HomeMy WebLinkAboutFIELD DENSITY TEST}
e e v�a
& TESTING INC.
250 SIN 13th Ave Pompano Beach, FL 33069
RECEIVED
MAY 2 5 201E
Field Density Tests of Compacte&SWFIO 'od D-6938
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
www.fed-eng.com
Project: Proposed Residence Lot 132, Creekside Date: May 7, 2018
Address: 8412 Cobblestone Drive, Fort Pierce, FL Order #: 18DR379
Area Tested: Building Pad Permit #: % Z l z- -
Material Type: Brown Sand with Traces of Shell Tech: BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
value
PCF
Optimum
moisture
/o
Compaction
Pass
1
Center of Building Pad
12"
FL
7.1
106.1
106.8
14.0
99.3%
Yes
2
1 NE Corner of Building Pad
12"
1 FL
13.7
106.0
106.8
14.0
99.3%
Yes
3
SW Corner of Building Pad
12"
FL
10.2
104.9
106.8
14.0
98.2%
Yes
4
5
6
7
8
9
10
11
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Spit Bearing Capacity.
Legend for Elevation: �(
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Subrhitted'by:.,
.v1 -Cd
SL = Springline FL = Final Lift - Keith LeBlanc; •?.E.. S/ b t S
SG = Subgrade BG = Below Grade Federal•Engineerin & Testing, Inc.
BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59:394
TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5471
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of cgmpaction of the tested layer of material
only.'A density does not replace a soil bearing capacity determination. These density tests do not certifyihA. underlying soii.materlal's balow the proposed structure. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required t certify that the 4nderlyirig soils will support the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that-soil'berings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retestingimust be performed on this work.
PAGE 1 of 2
Com
Pursuant to your request, Federal Eng ! ne
project on the reverse side. The purpose
material only. In no way shall a co
performed by the client prior to constructs
12" of added fill material. FET was not co
added fill material does not include an ana
the proposed structure without settlement.
conditions below the tested top 12 inches
structure, we recommend performing soil C
soil conditions.
.d Soils Method D-6938 Disclaimer
ring
", '-& Testing, Inc. (FET) has performed a compaction test at the referenced
of our test was to determine the degree of compaction of the tested layer of
i test replace a soil bearing capacity determination. A soil boring test must be
to verify subsoil conditions. Our scope of services only included testing the top
tracted to perform supervision of the building pad preparation. This testing of the
Fsis of the underlying soil materials to determine if they are capable of supporting
This density compaction test does not warranty any underlying soil materials or
material. If no soil borings have been performed in the location of the proposed
rings below all foundation areas of the proposed structure to verify the underlying
Environmental analysis of the soil materials'is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for perfo7ing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for pied areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
J
Page 2 of 2
V
Phone 954-784-2941
eder'�dl'
``
800.848-1919
Fax 954-784-7875
& TESTING INC.
www.fed-eng.com
250 SW 131h Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6930
Project: Proposed -Residence Lot 132, Creekside
Date:
May 7, 2018
Address: 8412 Cobblestone Drive, Fort Pierce, FL
Order #:
18DR379
Area Tested: Building Pad
Permit #:
1712-- 0�5
Material Type: Brown Sand with Traces of Shell
Tech:
BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1.557
Test
#
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density.
PCF
Proctor
Value
PCF
Optimum
Moisture
% ..-
Compaction
Pass
1
Center of Building Pad
12"
FL
7.1
106.1
106.8
14.0
99.3%
Yes
2
NE Corner of Building Pad.
12"
FL
13.7
106.0
106.8
14.0
99.3%
Yes
3
SW'Corner of Buildin 'Pad
12"
FL
10.2
104.9
106.8
14-.0
98.2%
Yes
4
5
6
7
8
VA V
9
per
Jci
2018
10
'
epartme
t
11
L
12
13
14
111 I I l l/K
Remarks: See Reverse Side Page 2 of 2 for Additional Information.for Disclaimer
This is a Compaction Test only
on the top 12"-of the pad and is not a verification of S
rang a aci . '•• i
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift
Submitted by:
SL = Springline FL = Final Lift
Keith LeBlanc,
EA , STATE 01/
y;
SG = Subgrade BG = Below Grade
Federal Engine `.Testing,
Inc.
BC = Basecourse BOF = Bottom of Footing Florida Reg. No. W '•'cCOii1DP••'�!� mow'
TOP = Top of Pipe FG = Finished Grade Certificate of Authort�1it 11 T�i6 NG
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizat�c� )9,'1r Blk�tiQQ�q~ �a%tements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction offt!61144 �d Ityer of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after -heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2