HomeMy WebLinkAboutFBC ENERGY CONSERVATION 1-3-19Planning & Development Services Rt �FIVFO
Building & Code Regulation Division f
2300 Virginia Ave, Rm 201 AN ®` ?01
v - - Fort Pierce, FL 34982 permitti `�
` o 772462-2165 Fax 772-462-6443 St; Cq a int
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: %& 9 Permit #: S L C Lot #:
Contractor: _T�P6r� J Address: 3� 1 Ci Q P c r
Construction: 'Post Construction Test ❑ Rough -in Test
Test Conditions:
Date: 3 Floor Area (ft2):
Time: '1' SJ>�N� Primary Location of Supply Ductwork
Indoor Temperature (F): Primary Location of Return Ductwork
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free KProposed On = i
Test Pressure: IS (Pa)
Baseline Duct Pressure (optional) (Pa) = v
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: g(Pass ❑ Fail
Installed (Pal I
Z Total Leakage (cfm):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sqft.
Testing Company
Company Name: Address:
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with
Section R40 .2.
Signature:
5059109
Printed Name: License/Certificate #: -t'