& TESTING INC.
250 SW 13th Ave Pompano Beach, FL 33069
Phone 954-784-2941
CrV�[� 800-848-1919
Fax 954-784-7875
JUL 14 "�1$ +•fed-eng.com
Field Density TeAts-mfL6efhpi ot� Method D-6938
Project: Proposed Residence Lot 133, Creekside Date: July 12, 2018
Address: 8408 Cobblestone Drive, Fort Pierce, FL Order #: 18DR632
Area Tested: Building Pad -Permit #: % %_
Material Type: Dark Yellowish Brown Sand with Traces of Shelf Tech: TS
Client: D.R. Horton, Inc.
Address: 1430-Culver_Drive NE Compaction Req.:
Palm Bay; FL 32907 Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
=
Probe
Depth
Elev.
Moist
oho
Dry
Density
PCF
Proctor
Value
PCF
Optimum
. Moisture
%
Compaction
Pass
1
NW Corner of Building -Pad
12"
FL
9.2
111.7
113.5
12.0
98.4%
Yes
2
Center of Building Pad
12"
FL
7.8
108.1
113.5
12.0
95.2%
Yes
3
SE Corner of Building Pad
12"
FL
5.5
110.3
113.5
12.0
97.2%
Yes
4
5
6
7
8
9
10
11
12
13
14
Remarks: See Reverse Side
This is a ComDacl
2 of 21 for Additional Information for Disclaimer
on the too 12" of the Dad and is not a verification of Soil
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = Springline FL = Final Lift Keith LeBlanc, P.E, , `
SG = Subgrade BG = Below Grade Federal Engineering & Testing, Inc,,
BC = Basecourse BOF = Bottom of Footing APPROVED
Florida Reg. No.-59394
TOP = Top of Pipe FG = Finished Grade Certificate of Authorizati6h #547-1
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and vutliorization.for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree o' c �i action^of the_teste daayer of-ma4erial
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials bi l w?thy proposed struct6re:,4* results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying skit wi;lr"sure rtithe pro�osE�3'structure
Pti
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
' � n
Com
Pursuant to your request, Federal Engineeri
project on the reverse side. The purpose o
material only. In no way shall a compaction
performed by the client prior to construction 1
12" of added fill material. FET was not contr
added fill material does not include an analys
the proposed structure without settlement. 7
conditions below the tested top 12 inches of r
structure, we recommend -performing soil bori
soil conditions.
Soils Method D-6938 Disclaimer
d & -Testing; Inc:' (FET) has performed a compaction test at the referenced
our test was to determine the degree of compaction of the tested layer of
ast replace a soil bearing capacity determination. A soil boring test must be
verify subsoil conditions. Our scope of services only included testing the top
.ted to perform supervision of the building pad preparation. This testing of the
of the underlying soil materials to determine if they are capable of supporting
its density compaction test does not warranty any underlying soil materials or
aterial. If no soil borings have been performed in the location of the proposed
gs below all foundation areas of the proposed structure to verify the underlying
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for perfor,l ing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available aft the time the work was performed. Determination of the pass/fail compaction
results are based on current common industryl requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas
areas or dates. Any subsequent site disturb
overgrown, vegetation, traffic and other disturl
to construction.
As a mutual protection to clients, the public
and authorization for use, publication of s
pending written approval.
It has been a pleasure working with you and we
f our site work and should not be relied upon to represent conditions on other
ces due to water erosion, rain waters, construction activities, excavations,
nces-will void this test and the site must be re -compacted and re -tested prior
ourselves, all reports are submitted are the confidential property of clients
cents, conclusions or extracts from or regarding our reports is reserved
forward to doing so in the near future.
RECEIVED _
.. _ Phone 954-784-2941
800.8�48.1919
edera`�
JUL 1 8 2018 Fax 954-784-7875
8 TESTING INC. $T, Wcle County, Permitting www.fed-eng.com
250 SW 131h Ave Pompano Beach, FL 33069
Field Density'Tests ®f Compacted Soils Method D-6938
Project: Proposed Residence Lot 133, Creekside Date:
Address: 8408 Cobblestone Drive, Fort Pierce, FL Order #:
Area Tested: Building Pad Permit #:
Material Type: Dark Yellowish'Brown Sand. with Traces of Shell Tech:
Client: D.R. Horton, Inc.
Address: 1430-Culver Drive NE Compaction Req.:
Palm Bay. FL 32907 Proctor Method:
July 12, 2018
18DR632
TS
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe:
Depth
'
Elev.
Moist
'err
Dry
Density
PCF
. Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1 INW
Corner of Building Pad
12"
FL
9.2
111.7
113:5 .
12.0
98.4%
Yes
2 1
Center of Building Pad
12"
FL
7.8
108.1
113.5
12.0
95.2%
Yes:
3
ISE Corner of Building Pad
12"
FL
5.5
110.3
113.5
12.0
97.2%
Yes
4
5
6
7
8
9
10
11
12
13
14 \�\ JQ fi6 dsi
s
Remarks: See Reverse Side (Page 2 of 2 for Additional Information for e ' 4aC
This is a Compaction Test onlyon the to 12" of the pad and is not a verification of Soil Be ac ���
Legend for Elevation:° a
PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: 9
e "r � o ��
SL = Springtine FL =.Final Lift Keith LeBlanc, P.E. � �o � � .�
SG = Subgrade BG = Below Grade Federal Engineering 8®1 fge�`e • N
BC = Basecourse BOF =Bottom, of Footing Florida Reg. No. 69394
TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5�4°��®���L `
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publicatlld b Ntitl�z te,
conclusions or extracts from or regarding our reports is reserved pending our written approval: A density testdetermines the degree of compaction of the tested layer of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2