HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODE 9-4-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
G l� Prescriptive and Performance Method
Date: 7 / g Permit #: / / 12 0 4 .-1 Lot M ) -311
_
Contractor: J��. O� I"e✓1 Address: �i I (JL'Ps�ohe _b r F` - Pf PICP r / 3'{?L15
Construction: 1�t Post Construction Test ❑ Rough -in Test
Test Conditions: 9 i/y
Date: / Floor Area (ft2): i 28
Time: /2.'3o ?V7 Primary Location of Supply Ductwork 4'4—'f7c
Indoor Temperature (F): Primary Location of Return Ductwork /-) f-f;(.
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free xProposed On = 01Y
Test Pressure: 25 (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Pass ❑ Fail
Installed Pa
Total Leakage (cfm):
Total Leakage per 100 sgft: • c% /D
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
Testing Company �/ \\
�i / ,, �! %� ��SPn / sy,U�tce b jv
CompanyN B�PG Address: �acicso,vi (1e r 1 �2 2 �S
above Duct Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
rr'eS )12 c�Y g�jW � W
Printed N e: �Gi License/Certificate #: