Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTv.,..;,.__� Phone 954-784-2941 RE 1919 ederal—'­ 954-784EL -7875 Fax 954-T84.7875 TESTING INC. J U N 0 8 "J1 8 www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density - ompacted-&"H6 Method D-6938 Project: Proposed Residence Lot 135, Creekside Date: June 7, 2018 Address: 8400 Cobblestone Drive, Fort Pierce, FL Order #: 18DR480. Area Tested: Building Pad Permit Material Type: Pale Brown Sand Tech: BK Client: D.R. -Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: Palm Bay, 'FL 32907 Proctor Method: 95% ASTM D-1557 Test ## TEST LOCATION Probe Depth Elev. Moist a � ry DeDnsity PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 12.7 99.8 101.9 14.0 97.9% Yes 2 NE Corner of Building Pad 12" FL 13.0 99.0 101.9 14.0 97.2% Yes 3 SW Corner of Building Pad 12" FL 13.:1 100.2 101.9 14.0 98.3% Yes 4 5 6 7 8 9 10 11. 12 Y: 13 14 \\\11oHN `` �S� Remarks: See Reverse Side (Page 2 of 2 for Additional Information for Disclaimer �� ��ACEN' �i This is a Compaction Test onlyon the top 12" of the pad and is not a verification of So Ca ci . Legend for Elevation: ; PR='Proofroll• 1,2,3 = 1st, 2nd, 3rd Lift, Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.inE= STAT E/r SG = Sub grade BG = Below Grade Federal Engineer11 / ; �� 9 s� Q� C. . BC = Basecourse BOF =Bottom of Footing Florida Reg. No. 5934<e `ORID�•'�N# TOP =Top of Pipe FG =Finished Grade Certificate of Authorizat o`�d AL 0"G��� As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property. of clients, and authorization for fcreP94 AtibuVents, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degr 'AOt terial• only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil ma o se s t . e r suits.-, do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying so s w s p the ro clure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitabilityof the underlying soli to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Phone 954.784-2941 800-848-1919 Aederbi Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SIN 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 135, Creekside Date: June 7, 2018 Address: 8400 Cobblestone Drive, Fort Pierce, FL Order #: 18DR480 Area Tested: Building Pad Permit #: I ZyZ- 06 Al Material Type: Pale Brown Sand Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: Palm Bay, FL 32907 Proctor Method: 95% ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimu �m moisture Compaction Pass 1 Center of Building Pad 12" FL 12.7 99.8 101.9 14.0 97.9% Yes 2 NE Corner of Building Pad 12" 1 FL 13.0 99.0 101.9 14.0 97.2% Yes 3 SW Corner of Building Pad 12" FL 13.1 100.2 101.9 14.0 98.3% Yes 4., 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side This is a ge 2 of 2) for Additional Inform Test only on the top 12" of the Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift for Disclaimer and is not a verification of Submitted by: Lft�- SL = Springline FL = Final Lift Keith LeBlanc,,P.E.,. ' SG = Subgrade BG = Below Grade Federal Eagineering,,�,Testing; Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg.,No. 59394 TOP = Top of Pipe FG = Finished Grade Certificate,of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients -,'.and -,authorization for -publication of stzfements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degreo`of.compaction of the t6sted hyar'df material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil mater'rals'6elow type' proposed strucure The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlyin6seiils wlll supporI,16 ; proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to a ialuaf'4he suitability of the underlying soil to support the proposed structure. After laying dormant for a period of W days or after heavy rain/storms, retesting must be performed on "this work.' PAGE 1 of 2 Compa Soils Method D-6938, Disclaimer Pursuant to your request, Federal Engineering &Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to constructio to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not cor?tracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard `for building foundations and 98% of the AASHTO T-180 standard Tor paved areas such as roadways and` parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the,date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site distilrbances due to water erosion, rain waters, construction activities, excavations,' overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. - As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or. regarding our reports is reserved pending written approval. It has been a pleasure working with you we look forward to doing so in the near future. Page 2 of 2