Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTedek-,--Al & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 s Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com Field Density Tests of Compacted Solis Method D-6938 Project: ProposedResidence Lot 1, Creekside Date: August 8, 2018 Address: 8319 Cobblestone Drive, Fort Pierce, FL Order #: 18DR714 Area Tested: Building Pad Permit Material Type: Light Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton; Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION _Probe Depth , Elev. Moist' % Dry Density PCF Proctor Value PCF Optimum moisture /o Compaction Pass 1 Center of Building Pad 12" FL 11.0 106.3 106.9 12.0 99.4% Yes 2 - SW Corner of Building Pad 12" FL 6.9 106.8 106.9 12.0 99.9% Yes 3 NE Corner of -Building Pad 12" FL 6.1 105.0 106.9 12.0 98.2% Yes 4 5 6 7' - 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This -is a -Compaction Test oniv on the top 12" of the pad and is not a verification of SoiL Bearing Capacity. Legend for Elevation: 8d PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL =Final Lift Keith LeBlanc„ F'.E. v ` SG = Subgrade BG = Below Grade Federa'FEngineering i4 Testing, Inc..`/9� " BC = Basecourse BOF = Bottom of Footing Flcnda Reg. No. 59,394 TOP = Top of Pipe FG = Finished. Grade Certificate of Authorization #5471 As a mutual -protection to clients, the public and ourselves, all -reports are submitted as the confidential property of,clients, and authorization for publication of statements, conclusions -or extracts from or regarding our reports is reserved pending our written approval. A density test determinesthF=degree of compaction of the -tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil ,oaterials`below the proposOd•structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the unii3rlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be petfoi led t6jeiakjaie We suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be perfdrrned,on this work. PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal -Engineering & Testing, Inc. (FET)' has performed a compaction test at the referenced project on the reverse'side..The purpose of our test was to determine :the degree of compaction. of the tested layer of material only. In no way shall -.a compaction, test replace a soil bearing capacity determination, A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope'of services only included testing the top 12" of added fill material.'' ' FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying, soil materials to determine if they are capable of supporting the proposed structure without settlement: This density compaction test does not warranty any underlying soil materials or conditions below,the-tested _top 12 inches, of. material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil -borings below all foundation areas of, the proposed structure to verify the underlying soil conditions. h; Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for.performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the -tested layer of material only. No other analysis is implied or warranted. Job project specifications were -hot available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots.If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas f r site work g o our s t o and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients,�_the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look, forward to doing so; in the near future. I Page 2 of 2 .