HomeMy WebLinkAboutFIELD DENSITY TESTe �a F
RECEIVED
& TESTING INC.
250 SW 13th Ave Pompano Beach, FL 33069 J U L 2 4, 12018
.
Field Density Tests 01 Q,9rmaq% tt$9#Ai
D-6938
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
www.fed-eng.com
__ Project: __ Proposed Residence I Lot 9; Creeksi a Date: July 12, 2018
Address: 3134 Tidewater Circle, Fort Pierce, FL Order #: 18DR634
Area Tested: Building Pad Permit #: 17/Z—O
Material Type: Light Yellowish Brown Sand with Traces of Shell. Tech: TS
Client: D.R. Horton, Inc.
Address: 1430_.Culver.Drive NE Compaction Req
Palm Bay, -FL 32907
95%
Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NE Corner of Building Pad
12"
FL
9.8
108.2
112.5
11.0
96.2% .
Yes
2
Center of Building Pad
12"
FL
6.9
109.7
112.5
11.0
97.5%
Yes
3
SW Corner of Building Pad
12"
FL
11.0
108.3
112.5
11.0
96.3%
Yes
4
5
6
7
8
9
10
11
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test.only on the top 12" of the
Legend for Elevation:
PR = Proofroll 1,2,3 = 1 st, 2nd, 3rd Lift
)ad and is nova verification of Soil
Submitted by:
W�
SL = Springline FL = Final Lift Keith LeBlanc,-P.E.
SG = Subgrade BG = Below Grade Federal Engineering & Testing, Inc.
BC = Basecourse BOF = Bottom of Footing �PPR
V
FloridwReg. No. 59394
TOP = Top of Pipe FG = Finished Grade i Certificate of Authorization #5471
As amutual,protection to clients, the public and ourselves, all reports are submittedas e iLoperty of clients, --and authorization for publication o`-,statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the';degr, a of compaction of the tosted.fa;er of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil rnafkWs bAwkhe proposed gii6die. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the urid9/1yi"i3 ,oils -will sunpsrtthe,.proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be perforhi dao e�aluaie the sui,sliility of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this tvOri't.
PAGE 1 of 2
Com
Pursuant to your request, Federal E
project on the reverse side. The -pr
material only. In no way shall a con
performed ,by the -client prior to cons
12" of added"fill material: FET was)
added fill material does not include a
the proposed structure without settle
conditions below the tested top 12 in
structure, we recommend performing
soil conditions.
d Soils Method D-6938 Disclaimer
ineering &-Testing, Inc. (FET) has performed a compaction test at the referenced
)se of our test was to determine the degree of compaction of the tested layer of
ction test replace a soil bearing capacity determination. A soil boring test must be
,tion to verify subsoil conditions. Our scope of services only included testing the top
contracted to perform supervision of the building pad preparation. This testing of the
inalysis of the underlying soil materials to determine if they are capable of supporting
nt. This density compaction test does not warranty any underlying soil materials or
m of material. If no soil borings have been performed in the location of the proposed
it borings below all foundation areas of the proposed structure to verify the underlying
Environmental analysis of the soil rrf aterials is not part of the scope of services. If environmental analysis of the soils is
required,--we-can provide a proposal for performing an environmental analysis of the soil materials. The .scope of services is
for determineition_,of the'degree. of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not. abailable at the time the work was performed. Determination of the pass/fail compaction
results are based on current- common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 sta , dard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations,
overgrown, vegetation, traffic and of er disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, thie-public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts' from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look -forward to doing so in the near future.
Page 2 of 2
RECEIVEQ Phone 954-784-2941
J U L 1$ 2018 800-848-1919
edera.1- Fax 954.784-7875
L 48 TESTING mc. $TD woe county, Permitting www.fed-eng.com
250 SW 13th Ave Pompano Beach, FL 33069
Field Density.Tests of .Compacted Solis Method D-6938
Project: Proposed Residence Lot 9, Creekside Date: July 12, 2018
Address: 3134 Tidewater Circle, Fort Pierce, FL Order #: 18DR634
Area Tested: Building Pad Permit #:��
Material Type: Light Yellowish Brown Sand with Traces of Shell Tech: TS
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.:
Palm Bay, FL 32907 Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth,
-Elev.
Moist
'�o
Dry
Density
PCF
Proctor
Value,
PCF ,
Optimum
Moisture
%
Compaction
. Pass
1
NE Comer of Building Pad
12"
FL
9.8
108.2
112.5
11.0
96.2%
Yes
2
Center of Building Pad
12"
FL
6.9
109.7
112.5
11.0
97.5%
Yes
3
SW Corner of Buildin "Pad
12"
FL
11.0
108,3
112.5
11.0
96.3%
Yes
4
5
6
7
8
9
10
11
12
13
14
���®®1CF!!V.
f �7�✓
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer �``'��• COG E�'��� ��/%
This is a Com action Test onlyon the to 12" of the ad and is not a verification of Soil ft arj .
Legend for Elevation: a
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: r ;
SL = Springiine FL = Final Lift Keith LeBlanc, P.R ;� STATES ,yg
SG = Subgrade BG = Below Grade Federal Engineering,84etJIn��l® t� �� �4\
BC = Basecourse BOF = Bottom of: Footing Florida Reg. No: 593&' �r R
TOP = Top of Pipe FG = Finished Grade Certificate of Authorize ildliu, AL`��v��
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential:property, of clients, and authorization forUbP"igq 41�,�it ;;nt%
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the=tested layer of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring lest is required to certify that the underlying soils will support the proposed structure
without settlement if no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2