Loading...
HomeMy WebLinkAboutINSTALLATION MANUALZIP System®Roof &Wall Sheathing „�ysfem "" -- LNS.TALLATI N--MANUAL_: _: - ROOF i`WAItSHEAYHINO` -, Contents 02 ZIP System® Sheathing Installation On Roofs 03 ZIP System— Tape Installation - Roof Panel Seams 04 ZIP System'" Tape Installation - Roof Panel Seams (continued) 05 Roof Covering Installation Instructions 06 ZIP System° Roof & Wall Sheathing Installation 07 ZIP System' Tape Installation - Panel Seams ATTENTION: This installation guide is intended to provide general Information for the designer and end user. The following guidelines will help you safely and properly install the ZIP System° Roof &Wall wall sheathing. We urge you, and anyone installing this product, to read theseguldelines:in order to minimize any risk of safety hazards and to prevent voiding any applicable warranties. This manual is a general installation guide and does not cover every installation condition. Proper Installation shall be deemed to mean the most restrictive requirement specified by Huber Engineered Woods (HEW), local building code, engineer or architect of record or other authority having jurisdiction. You are fully and solely responsible for all safety requirements and code compliance. For additional Informatlon.contact Huber Engineered Woods LLA ZIP.System® Roof & Wall SheathingSafety Guidelines - Follow all OSHA regulations and any other safety guidelines and safety practices during Installation and construction. - Use approved safety belts and/or harnesses orotherfall protection equipment. Install ZIP System.panels and tape only in dry conditions and on dry surfaces. Do not install in rain, snow, frost or other slippery conditions. - Wear rubber -sated or other high -traction footwear while installing ZIP System sheathing in a roof application. Do rat wear footwear with wom soles or heels. - Ensure the roofing surface Is free from oil, chemicals, sawdust, dirt, tools, electric cords, air hoses, clothing and anything else that might create a tripping hazard. - Install temporary toe boards along the ZIP System sheathing roof surface. What Is ZIP Systertt° Roof & Wall Sheathing? ZIP System Roof & Wall sheathing is code -recognized, as a wood structural panel, roofing underlayment (IMES ESR-1473), water -resistive barrier and air barrier (ICC-ES ESR-1474). ZIP System Roof & Wall sheathing has a built-in moisture barrier that lets you say good-bye to building paper or housewrap on the walls .and felt paper an the roof.' Simply install the panels, tape the seams, and you have a structural wall sheathing, water - resistive barrier and air barrier or a structural roof sheathing and roofing underlayment.ali from one product. FASTER. TIGHTER. ENERGY EFFICIENT. 08 ZIP System® Roof & Wall Sheathing - Window Installation Flanged Windows & Brick Mould Windows 09 ZIP System® Roof & Wall Sheathing - Window Installation Brick Mould Windows (continued) 10 ZIP System® Roof & Wall Sheathing - Penetration Openings 11 ZIP System® Roof & Wall Sheathing Installation Details 12 ZIP System® Roof & Wall Sheathing Installation Details (continued) ZIP System Roof & Wall sheathing can be used with a range of exterior claddings and roof coverings. Approved wall coverings include brick, vinyl, stone, wood fiber cement, wood and cedar shakes, traditional hard coat stucco and specified drainable EIFS applications, however it is not recommended for use with adhesively attached EIFS. Approved roof coverings include asphalt -fiberglass shingles, metal tiles and panels, day and concrete tiles, slate and slate -type shingles and. wood shakes and shingles. Follow all cladding and roof covering manufacturer's installation instructions. ZIP System Roof & Wall sheathing can be used on buildings of Type III (Roof Applications ONLY) and Type V construction and construction permitted under the IRC. ZIP Systeffi0 Roof& Wall Sheathing Includes: - ZIP System sheathing panels with built-in moisture barrier with preprinted fastening and tape guides ZIP System tape Storage and Handling - . Set panel stack on three supports (stickers) to keep off the ground. Outdoors, cover panels loosely with waterproof protective material. Anchor covers on top of the stack, but keep away from sides and bottom to assure good air circulation. In high moisture environments, cut banding on the panel stack to prevent edge damage. ZIP Systerrf Roof & Wall Sheathing Notes and Limitations: Do not use on roofs with slopes less than 2/12. Do not use abutted against general stone or masonry without providing a minimum of a 1/2" gap. Do not install ZIP System tape in temperatures less than 200 F - ZIP System products are not recommended for manufactured housing applications that are built under a federal building code administered by the U.S. Department of Housing and Urban Development (HUD). Do not use panel edge clips (H-Clips) with ZIP System Roof & Wall sheathing without expressed written approval from Huber Engineered Woods. — Do not use ZIP System tape to permanently seal around circular roof projections (plumbing vents, pipes, curved walls, etc.) Contents (continued) Wall Coverings ZIP System Roof & Wall sheathing should be covered with the finished roof covering or exterior cladding within 1 So days of installation. Finished roof and exterior cladding products should be installed per the manufacturer's installation Instructions. Per the recommendation of the Western Red Cedar -Lumber Association and the U.S. Forest Products Laboratory, wood siding should be primed before Installation. When original roofing or claddings are removed and replaced on existing ZIP System sheathing, the roof or wall should be covered with an additional roofing underlayment or water resistive barrier prior to installation of the new finished roofing or cladding. Note: in cladding systems requiring multiple layers of water -resistive barriers, like traditional hard -coat stucco, ZIP System sheathing is intended only to replace the first layer. Wet Blown Cellulose Insulation. - In addition to following manufacturer installation instructions, we recommend a maximum moisture content of the cellulose of less than 20/6 measured at the inside surface of the ZIP System panel before closing the wall cavity. Secondary Coatings Do not apply secondary coatings or treatments to ZIP System Roof & Wall sheathing panels with the exception of the following: HEW approved fire resistant coatings. Fire resistant coatings must be tested and approved by HEW for use with'ZIP System panels. Field applied water-soluble borate insecticide or fungicide treatments applied to the non overlay side of the. panel. See technical tip, "Termite Treatments on ZIP System Roof & Wall Sheathing," onzipsystem.com for more information. Permeable laminated radiant barrier foil or paint. For a radiant barrier foil or coating to be considered permeable, it must have an applied permeance of five perms or greater as tested by the ASTM E 96 wet cup standard. For a radiant foil, the permeance evaluation would include any adhesive and/or backer used to laminate a foil.. For a radiant paint/coating, the Permeahce evaluation should be conducted at the applied thickness of the paint/coating. ZIP System Root and Wall sheathing replaces only the first layer in mutimunderiayment systems. " Edge support is not required by code with 12 (32A6 span rated) and 5/6 (40)20 span rated) performance category sheathing if the framing does rat exceed 24' oc. and the total load does not exceed 93 psi for 112 and 156 psf for 5fa performance categories. This is based on U180 deflection criteria for total load. ZIP System° Roof & Wall Sheathing Installation Manual ZIP System® Sheathing Installation on Roofs Overview: ZIP System Roof & Wall sheathing is composed. of. ZIP System panels and ZIP System seam sealing tape. ZIP Systee Roof & Wall. Sheathing panels should be fully installed before the seam sealing tape is applied. In general, the ZIP System roof sheathing panels should be installed from the lowest point on the roof to the highest. It is at the discretion of the installer whether to apply tape from the top down or from the bottom up. However, working from the highest ' sections of the roof and working down will minimize foot. traffic on the tape. The following installation steps are presented as guidelines and a general outline of the installation process. These are manufacturer installation recommendations —please visit zipsystem.com for a library of flashing and installation details. You are fully and solely responsible for all safety requirements. Good construction ana safety Step 1. Ensure that the panel surface is dry and clean of any nails, sawdust, or other debris or protrusions prior to installing or walking on the panels. After ensuring compliance with all OSHA and local code safety guidelines, install -ZIP System sheathing panels with the moisture barrier surface facing outside. The long edge (8') should be oriented perpendicular to the framing members, and panels should be Installed With the 4' edge seams staggered a minimum of 24'. 1189 spacing betweensquare edges of all adjacent panels is recommended, in accordance with industry standards for wood sheathing. (Tongue & Groove panels are designed to self -space and do not require manual spacing on the 8' edges.) Step 2. , Ensure that ZIP System panels span at least three framing members and a framing member supports the entire 4' edge of the panels. Fasten the ZIP System Roof & Wall sheathing panel to the framing members with -code approved fasteners spaced at the appropriate edge and intermediate spacing.. It is the responsibility of the general contractor to verify proper fastener type and spacing prior to installation. Apply the fasteners 3/8" from the panel ends and comers. An ideal installation would be where fastener heads are flush with the panel surface. However, due to variations in materials and limitations on equipment, this may be difficult to achieve in some situations. It is not required to tape over overdriven fasteners unless the fastener head creates a hole through the entire panel thickness. Please see the technical tip, "Overdriven Fasteners in ZIP System Roof and Wall Sheathing," for more information. Step 3. Install temporary toe boards as necessary when applying the ZIP System sheathing panels up the slope of the roof planes. . snows ue wuuweu uL aJI U[IJWQ. 8' Panel Edges t�s• x z;; The.unique edgeprofile is designed to accommodate incremental panel expansion and;does not require manual gapping along the 8' edges. 4' Panel Edges va• 1: v ,f Maintain 118• space where 4' edges.meet: Unique edge profile is'on 8' edges only. ZIP System"m Tape Installation - Roof Panel Seams Apply ZIP System tape after all ZIP System Roof & Wall sheathing panels are fully fastened to roof-frarning members. Only ZIP System tape should be used to seal'the seams of ZIP System panels. Ensure that the panel surfaces are dry and free of any nails, sawdust and other debris, or protrusions. Avoid stepping on tape in high temperature environments. ZIP System tape Is a contact tape that requires pressure for an adequate seal. Step 1. Apply ZIP System tape to every vertical and horizontal panel seam. It is at the discretion of the installer whether to apply tape from the top down or from the bottom up. However, working from the highest sections of the roof and working down will minimize foot traffic on the tape. Ensure that the tape is centered over the seam within +/- 1/2" to provide adequate coverage and to ensure that wrinkles in the tape are minimized. Ensure that tape lengths are continuous across the S' horizontal edge of the panels. If splices are unavoidable, create an overlapping splice of at least 3. Apply moderate pressure onto the surface of the tape. to ensure a secure bond between the panel and the tape. Use ZIP System tape gun or tape roller to apply pressure to the tape and smooth cut any wrinkles. Take special care to remove any voids and/or trapped air at splice areas and T joints. Step 2. For valley areas of framing, we recommend you use 6" wide ZIP System tape. This tape Is wider than panel seam tape and is designed to give you optimal protection in valley areas. Starting from the bottom and working your way up, apply one continuous piece of 6" tape so that the center of the tape is over the valley seam, Use the tape gun or tape roller to apply pressure to the tape to ensure proper contact with the panel and to eliminate any wrinkles that might have occurred in the tape. Take special care to seat tape completely into the valley. Note: - It is Important to pay extra attention to valley taping as water is directed toward the valleys during rain events. Self -adhering Ice and water barriers may be required by code. ZIP System tape is not considered a replacement for seWadhering ice and water barriers. Therefore, when self -adhering Ice and water barriers are required, they should be installed In addition to ZIP System tape. Rrst.Tape Piece 3" overlap Second Tape Piece ZIP System" Roof & Wall Sheathing Installation Manual 04 - ZIP System'" Tape Installation - Roof Panel Seams (continued) Step 3. If 6' ZIP System tape is not available, use two continuous pieces of 3.75" ZIP System panel seam tape over the entire length of the valley seam, overlapping the pieces on the valley seam by at least 1". Starting from the bottom, install the first piece of tape overlapping the valley seam by at least 1 ". Use the tape gun or tape•roller to apply pressureto the.tape to ensure proper contact with the panel and to eliminate any wrinkles that might have occurred in the tape. - Apply the second piece of tape, overlapping the first piece in. the valley seam by 1". - Repeat use of the tape gun or roller to make sure the tape is adequately adhered and tightly pressed into the valley seam. Note: It is Important to pay extra attention to valley taping as water is directed toward the valleys during rain events. Self -adhering ice and water barriers .may be required by code. ZIP System tape is not considered a replacement for self -adhering Ice and water barriers. Therefore, when self -adhering Ice and water barriers are required, they should be installed in addition to ZIP System tape. Step 4. To provide temporary weather protection to roof/wall intersections of dormers or other wood -sheathed projections, apply 2" of the tape width up the vertical projection from where it intersects. with the roof. The remaining tape width can be adhered to the ZIP System roof sheathing panels. Use the tape gun or tape roller to apply pressure to the tape and smooth out any wrinkles. step 5. Install ZIP System tape over hips and ridges by centering the tape over the peak seam. Apply tape in sufficient length to completely extend the length of the hip or ridge. Starting from the lowest. point of the hip and working up, press tape into place keeping tape centered over the hip. Apply moderate pressure onto the surface of the tape to ensure a secure bond between the panel and the tape. Cut ridge tape. as required for ventilation prior to installing ridge vent. Step S. Tape over toe board nail holes once the toe boards are removed, working from the highest toe boards to the lowest.. First piece of tape V overlap Second piece of tape, Roof Covering Installation Instructions ZIP System Roof & Wall sheathing is a code recognized sheathing and underlayment and is approved for use with the following roof coverings: Asphalt -fiberglass Shingles Metal Roofs (shingles and panels) Clay Tile Concrete Tile - Slate and Slate -type Shingles Wood Shingles - Wood Shakes When installing roof coverings, follow applicable codes and manufacturer's suggested instructions. Some roof coverings require a slip -sheet in addition to conventional underlayment. Where slip -sheets are required, they should be installed over ZIP System sheathing panels. Note: Visitzipsystem.com for updates and installation details. Asphalt -fiberglass Shingles Apply asphalt shingles directly to ZIP System sheathing. For roofs with a slope of 2/12 or greater but less than 4/12, additional underlayment may be required. Install asphalt -fiberglass shingles according to applicable codes and manufacturer's installation instructions. Metal Roof Coverings Metal roof coverings may be applied to ZIP System sheathing provided that the roof covering manufacturer's installation instructions and applicable codes are followed. Fasteners used to secure the ZIP System Roof & Wall sheathing panels to supporting framing must be compatible With the specific.metal roof covering used. Galvanized fasteners shall be used with galvanized roof coverings, aluminum -zinc coated fasteners shall be used with aluminum -zinc coated roof coverings and 300 series stainless steel fasteners shall be used with copper roofs. Stainless steel fasteners are acceptable with all metal roof types. In addition, metal roof flashing shall also be made of a material compatible with the specific metal roof covering used. Apply metal shingles on roofs with slopes of 3/12 or greater.. Clay and Concrete Tile Roof Coverings ZIP System Roof & Wall sheathing is Intended to replace the first layer In a two -layer or multi -layer underlayment system. When installing clay or concrete tile roof coverings, follow the installation recommendations ofIFRSA/TRI 07320. Install tile roofs according to applicable codes and manufacturer's installation instructions. j Slate and Slate -type Shingles Apply slate and slate -type shingles on roofs with slopes of 4/12 or greater. Install slate and slate -type shingles according to applicable codes and manufacturer's installation instructions. Wood Shingles ZIP System Roof & Wall sheathing is intended to replace the first layer of underlayment required by the IBC and/or the IRC. Additional layers of underlayment may be required by code depending on the local climate. Apply wood shingles on roofs with slopes of 3112 or greater. Install wood shingles according to applicable codes and manufacturer's installation instructions. Wood Shakes ZIP System Roof &Wall sheathing is intended to replace the first layer of underlayment required by the IBC and/or the IRC. Additional layers of underlayment may be required by code depending on the local climate. ZIP System roof sheathing is not to be construed as a replacement for i.nterlayment. Apply wood shakes on roofs with slopes of 4/12 or greater. Install wood shakes according to applicable codes and manufacturer's installation instructions. ZIP System* Roof & Wall Sheathing Installation Manual ZIP System® Sheathing Installation on Walls Overview: ZIP System Roof & Wall sheathing is composed of ZIP System panels and ZIP System seam sealing tape. ZIP Systemo Roof & Wall Sheathing panels should be fully installed before the seam sealing tape is applied. The following installation steps are presented as a general outline of the installation process. These are manufacturer installation recommendations —please visit zipsystem.com for a library of flashing and installation details. You are fully and • solely responsible for all safety requirements, Good construction and -safety practices should be'followed at all times. Step 1. Install ZIP .System Roof & Wall sheathing panels positioned With the water -resistive barrier facing outside. The panels may be Installed with the long side of the panel oriented either horizontally or vertically to the framing members. Walls that are designed to resist lateral shear forces and sheathed with wood structural panels typically require solid framing or blocking behind all panel edges. If oriented horizontally, block horizontal joints if will is designed for bradng or as a shear wall. 1/8" spacing between.square edges of all adjacent panels is recommended in accordance with industry standards for wood sheathing installation. 8' Panel Edges Panel Edges 4' Panel Edges 1/8, The unique edge profile is designed to accommodate incremental panel expansion and does not require manual gapping along the 8' edges.' Step 2. Fasten the panels to the framing members with code approved fasteners. Space fasteners 6" o.c. along supported edges and 12" o.c. at intermediate supports, unless otherwise specified by- local code or the designer of record. It is the responsibility of the general contractor to verify proper fastener,type and spacing prior to Installation. Apply the fasteners 3/8" from the ends and corners. An ideal installation would be where fastener heads are flush with the panel surface. However, due to variations In materials and. limitations on equipment, this may be difficult to achieve in some situations. It is not required to tape over overdriven fasteners unless the fastener head creates a hole through the entire panel thickness. Please see the technical tip "Overdriven Fasteners in Zip System Roof and Wall Sheathing," on zipsystem.com for more information. 1/B" i Maintain 1/8" space where 8' pawl edges meet 4' panel edges. Unique edge profile does not praoide the full 1/8" recommended space in this sduation.• Maintain 118" space where 4' edges meet Unique edge profile is on 8' edges only.• ZIP System' Tape Installation - Wall Panel Seams Apply ZIP System tape after all ZIP System Roof & Wall.sheathing panels are fully fastened to wall -framing members. Only ZIP System tape should be used to seal the seams of ZIP System panels. Ensure that the panel surface is dry and free of sawdust and dirt prior to taping. ZIP System tape Is a contact tape that requires pressure for an adequate seal. Step 1. Tape all seams using ZIP System tape. Ensure that the tape Is centered over the seam within +/- 1/2' to provide adequate coverage and that wrinkles in tape are minimal. Use the ZIP System tape gun or roller to apply pressure to the tape and smooth out any wrinkles. Step 2. Wherever tape splices occur at a horizontal or vertical seam, create an overlapping splice of at least 3 At T-joints, the tape pieces should overlap by at least 1" Apply moderate pressure onto the surface of the tape to ensure a secure bond between the panel and the tape. Use the ZIP System tape gun or roller to apply pressure to the tape and smooth out any wrinkles. Take special.care to remove any voids and/or trapped air at splice areas and T-joints. Step 3. Tape inside and outside comer seams. seam Note: Tape over any areas of the panel or tape that are damaged during constructlom ZIP System° Roof & Wall Sheathing Installation: Manual ZIP System -Window Installation. DI$CLAIMER: The following steps represent a generaloverAswfor the proper installationofWindowflashing.Please defer tofconsult 7 the installation instructions of your window manufacturer as well as code requirements in your lurisdiction for full installation details. Flanged Windows 1.. Fasten the ZIP System sheathing to the wood frame and install ZIP System tape to all wall panel seams, as detailed in sections 02 and 03. 5 2. ZIP System tape may be used as pan flashing if installed in accordance with flanged window Installation details posted on zipsystem.com. Other adhesive based flashing tapes (must meet ICC-ES Acceptance Criteria for Flashing Materials (AC148)) maybe used as pan flashing if installed per ASTM, 2112.07. Apply the flashing to cover the bottom of the opening, overhanging onto the sheathing by at least 2" and extending a minimum of 6" up each jamb. 3. Apply sealant around inside face of mounting flange. Sealant must be gapped at the sill to permit drainage. I nstall and level window per manufacturer's installation instructions. Verify sealant compatibility with window manufacturer. When using ZIP System tape as pan flashing, butyl, 1000% silicone or polyurethane sealants are acceptable. Do not use latex or other water - based sealants. 4. Cut two pieces of ZIP System tape or another adhesive -backed flashing tape (must meet ICC- ES Acceptance Criteria for Flashing Materials (AC148)) and apply to each of the window jamb - .flanges,_ensuring_the_jamb-flashings_ovedap..the sill flashing. Once the tape is in place, use the tape gun or roller to seal the flashing to the sheathing. 5. Cut a length of ZIPSystem tape or another adhesive-backedflashing tape (must meet ICC- ES Acceptance Criteria for Flashing Materials (AC148)) and apply to the header, .ensuring that the flashing overlaps the jamb flashings.' Once the tape is in place, use the tape gun or roller to seal the flashing to the sheathing. TO NOT tape bottom flange. 6. From the interior, apply low-pressure polyurethane foam (for windows) between the rough opening and the window frame. (Caulk sealant compatible „ with the sill flashing may be used at the sill ii the opening between. the sill flashing and window 1 is too narrow to allow the use of low-pressure k polyurethane foam.) When using ZIP System tape, butyl, 100%;' s-„ ' silicone or polyurethane sealants.are. acceptable. Do not use latex sealants with ZIP System tape. If using another flashing tape, follow the flashing manufacturer's recommendation in selecting a sealant compatible with that flashing. Brick Mould Windows 1. Fastenthe.ZIPSystem sheathing to the wood frame and install ZIP System tape to all wall panel seams, as detailed in sections 02 and 03. 2. If recommended by the window manufacturer, cut a strip of wood to function as a back dam at the sill. The wood strip should have rough opening and a height and Width of at least V2". Position the block at the Inside edge of the window frame. Zip $ stem -Window Installation DISCLAIMER: The following stops represent a general ovewiewfor the proper Installation ofwindow flashing. Pleasedefer tolconsult y the installation instructions of your window manufacturer as we0 as code requirements in your iudsdiction for full Installation deals. • Brick Mould Windows (continued) 3. ZIP System tape may be used as pan flashing if Installed in accordance with brick mould window installation details posted on zipsystem.com. Other adhesive -based flashing tapes (must meet ICC-ES Acceptance Criteria for Flashing Materials (AC148)) may be used as pan flashing if installed per ASTM 2112-07. Apply the flashing to cover the bottom of the opening, overhanging onto the sheathing by at least 2" and extending -a minimum of 6" up each jamb. 4. For vertical jambs, cut ZIP System tape or another adhesive -backed flashing tape (must meet ICC- ES Acceptance Criteria for Flashing Materials (AC148)) and apply to each of the window jambs. Ensure that they cover the entire inside of the rough opening as well as overlap onto the sheathing by at least 2". Flashing shall also extend above the rough opening, such that it will project 1" beyond the exterior trim of the window. Once the tape is in place, use the tape gun or roller to seal the flashing to the sheathing. 5. Apply sealant to jambs and header allowing for drainage at the sill in accordance with window manufacturer's installation instructions. When using ZIP System tape, use a butyl, polyurethane or 100/o silicone sealant. Do not use :latex or other water -based sealants with ZIP System tape. When using another flashing tape, follow the flashing manufao=turees recommendations in selecting a sealant compatible with that flashing. 6. Install and.level window per manufacturer's installation instructions. 7. Cut a piece of rigid head flashing so that when installed, it is flush with the edges of the exterior moulding of the window. Apply a bead of sealant to the back and bottom surface of the rigid head flashing. Use sealant recommended by the flashing manufacturer, 8. Secure the rigid head flashing to ZIP System wall sheathing. 9. Cut a length of ZIP System tape or another adhesive -backed flashing tape (must meet ICC-ES Acceptance Criteria for Flashing Materials (AC148)) and apply to the rigid head flashing, ensuring that the adhesive -backed flashing overlaps the jamb flashings. Once the tape is in place, use the tape gun or roller to seal the flashing to the sheathing. 10.From the interior, apply low-pressure polyurethane foam (for windows) between the rough opening and the window frame. (Caulk sealant compatible with the sill flashing may be used at the sill if the opening between the sill flashing and window is too narrow to allow the use of low-pressure polyurethane foam.) When using ZIP System tape, butyl,100% silicone or polyurethane sealants are accepts ble. Do not use latex or other water -based sealants: with ZIP System tape. If using another flashing tape, follow the flashing manufacturer's recommendation In selecting a sealant compatible with that flashing. Rroal ZIP System"' Roof &Wall Sheathing Installation Manual ZIP System - Penetration Openings DECLAIMER: The fallowing steps represent a general overview for the proper installation of penetration flashing. Please defer tofconsult your code requirements in yourjurislfiction for full installation details. WALL ASSEMBLY ZIP SYSTEM& WALL SNEATHNG WOOOORLT.OAMET^LSTUDS / ZIP SYSTEMB,TAPE OINSTALLED OVERALL JONTD N21P'SYG INSTALL DP SYSTEMS TAPE AT BALL INTERIORCORNERS FASTEN ZIP SYSTEM® WALL SHEATHIND AS REQIBDA BY WALL ASSEMBLY ZIP SYSTEMS WALL SHEATHING WOOD OR LT, GA. METAL STUDS 1/84NCH GAP RECOMMENDED AT PANEL EDGES UNLESS OTHERWISE PROVIDED BY MACHINED PROFILED EDGES — INSTALL ZIP SYSTEMS) TAPE OR ADHESIVE BACKED FLASHING (MUST MEET AC1481 IN SEQUENCE FROM BOTTOM, SIDES. THEN TOP TO ENSURE SHINGLE LAP OF ADHESIVE BACKED.FLASHING ZIP SYSTEM® TAPE (INSTA .LED OVER ALL. JOINTS IN ZIP SYSTEM@ WALL SHEATHING). OVERLAP TAPE A MINIMUM OF 1-INCH AT ALL TJOINTS USE FLANGED ELECTRICAL. BOXES OR MEMBRANE FLASHING TOPROVIDEFLANGES FOR ELECTRICALBOXES WALLAODCMDLY' ZIP SYSTEMS WALL SK&SHNG WOOD.03 LT. GA METµ STUDS. A\ 1/B4Na1 GAP RECOMMENDED AT PANEL EDGES UNIESS OTHERN13EPROVIDE)BY MAV,NEDPRCF"EDGES - OVEMAPTAPEA MINMUMOF 14NCN ATAIL TJOINTS— FASTEN ZIPSYSTEMPWALL SNAHNOAULRO DESIGNRECOD CR BUDDING CODE WALLASSEMBLY ZIP SYSTEMS WALL SHEATHING WOOD OR LT. GA METAL STUDS 118-INCH GAP RECOMMENDED AT PANEL EDGES UNLESS OTHERWISEPROVIDEDRY MACHINED PROFILED EDGES — INSTALL ZIP SYSTEMOTAPE OR ADHESIVE BACKED FLASHING (MUST j!;: MEET AC148) IN SEQUENCE FROM BOTTOM. SIDES. THEN TOP TO ENSURE SHINGLE LAP OF ADHESIVE BACKED FLASHING ZIP SYSTEMSTAPE (INSTALLED OVERALL JOINTS IN ZIP SYSTEM@ WALLSHEATHING). OVERLAP TAPE MINIMUM OF 14NCH AT ALL TJOINTS .. USE -FLANGED VENT -HOODS __ _ - ZIP System Sheathing Installation Details on Walls — visit zipsystem.com for more details. WALL ASSEMBLY BRICK VENEER AIR SPACE (AS PRESCRIBED BY LOCAL BUILDING CODE) ZIP SYSTEMQD WALL SHEATHING WOOD OR LT. GA. METAL STUDS TOP EDGE OF FLASHING TAPED WITH ZIF.SYSTEMO TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AC148) CODE APPROVED BASE FLASHING --� WEEP HOLES (AS PRESCRIBED BY LOCAL BUILDING CODE) - WALL ASSEMBLY BRICKVENEER AIRSPACE,(AS PRESCRIBED BY ' LOCAL BUILDING CODER ZIP SYSTEMS WALL SHEATHING - WOOD OR LT. GA. METAL STUDS / 1184NCH GAP RECOMMENDED AT PANELEDGES UNLESS QN'HERWISE PROVIDED BY MACHINED PROFILED EDGES ZIP SYSTEMS TAPE QNSTALIED OVER ALL JOINTS INZIP SYSTEM® WALL SHEATHING). \\ OVERLAP TAPE MINIMUM OF NT5 1-INCH ATALL YJOI100 1J84NCH GAPRECOMMENDEDAT� PANEL EDGES UNLESS OTHERWISE PROVIDED BY MACHINED PROFILED EDGES FASTEN ZIP SYSTEMD WALL SHEATHING AS REQUIRED BY DESIGNER-OF-RECORDORLOCAL- BUILDING'CODE Note: For optimal air leakage reduction; all untaped edges of the panels can be caulked, gasketed or sealed with a weather stripping material. ZIP System° Roof & Wall Sheathing Installation .Manual 12 ZIP System Sheathing Installation Details on Walls (continued) WALL ASSEMBLY BRICK VENEER AIR SPACE (AS PRESCRIBED BY LOCAL BUILDING CODE) ZIP SYSTEM® WALL SHEATHING WOOD OR LT. GA. METAL STUDS TOP EDGE OF FLASHING TAPED WITH ZIP SYSTEM® TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET.AC148) CODE APPROVED FLASHING — WEEPS (AS PRESCRIBED BY LOCAL BUILDING CODE) STEEL LINTEL INSTALL WINDOW IN ACCORDANCE WITH DETAILS 24A-24D OR 25A-25D, WALL BEYOND WALL.ASSEMBLY CODE APPROVED CLADDING (INSTALLED IN ACCORDANCE WITH CLADDING MANUFACTURER'S INSTALLATION RECOMMENDATIONS) EXTERIOR RIGID INSULATION DRAINAGE PLANE"(MIN. Ye") ZIP SYSTEM® WALL SHEATHING WOOD OR. LT. GA..MEfAL STUDS TOP EDGE OF FLASHING TAPED TO WALL SHEATHING WITH ZIP SYSTEM® TAPE OR ADHESIVE BACKED FLASHING. (MUST MEETAC148.) CODE APPROVED FLASHING WALL BEYOND BACKDAM PER WINDOW MANUFACTURER'S INSTALLATION RECOMMENDATIONS INSTALL CODE -RECOGNIZED SILUPAN FLASHING IN ROUGH OPENING PRIOR TO WINDOW INSTALLATION. TOP EDGE OF FLASHING TAPED WITH ZIP SYSTEM® TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AC148) WEEPS (AS PRESCRIBED BY LOCAL BUILDING CODE) CODE APPROVED FLASHING WALL ASSEMBLY BRICK VENEER AIRSPACE (AS PRESCRIBED BY LOCAL BUILDING CODE) ZIP SYSTEM® WALL SHEATHING 'WOOD OR LT. GA. METAL STUDS Note: For optimal air leakage reduction, all untaped edges of the panels can be caulked, gasketed or sealed with a weather stripping materlal. ZIP SYSTEMO SHEATHING WITH HARD COAT STUCCO AT u BLOCK FOUNDATION WALL- OPTION A , n.2 TRADITIONAL HARD -COAT STUCCO CONTROL JOINTS AS NEEDED. DESIGNER -OF -RECORD TO SPECIFY TYPE AND LOCATION. MASONRY BLOCK WALL -ZIP SYSTEMS SHEATHING IS APPROVED TO REPLACE ONLY THE FIRST LAYER OF A TWO -LAYER UNDERLAYMENT SYSTEM. LATH ONE LAYER OF WATER -RESISTIVE VAPOR -PERMEABLE BARRIER WITH A PERFORMANCE AT LEAST EQUIVALENT TO GRADE D BUILDING PAPER, ZIP SYSTEM® SHEATHING' TOP EDGE OF WEEP SCREED TAPED TO WALL SHEATHING WITH ZIP SYSTEM® TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AAMA 711 OR AC148) WOOD OR LT. GA. METAL STUDS ADHESIVE BACKED MEMBRANE BRIDGE FLASHING CENTERED OVER TRANSITION JOINT (ZIP SYSTEM TAPE MAY BE USED AS THE BRIDGE FLASHING) DRAWING NOT TO SCALE o TM Sales Office:10925 David Taylor Drive XlpsYsteRi ENGINEERED Suite 300 -Charlotte, NC 28262 NOW(* o SHEATHING & TAPE Telephone: 800.933.9220 - mwr.zipsystem.corn WoODs These construction details are provided to assist in the installation of ZIP System® product(s) and may not apply to every situation. Manutacturer accepts no responsibility or liability for the use of these or other construction details. P, ZIP SYSTEM®SHEATHING WITH HARD COAT STUCCO AT BLOCK FOUNDATION WALL- OPTION A H-2 WALL ASSEMBLY TRADITIONAL HARD -COAT STUCCO METAL LATH ONE LAYER WATER-RES. BARRIER ZIP SYSTEMS SHEATHING' WOOD OR LT. GA. METAL STUDS TOP EDGE OF WEEP SCREED TAPED TO WALL SHEATHING WITH ZIP SYSTEMS TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AAMA 711 OR AC148) CODE -APPROVED WEEP SCREED AT BASE OF WALL - ADHESIVE BACKED MEMBRANE BRIDGE FLASHING CENTERED OVER \' TRANSITION JOINT (ZIP SYSTEM TAPE MAY BE USED AS THE BRIDGE FLASHING) MASONRY BLOCK WALL •" LATH TOP EDGE OF WEEP SCREED TAPED TO WALL SHEATHING WITH ZIP \ SYSTEMS TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AAMA 711 OR ` AC148) TRADITIONAL HARD -COAT STUCCO INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S OR THE PORTLAND CEMENT ASSC. (PCA) RECOMMENDATIONS WITH THE MOST RESTRICTIVE CONTROLLLING. ONE LAYER OF WATER -RESISTIVE I VAPOR -PERMEABLE BARRIER WITH A 7_01 PERFORMANCE AT LEAST EQUIVALENT TO GRADE D BUILDING PAPER. CODE -APPROVED WEEP SCREED AT BASE OF WALL ADHESIVE BACKED MEMBRANE BRIDGE FLASHING CENTERED OVER TRANSITION JOINT (ZIP SYSTEM TAPE MAY BE USED AS THE BRIDGE FLASHING) MASONRY BLOCK WALL *ZIP SYSTEMS SHEATHING IS APPROVED TO REPLACE ONLY THE FIRST LAYER OF A TWO -LAYER UNDERLAYMETYf'u1' gNgT TO SCALE o %%/ TM Sales Office: 10925 David Taylor Drive mill Sj�SfP.%%T IIIIDCD ENGINEERED Suite 300 - Charlotte, NC 28262 f uODcr SHEATHING 88 TAPE Telephone: 800.933.9220 - www.zipsystem.com W000s These construction details are provided to assist in the installation of ZIP System® product(s) and may not apply to every situation. Manufacturer accepts no responsibility or liability for the use of these or other construction details.