August 15, 2018
Integ-Crete Construction
Joel Percy
10550 W. Midway Road
Ft. Pierce, FL 34945
Re: Modular Multi -Purpose Facility
The..Crossing Phase II
5206 Oleander Avenue
Ft. Pierce, Florida
KSM Project #: 182734-b
Dear Mr, Percy:
As requested, KSM Engineering & Testing has performed a subsurface investigation at
the referenced site. Presentation of the data gathered during the investigation, together
with our geotechnical related opinions, are included in this report.
Project Description:
The existing modular multipurpose facility is supported by piers on footing pads. We
were requested to estimate the allowable soil bearing pressure.
Site Investigation:
The site _investigation program consisted of performing three (3) Standard Penetration
Test borings (SPT), next to the existing modular unit. The SPT borings were terminated
at depths of 10 to 14 feet below grade. The locations of the borings are indicated on
the attached boring Location Plan.
�c0 F.odM
AUG 2 0 RECD D ',
41' s r Y h FrY tY
�l � F'U, 1 �� �� z lii•4�
Roriald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
0
L%L VA
KELLER, SCHLEICHER &
MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755
PO, BOX 78-1377, SEBASTIAN, FL 32978-1377
SEBASTIAN (772) 589-0712
PALM BEACH (561.) 845-7445
www.ksmengineering.net
MELBOURNE (321) 768-8488
FAX (561) 845-8876'..,
E-Mail: KSM@KSMENGINEERING.NET
ST. LUCIE (772) 229-9093
C.A.: 5693
FAX (772) 589-6469
The Crossi-Phase II.
-2-
August 15, 2018
Ft. Pierce, Florida
The SPT borings were completed in accordance with procedures described in ASTM D-
1586. A. standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by
successive blows of a 140 pound hammer freely falling 30 inches. The number of
blows required to drive the sampler 1 foot, after seating 6 in., is designated the
Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from
the ground, and opened to allow visual examination and classification of the retained
soil sample. Also, the groundwater table was allowed to stabilize and the depth of the
groundwater elevation recorded from existing grade.
The records- 'of the soils encountered, the penetration resistances and groundwater
level are shown on the attached logs.
Engineering Evaluation and Conclusions:
Based on the information obtained from this site investigation, we are pleased to offer
the following evaluation:
The boring logs indicate the subsurface soils consist mostly of fine-grained sand and
fine-grained sand that is slightly. clayed. "N" values recorded during the boring
operation indicate the soil density is generally medium dense. Please refer to the soil
boring logsfor specific information relative to the soil description.
Based on the existing soil conditions, the allowable soil bearing pressure is 2,500
pounds per square foot. We anticipate total settlement less than 'h of an inch and
differential- settlement of less than'/4 of an inch.
Site Preparation For Any Addition Footing Pads:
After excavating for the footings, the disturbed footing subgrade should be compacted
to 95 percent (minimum) of its modified dry Proctor value.
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
IV OIL t
Z%1JAVL
KELLER, SCHLEICHER
&
MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755
P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377
SEBASTIAN (772) 589-0712
PALM BEACH (561)�845-7445
www.ksmengineering.net
MELBOURNE (321) 768-8488
FAX (561) 845-8876
E-Mail: KSM@KSMENGINEERING.NET
ST. LUCIE (772) 229-9093
C.A.: 5693
FAX (772) 589-6469
The Cross Phase .II -3- August 15, 2018
Ft. Pierce, , Florida
Closure:
This reporthas been prepared in accordance with generally accepted soil and
foundation, engineering practices based on the results of the test borings and the
assumed- loading conditions. No warranties, either expressed or implied, are intended
or made. This report does not reflect any variations which may occur between the
borings. If' variations appear evident during the course of construction, it would be
necessary to re-evaluate the recommendations of this project.
Environmental . conditions, wetland delineation, water quality, and municipal
requirements are not a part of this report.
We are pleased to be of assistance to you on this phase of your project. When we may
bye %to „+'`S�eiyice to you or should you have any questions, please feel free to call.
• o
w • �� r
'N 09 v
vi• SP± I
M 4
J �
Email to: joel@integcrete.com
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
Keller Schleicher & MacIMm Engineering & Testing
MW
BORING NUMBER B-1
KSMP. O. Box 78-1377
PAGE 1 OF 1
Sebastian, FL. 32958
Telephone: 772-589-0712
Fax: 772-589-6469
CLIENT Integ-Crete Construction
PROJECT NAME The Crossing Phase II
PROJECT NUMBER 182734-b
PROJECT LOCATION 5200 Oleander Avenue, Ft. Pierce, Florida
DATE STARTED 8/13/18 COMPLETED 8/13/18
GROUND ELEVATION
HOLE SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
�Z AT TIME OF DRILLING 1.25 ft
LOGGED BY DP/CH CHECKED BY JEK
AT END OF DRILLING --
NOTES Near NW Croner of Modular
AFTER DRILLING —
W
o
Z
tt
♦ SPT N VALUE A
L)
r
v� W
W
5
20 40 60 80
a_0
O
MATERIAL DESCRIPTION
m
n
wo
> Ci
�z�
O r a
��
W.4
z
PL MC LL
W v
p
a.Z
U�
m0Z
U"
}"
20 40 60 80
O
<
W
W
El FINES CONTENT (%) El
a
'I
LU 4U ou t
Gray Sand with"Traces of Roots
:.......:.......
..............................
.......:.......
....... .....:......:.......
...... :.......:.......
..... ....... :....... :.......
- Light Gray Sand
VSS
5-5-5
IX
Dark Gray Sand with Traces of Hardpan
SS
6-8-8
•
Dark Brown Sand
Light Brown Sand with Traces of Clay
SS
10-12-10
(22)
8-10-11
(21)
SS
9-10-9
(19)
Bottom of borehole at 10.0 feet.
m
0
m
g
0
z
f2
0
0
J
a
Keller Schleicher & Mac111m Engineering & Testing
low
BORING NUMBER B-2
KSMP. O. Box 78-1377
PAGE 1 OF 1
Sebastian, FL. 32958
Telephone: 772-589-0712
Fax: 772-589-6469
CLIENT Integ-Crete. Construction
PROJECT NAME The Crossing Phase II
PROJECT NUMBER, .182734-b
PROJECT LOCATION 5200 Oleander Avenue, Ft. Pierce, Florida
DATE STARTED 8/13/18 COMPLETED 8/13/18
GROUND ELEVATION
HOLE SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
AT TIME OF DRILLING 1.33 ft
LOGGED BY DP/CH CHECKED BY JEK
AT END OF DRILLING —
NOTES N. Side - Near Center of Modular
AFTER DRILLING —
o
♦ SPT N VALUE A
U
nW
W
W
20 40 60 80
EL v
=O
O
MATERIAL DESCRIPTION
m
g
_
wo
> a
oz�
O D Q
��
W w
~
Z
PL MC LL
o
a
O
m O>
v"
} v
20 40 60 80
0
2Z
<
V
UZ
W
❑ FINES CONTENT (%) ❑
a
5
"
:.:; •;:
:.....
Gray Sand
..... ....... :....... :....... :..
:
..... .:....... :....... :....... :..
- Light Gray and
3-4-4
Dark Brown Sand
_
4-5-7
(12)
10
SS
8-8-10
(18)
[;•;::.
:...
.. .
Light Brown Sand with Traces of Clay
`..
SS
9-10-10
SS
13-15-16
Gray Sand, Slightly Clayed with Some Shell Fragments
SS
12-9-8
(17) .
X
SS
(16)
Bottom of borehole at 14.0 feet.
U
O
O
ro
W
J
U.
Keller Schleicher & MacWm Engineering & Testing
W
BORING NUMBER B-3
KIJ1V1 Ban?FL.332958 77
PAGE 1 OF 1
Seb
Telephone: 772-589-0712
Fax: • 772-589-6469
CLIENT Integ-Crete.Cdnstruction
PROJECT NAME The Crossing Phase II
PROJECT NUMBER .182734-b -
PROJECT LOCATION 5200 Oleander Avenue, Ft. Pierce, Florida
DATE STARTED 8/13/18 COMPLETED 8/13/18
GROUND ELEVATION
HOLE SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
Q AT TIME OF DRILLING 1.42 ft
LOGGED BY DP/CH CHECKED BY JEK
AT END OF DRILLING --
NOTES Near NE Corner of Modular
AFTER DRILLING --
}
w
♦ SPT N VALUE A
L)
w
p?
20 40 60 80
PL
a.a. "�
�
Lu
Q-00
MATERIAL DESCRIPTION
J
�
Q
w 2
v
�
ZCL
v
C
20 40 60 80
�
(L
�
m 0 z
U
r
❑ FINES CONTENT (%) ❑
C9
<
W
a
0
n
911 An Rn Rn
Gray Sand with'Traces of Roots
_ Light Gray Sand
4-5-6
;.
SS
Dark Grayish'Brown Sand with Traces of Hardpan
SS
(16)
Dark,Brown Sand
10-9-8
SS
..............................:......
Light Brown Sand with Traces of Clay
8-7-9
SS
(16)
SS
9-11-14
....... ...... ....... ....... ......
.(25)
Bottom of borehole at 10.0 feet.