HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODE-7r
r
Planning & Development Services; Building & Code Regulation Division
Date:
Contractor:
Job Address:
2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE R402.4.1.2
House Infiltration Test (Blower Door) Certification
Prescriptive and Performance Method
_ Permit #: l 1412
Construction: (k) New Construction — Complete ( ) Existing — After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM (50) = 1 `f 7 Test Date: h 3Lls
Volume = i ,7l �
ACH (50) = CFM (50) x 60 / Volume = �.6,e Mechanical Ventilation required less than 3 ACH
Passing results must be & ACH (50).or less ()0 Pass ( ) Fail
FBC, Energy
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting
shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105
(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party
conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
FBC, Residential
R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when
tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida
Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in
accordance with Section M1507.3.
Testing Company L
Company Name:
I hereby certify t the ai
requireme in accordant
Signature:
Printed Na
9570 aw Uj d
Address: jr' C60rnv1
Infiltration results demonstrate compliance with FBC Energy Conservation
with Section R402.4.1.2 Climate Zone 2.
vi
License/Certification #: 0 'y b�
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772- 462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
% Prescriptive and Performance
/Method
17
Date: � / 3 y Permit #: 6 Z[ 4� U� (o S/ Lot #: �5d - 0
Contractor: �° Ho(vvi Address: -m q 611L*4e �Ir Pfi, Q t Pfce F-/ -34 q
Construction: Wost Construction Test ❑ Rough -in Test
Test Conditions: 811shy
Date: Floor Area (ft2):
Time: `)" 30 qM Primary Location of Supply Ductwork G
Indoor Temperature (F): Primary Location of Return Ductwork
Outdoor Temperature (F):
Total Leakage Test (Outside)
Duct Leakage: Default ❑ Prop. Leak Free ❑ Proposed On =
Test Pressure: Z5 (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ExPass ❑ Fail
Installed Pa
a 0'5 Total Leakage (cfm):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
Testing Company
Company
,certify that the
R403.2.2.
QS 7m II�e�nc �goare �)�
Address:i(.lCsortVl�Q
Duct Sealing Leakage results demonstrate compliance with 51h Edition FBC Energy Conservation requirements in accordance with
Printed Na Ct M 6 M License/Certificate M