Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTT- RECI Phone 954-784-2941 ede ` 800-848-1919 WAY 2. 5 2010 Fax 954-784-7875 �^a & TESTING INC. Permitting Department �w.fed-eng.corn 250 SIN 13th Ave Pompano Beach, FL 33069 St. Lucie Cnunty Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 131, Creekside Date: May 7, 2018 Address: 8416 Cobblestone Drive, Fort Pierce, FL Order #: 18DR378 Area Tested: Building Pad Permit #: /7/Z — 06 S/ Material Type: Brownish Orange Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 13.9 105.8 106.7 13.9 99.2% Yes 2 SW Corner of Building Pad 12" FL 13.0 105.1 106.7 13.9 98.5% Yes 3 NE Corner of Building Pad 12" FL 11.1 106.2 106.7 13.9 99.5% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Sojl Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted,by: SL = Springline FL = Final Lift _ �Keith LeBlanc, P:c. `:; SG = Subgrade BG = Below Grade - Federal Engineering 4 Testing, Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade abilificate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authoriiation for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A dens!4i.bst determines_the•degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certif, ttie underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring testis required o-certiP; that the-ugd6�i`ying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil:borings,be•performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retest(nglmust be'performed on this work. PAGE 1 of 2 Compacted, Solis Method D-6938 Disclaimer Pursuant to your request, Federal Engineering .& Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purposelof our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compactiop test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materialslis not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction) of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 .c' Phone 954.784-2941 1919 ed-eral. 954-784-7875 Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 131h Ave Pompano Beach, FL 33069 Field Density Tests of Compacted. Soils Method D-6938 Project: Proposed. Residence Lot 131, Creekside Date: May 7, 2018 Address: 8416 Cobblestone Drive, Fort Pierce, FL Order #: 18DR378 Area Tested: Building Pad' Permit #: 1712,- 60-1 Material Type: Brownish Orange Sand with .Traces. of Shell Tech: BK Client: D.R. Horton; Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # . TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum 'Moisture % Compaction Pass 1 Center of Building Pad 12" FL 13.9. 105.8 106.7. 13.9 99.2% Yes 2 SW Corner of Building Pad 12" FL 13.0 105.1 106.7 13.9 98.5% Yes 3 NE Corner of Building Pad 12" FL 11.1 106.2 106:7 - 13.9 99.5% Yes 4 5 6 7 1 RECTT 8 9 10 S • Lu ,ie countcountY, F 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Informationfor Disclaimer This is a Compaction Test only on the top 12 of the pad and is not a'verification of Soil r Legend for Elevation:LU tr PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: J` e OF St. = Springline FL = Final Lift Keith LeBlanc, P.E p r1, . �,p��• SG = Subgradem BG =Below Grade Federal Engineering e .l�----- BC - Basecourse BOF = Bottom of Footing Florida Reg. No.'59394 ��� SJO(��� ,N TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #�°4'1► t V r t t•' ° 5'� As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a, soil bearing capacity"determination. These density tests do not certify the 'underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms; retesting must be performed.on this work. PAGE 1 of 2