINEO.PRORLED EUOES
FASTENMP SYSTEMSIWN.L.
SHEATMNG AS REOUIREO BY
DESI,GNEROF,RECORDDRLOCAL .. _....... .. ....._ _. ...-_ . ...., _._. _._ .. ..... . _ _. .
BUILDING CODE
WALL ASSEMBLY
BRICK VENEER
AIR $PACE.(AS PRESCRIBED BY
LOCAL BUILDING CODE)
ZIP•SYSTEM® WALL SHEATHING
WOOD OR Lt. GA. METAL STUDS
TOP EDGE OF FLASHING TAPED
W ITH.ZIP SYSTEM® TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEETAC148)
CODEAPPROVED BASE
FLASHING
WEEP HOLES (AS PRESCRIBED
BY LOCAL BUILDING CODE)
i
WALL ASSEMBLY
BRICKVENEER
AIR SPACE,IAS PRESCRIBED BY
LOCAL BUILDING CODER
ZIP SYSTEMS) WALL SHEATHING
WOOD OR LT. OA. METAL STUDS
104NCH GAP,RECOMMENDED AT
PANEL EDGES UNLESS
OTHERWISEPROVIDEDBY
MACHINED PROFILED EDGES
ZIP SYSTEM® TAPE (INSTALLED
OVER ALLJ61NTS IN OF SYSTEMS
WALL SHEATHING). -
. (B/ERLAP TAPE A MWIMUMOF
1•INCHATALLYJOINTS
1AlINCH GAP RECOMMENDEDAT
PANEL EDGES UNLESS
OTHERWISEPROVIDEDBY
'MACHINEDPROFILED EDGES
FASTEN ZIP SYSTEM& WALL
SHFATHIN6 AS REQUIRED BY
11
Note: For optimal air leakage reduction; all untaped edges of the panels can be caulked, gasketed or seated with a weather stripping material.
ZIP System° Roof & Wall Sheathing Installation .Manual
WALL BEYOND
BACKDAM PER WINDOW
MANUFACTURER'S INSTALLATION
RECOMMENDATIONS
INSTALL CODE -RECOGNIZED
SILUPAN FLASHING IN ROUGH
OPENING PRIOR TO WINDOW
INSTALLATION.
TOP EDGE OF FLASHING TAPED
WITH ZIP SYSTEM®TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEET AC148)
WEEPS (AS PRESCRIBED BY
LOCAL BUILDING CODE)
CODE APPROVED FLASHING
WALL ASSEMBLY
BRICK VENEER
AIRSPACE (AS PRESCRIBED BY
LOCAL BUILDING CODE)
ZIP SYSTEM® WALL SHEATHING
WOOD OR LT. GA. METAL. STUDS
12
ZIP System Sheathing Installation Details on Walls (continued)
WALL ASSEMBLY
BRICK VENEER
AIR SPACE (AS PRESCRIBED BY
LOCAL BUILDING CODE)
ZIP SYSTEM@ WALL SHEATHING
WOOD OR LT. GA. METAL STUDS
TOP EDGE OF FLASHING TAPED
WITH ZIP SYSTEM® TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEET AC148)
CODE APPROVED FLASHING. —
WEEPS (AS PRESCRIBED BY
LOCAL BUILDING CODE)
STEEL LINTEL
INSTALL WINDOW IN
ACCORDANCE WITH DETAILS
24A-2413 OR 25A-25D
WALL BEYOND
WALL.ASSEMBLY
CODE APPROVED FLASHING
Note: For optimal air leakage reduction, all untaped edges of the,panels can be caulked, gasketed or sealed with a weather stripping material.
ZIP SYSTEMO SHEATHING WITH HARD COAT STUCCO AT H-2'
BLOCKFOUNDATIONWALL-OPTIONA
TRADITIONAL HARD -COAT STUCCO
INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S OR THE PORTLAND
CEMENT ASSC. (PCA)
RECOMMENDATIONS WITH THE MOST
RESTRICTIVE CONTROLL-ING.
i
CODE -APPROVED Q
WEEP SCREED AT
BASE OF WALL
VERTICAL AND HORIZONTAL
CONTROL JOINTS AS NEEDED.
DESIGNER -OF -RECORD TO
SPECIFY TYPE AND LOCATION.
MASONRY BLOCK WALL
-ZIP SYSTEMO SHEATHING IS APPROVED TO REPLACE ONLY THE
FIRST LAYER OF A TWO -LAYER UNDERLAYMENT SYSTEM.
Sales Office:10925 David Taylor Drive
Suite 300 - Charlotte, NC 28262
SHEATHING & TAPE Telephone: 800.933.9220 - www,zipsystem.com
se construction details are provided to assist in the installation of
LATH
ONE LAYER OF WATER -RESISTIVE
VAPOR -PERMEABLE BARRIER
WITH A PERFORMANCE AT LEAST
EQUIVALENT TO GRADE D
BUILDING PAPER.
ZIP SYSTEM® SHEATHING*
TOP EDGE OF WEEP SCREED
TAPED TO WALL SHEATHING
WITH 21P SYSTEM®TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEET AAMA 711 OR
AC148)
WOOD OR LT. GA.
METAL STUDS
ADHESIVE BACKED MEMBRANE
BRIDGE FLASHING CENTERED
OVER TRANSITION JOINT (ZIP
SYSTEM TAPE MAY BE USED AS
THE BRIDGE FLASHING)
DRAWING NOT TO SCALE
Lem ENGINEERED
WOODS
may not apply to
every situation. Manutacturer accepts no responsibility or liability for the use of these or other construction details'..
ZIP SYSTEM® SHEATHING WITH HARD COAT STUCCO AT
BLOCK FOUNDATION WALL- OPTION A
H-2
WALL ASSEMBLY
TRADITIONAL HARD -COAT STUCCO
METALLATH ;.
ONE LAYER WATER-RES. BARRIER
ZIP SYSTEM@ SHEATHING'
WOOD OR LT. GA. METAL STUDS
TOP EDGE OF WEEP SCREED
TAPED TO WALL SHEATHING
WITH ZIP SYSTEM@ TAPE OR
ADHESIVE BACKED FLASHING,
(MUST MEET AAMA 711 OR
AC148)
L'
CODE-APPROVED WEEP
SCREED AT BASE OF NlALL
ADHESIVE BACKED MEMBRANE
BRIDGE FLASHING CENTERED OVER
TRANSITION JOINT (ZIP SYSTEM
TAPE MAY BE USED AS THE BRIDGE 1
FLASHING)
MASONRY BLOCK WALL +�
LATH
TOP EDGE OF WEEP SCREED TAPED
TO WALL SHEATHING WITH ZIP
SYSTEM® TAPE OR ADHESIVE BACKED
FLASHING. (MUST MEET AAMA 711 OR
AC148)
TRADITIONAL HARD -COAT STUCCO
INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S OR THE PORTLAND
CEMENT ASSC. (PCA)
RECOMMENDATIONS WITH THE MOST
RESTRICTIVE CONTROLLLING.
ONE LAYER OF WATER -RESISTIVE
VAPOR -PERMEABLE BARRIER WITH A
PERFORMANCE AT LEAST EQUIVALENT
TO GRADE D BUILDING PAPER.
CODE -APPROVED WEEP
SCREED AT BASE OF WALL
ADHESIVE BACKED MEMBRANE
BRIDGE FLASHING CENTERED OVER
TRANSITION JOINT (ZIP SYSTEM
TAPE MAY BE USED AS THE BRIDGE
FLASHING)
MASONRY BLOCK WALL
j
'ZIP SYSTEM@ SHEATHING IS APPROVED TO REPLACE ONLY THE FIRST LAYER OF A TWO -LAYER UNDERLAYMENTSI gNgT TO SCALE
in -
o+ Sales Office: David Taylor Drive
.�lpsy den IEEE(*
ENGINEEREDSuite 300 - Chariotte NC 28262
o SHEATHING & TAPE Telephone: 800.933.9220 - www.zipsystem.com WOODS
These construction details are provided to assist in the installation of ZIP System® products) and may not apply to
every situation. Manufacturer accepts no responsibility or liability for the use of these or other construction details.