HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEs-
Planning & Development Services
Building;& Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
/Request for 30-Day Temporary Power Release
Date: 0 ll , s� Permit Number:
Project Address: (�/ 1lP �¢b66
RECEIVED
JUN 0 4 7010
Permitting DePartment
St. Lucie County
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
I. This temporary power release is requested for the above stated purpose only, and there will be no
occupancy of any type, other than that permitted by construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement,
including Building Division Policy, which is Incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day
Power for Testing" have been fulfilled and the premise Is ready for compliance inspection.
4. All requests for an extension beyond 30 days must be made In writing to the Building Official statingd if
the reason for the request. Power may be removed from the site and/or a Stop Work Order issue the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to the Stop Work Order.lift
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
iry i KACTOR SIGNATURE
CONTRACTOR SIGNATURE
DATE
DATE
DATE
St Lucie County
Building and Zoning Department
Requirements for 30 Day Power for Testing
I• Form entitled "Request forl30-Day Temporary Power Release" must be fully executed and posted in
the Building Department record files prior to inspection.
[I. Inspection Requirements: I
1. Address numbers shall ble posted per county Ord. No. 7.05.09.
2. All entrances, exits, windows and garage doors must be lockable.
3. All circuits on exterior shall be terminated in a box with weatherproof cover. The same applies
to a disconnect. If circuits are at or above 7'6" from grade they may be capped with wire nuts
and taped.
4. All breakers must be insta led. Any blank space must be closed by a breaker or approved filler
plates. I
5. Interior Wiring. All receptacles, light fixtures and fans must be trimmed. Any fixture below
7'6" from the floor or mezzanine that is not available at the time of inspection must have an
Inviso plate installed. Fixtu es at or above that height may be capped with wire nuts and taped.
6. All smoke detectors must be installed.
7. Kitchen cabinets must be ins ailed; any exception for special conditions or circumstances must
have an approval prior to schelduled inspection.
8. Sewer and water connections must be complete. Only well pumps are excluded from this
requirement.
9. Exterior construction must be omplete and weather tight, including stucco, siding, roof and
soffit. I
10. Permit work shall be substantially completed except for back orders, paint on exterior carpet
and/or floor covering, pumps, air conditioners and driveway. ' "�