HomeMy WebLinkAboutBLOWER DOOR TEST FORMPlanning & Development Services
f� cA ��� _ 'uN _ Building & Code Regulation Division
2300 Virginia Ave, Rm 201
► Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
Date:
Contractor:
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
Q�/� aPermit #: i.ZEL 04�
Job Address:
Construction:
(�C bbl eS fir``vim; � r_4-- P� e-rce- I �- .5 f 145
(New Construction — Complete ( ) Existing —After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM (50) _ Test Date: l o ? � � IC]
Volume = % NI -7 / Cv,
ACH (50) = CFM (50) x 60 / Volume = P 4. d Me anical Ventilation required less than 5 ACH
Passing results must be & ACH (50) or less Mass (' ) Fail
FBC, Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g)'or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Testing Company "
Company Name: /fs �./e' f-eL Address:
I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservatio
requirements in acgrgiance witJrjgccti94R402.4.1.2 Climate Zone 2.
Signature:
Printed Name: af --k A
License/Certification #: 2') Y 01 V5(0
Planning & Development Services
Building & Code Regulation Division
_ 2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
. 772462-2165 Fax 772-462-6443
F8C ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: I o O S /o 1Se Permit #: / N — 0 4(' 2 Lot #
135
Contractor. t>12 \40 C' 'k-or Address: C O b' l eS fo r\0 br.
Construction: most Construction Test ❑ Rough -in Test P(p—a'e , FL, 3 qc(4-5
Test Conditions:
Date: % O'Sho Floor Area (ft2): J672—
Time: 0; mf ism Primary Location of Supply Ductwork all(HG
Indoor Temperature (F): Vrf ° Primary Location of Return Ductwork �_&f 110 r
Outdoor Temperature (F): SSZ
Total Leakage Test (Outside) 2
Duct Leakage: ❑ Default ❑ Prop. Leak Free posed On
Test Pressure: 25 (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Pass ❑ Fail
Installed Pa
Total Leakage (cfm): 3 `�• 3
Total Leakage per 100 sgfk
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sq%
Testin4 Comaanv
i- r--
Company Name:) t? C Address:
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 51) Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: nn `//+� �/
Printed Name: �I v�Q iy LGZ( /1 License/Certificate#: 2_1� Q V 5
OCT 05 2018
le nt
St. Lucie COUnty, FL