Loading...
HomeMy WebLinkAboutFBC ENERGY CONSERVATION 1-3-19Planning & Development Services Rt �FIVFO Building & Code Regulation Division f 2300 Virginia Ave, Rm 201 AN ®` ?01 v - - Fort Pierce, FL 34982 permitti `� ` o 772462-2165 Fax 772-462-6443 St; Cq a int FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: %& 9 Permit #: S L C Lot #: Contractor: _T�P6r� J Address: 3� 1 Ci Q P c r Construction: 'Post Construction Test ❑ Rough -in Test Test Conditions: Date: 3 Floor Area (ft2): Time: '1' SJ>�N� Primary Location of Supply Ductwork Indoor Temperature (F): Primary Location of Return Ductwork Outdoor Temperature (F): Total Leakage Test (Outside) Duct Leakage: ❑ Default ❑ Prop. Leak Free KProposed On = i Test Pressure: IS (Pa) Baseline Duct Pressure (optional) (Pa) = v Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: g(Pass ❑ Fail Installed (Pal I Z Total Leakage (cfm): Total Leakage per 100 sgft: CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sqft. Testing Company Company Name: Address: I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with Section R40 .2. Signature: 5059109 Printed Name: License/Certificate #: -t'