Loading...
HomeMy WebLinkAboutFBC ENERGY CONSERVATION CODE-7r r Planning & Development Services; Building & Code Regulation Division Date: Contractor: Job Address: 2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE R402.4.1.2 House Infiltration Test (Blower Door) Certification Prescriptive and Performance Method _ Permit #: l 1412 Construction: (k) New Construction — Complete ( ) Existing — After Addition House Infiltration Test Results SLC Climate Zone 2 CFM (50) = 1 `f 7 Test Date: h 3Lls Volume = i ,7l � ACH (50) = CFM (50) x 60 / Volume = �.6,e Mechanical Ventilation required less than 3 ACH Passing results must be & ACH (50).or less ()0 Pass ( ) Fail FBC, Energy R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testing Company L Company Name: I hereby certify t the ai requireme in accordant Signature: Printed Na 9570 aw Uj d Address: jr' C60rnv1 Infiltration results demonstrate compliance with FBC Energy Conservation with Section R402.4.1.2 Climate Zone 2. vi License/Certification #: 0 'y b� Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772- 462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification % Prescriptive and Performance /Method 17 Date: � / 3 y Permit #: 6 Z[ 4� U� (o S/ Lot #: �5d - 0 Contractor: �° Ho(vvi Address: -m q 611L*4e �Ir Pfi, Q t Pfce F-/ -34 q Construction: Wost Construction Test ❑ Rough -in Test Test Conditions: 811shy Date: Floor Area (ft2): Time: `)" 30 qM Primary Location of Supply Ductwork G Indoor Temperature (F): Primary Location of Return Ductwork Outdoor Temperature (F): Total Leakage Test (Outside) Duct Leakage: Default ❑ Prop. Leak Free ❑ Proposed On = Test Pressure: Z5 (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ExPass ❑ Fail Installed Pa a 0'5 Total Leakage (cfm): Total Leakage per 100 sgft: CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. Testing Company Company ,certify that the R403.2.2. QS 7m II�e�nc �goare �)� Address:i(.lCsortVl�Q Duct Sealing Leakage results demonstrate compliance with 51h Edition FBC Energy Conservation requirements in accordance with Printed Na Ct M 6 M License/Certificate M