HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODE 12-17-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
�ti�i jA _-• Fort Pierce, FL 34982
0 772-462-2165 Fax 772-462-6443
J. FBC ENERGY CONSERVATION CODE
Date: "
Contractor: D.R. Horton
Construction: ❑ Post Construction Test
Duct Sealing Certification
Prescriptive and Performance Metthhoodd" (�
Permit #: 1 �L2_- 66 CJ�^ .Lot
Address: &J^J
❑ Rough -in Test
Test Conditions: Date: 44"" % % �� Floor Area (ft2): 1i
6�2 2
Time: If jD Primary Location of Supply Ductwork Bedrooms
Indoor Temperature (F): Primary Location of Return Ductwork Hallways
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: ❑ Default op. Leak Free ❑ Pr posed On =
Test Pressure: 25 (Pa) - (',!/� sp-PA
Baseline Duct Pressure (optional) NSA (Pa) 1.17
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ass ❑ Fail
Installed Pa -zs 74 25 Total Leakage (cfm):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
I - ' 0Z--V
Testina Comoan
Company Name: GFA International, 772-924-3575 Address: 607 NW Commodity Cove, Port St. Lucie FI
I hereby certify that the a ve nct-5eali g Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: _ Michael Anderson License/Certificate #: BPI 6059963