Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST 5-2-18I edeval & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 RECEIVED Phone 954-784-2941 MAY 0 800-848-1919 Fax "954-784-7875 ST: Lucie Couff-Y,, R�►'rsil ting www•fed-eng.com Field Density Tests of Compacted Soils Method D-6938 Project: Proposed- Residence Lot 129, Creekside 'Date: April 18, 2018 Address: 8424 Cobblestone Drive, Fort Pierce, FL Order #: 18DR312 Area Tested: Building Pad Permit Material Type: Light Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 - Test # TEST LOCATION' Probe Depth Elev. Moist % ; Dry Density PCF Proctor Value. PCF Optimum Moisture /o Compaction Pass 1 Center of Building Pad 12" FL 6.1 104.3 106.0 12.0 98.4% Yes 2 SE Corner of Buildin Pad 12" FL ..6.0 104.8 106.0 12.0 98.9% Yes 3 NW Corner of Building Pad 12" FL 6.9 105.0' 106.0 12.0 99.1 % Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil earl Capacity. Legend for Elevation: ' ` • ' /��/'� PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: L SL = Springline FL = Final Lift Keith LeBlanc, P:E:: �/?Xlr re SG = Subgrade BG = Below Grade "Federal f=ngineering-& Testing, Inc.fBC = Basecourse BOP = Bottom of Footing = Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade Certifibate-of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A den'slty.test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify thp'underlying soil material below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required 15 certify that the-underlving soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 pacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on :the reverse side. The purpose of our test was to determine the' degree of compaction of the tested layer of material only. In no way shall a compaction test replace.a soil bearing capacity determination. A soil. boring test must be performed by the client. prior to construction to verify subsoil conditions: Our scope of services only included testing the top 12" of added fill material. FET ways not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the- proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 1�, inches of material. If no soil- borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. = Environmental analysis. of the' soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can .provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of icompaction of the tested layer of material only: No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 950/q of the ASTM .D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and, parking -lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the areas or dates. Any subsequ, overgrown, vegetation, traffic to construction. As a mutual protection to i and authorization for use, pending written approval. It has been a pleasure working e and areas of our site work and should not be relied upon to represent conditions on other site disturbances due 'to ,water erosion, rain waters, construction activities, excavations, other disturbances will void this test and the site must be re -compacted and re -tested prior the public and ourselves; all reports are submitted are the confidential property of clients ation of statements, conclusions or extracts from or regarding our reports is reserved, you and we look forward to doing so in the near future. Y r• - � r"f/ •+✓'.� I1 `�-� Sri i't� �. Page 2 of 2