Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTs_ Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 17(-2- - 6 � 1 BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #: B ADDRESS: $" 33� �56�- M We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 2�4 Percentage of solution: Z3% Date of Treatment: 13 ) lg Footing 1"-Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: %CcA-C_cXOf Total gallons used: 2 G cg1 Time of Treatment: Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final Inspection L � I -- .0 101 Signature of Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged, FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, are treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment s be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be place the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014